HomeMy WebLinkAboutRESOLUTIONS - 04191988 - 88-216 TO: BOARD OF SUPERVISORS (�,(y'�}
ra
FROM: Supervisor Nancy Fanden `�""`
District 2 Costa
DATE: April 12, 1988 Coin`y
SUBJECT: Benicia-Martinez Bridge Mitigations
SPECIFIC REQUEST(S) OR RECOMMENDATIONS(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
1 . Adopt the attached resolution dealing with the CALTRANS plan
for widening the existing Benicia - Martinez Bridge between
City of Benicia in Solano County and Martinez in Contra Costa
County. The resolution makes 3 main points: the bridge
improvement is necessary, CALTRANS needs to provide for
pedestrian and bicycle access on the bridge, and that if
project reconstruction for engineering reasons, cannot provide
for such access that alternative methods of access e.g. ferry
service need to be implemented.
2. Refer the resolution to CALTRANS, the Bay Conservation and
Development Commission and the cities of Martinez and Benicia.
FISCAL IMPACT
There are no known financial impacts on the County should this
position be taken. There will be an impact on the CALTRANS budget
for implementation of this trail proposed.
BACKGROUND/REASONS FOR RECOMMENDATIONS
CALTRANS has committed to the improvement to the existing
Benicia-Martinez Bridge. That bridge currently has 4 lanes in each
direction. CALTRANS proposes to widen the bridge to six lanes, as
well as, provide for a north bound truck climbing lane and an
auxiliary lane in the south bound direction. CALTRANS proposes to
begin construction on the bridge improvements in June 1988 and to
complete the project within 3 years (by June 1991) .
CONTINUED ON ATTACHMENT: YES SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEI
APPROVE OTHER
SIGNATURE(S) :
ACTION OF BOARD ON APR 19 19AR APPROVED AS RECOMMENDED >e, OTHER _
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
_
UNANIMOUS (ABSENT Z ) TRUE AND CORRECT COPY OF AN
AYES: NOES: - ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
cc: Community Development ATTESTED APR 191988
County Administrator PHIL BATCHELOR, CLERK OF
BCDC THE BOARD OF SUPERVISORS
Benicia AND CO ADMINISTRATOR
Martinez
CALTRANS District 4 BY DEPUTY
7 7 S'
Senator Lockyer carried a Bill (SB 100 ) which is now law which
directed the Association of Bay Area Governments to plan for a 250
mile "ring-around-the-Bay" . That planning effort is underway and one
of the main .issues is how the trail connection between Martinez and
Benicia will be accomplished. Ultimately, there will have to be a
trail connection via bridge across the Carquinez Straits. BCDC
currently has before if the application of CALTRANS for constructing
the bridge improvements. It would seem appropriate for this County tc
request that this project be designed to accommodate a trail access.
Only if that trail access is not feasible from an engineering point of
view, should it not be mandated as part .of this project. If that
turns out to be the case then CALTRANS should be obligated to offset
the impacts of this project by providing for an alternative method to
make this trail connection such as via regularly scheduled ferry boat
service.
Lastly, the improvement to this bridge is warranted to ease the
congestion which presently occurs and the County should restate its
support for this improvement.
c/benmar.bos