Loading...
HomeMy WebLinkAboutMINUTES - 06242008 - C.85 Contra..............TO: BOARD OF SUPERVISORS, AS GOVERNING = BOARD OF THE FLOOD CONTROL& WATER CONSERVATION DISTRICT - G ; ;=�;� Cost's .FROM: JULIA R. BUEREN, CHIEF ENG1NEER County DATE: lune 24, 2008 SUBJECT: CONT'IN-UE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 313 Funds) (Districts II & IV) Project No. 7520-668345 SPFC:IFIC:KI_QUfiti"r(S)OR R1=.CO!%'1MI-N!I.)A"I-ION(S)\BACKGROUND AND.IUSTIFIC\TION RECOMMENDED ACTION: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on Apri 1 10,2007,pursuant to Public Contract Code Sections 22035 and 22050,to implement the Lower Walnut Creek Lnterim Protection Measures project, Pacheco area. FISCAL IMPACT: The total estimated contract cost is $8,500,000, funded by Flood Control Zone 313 Funds. CONTINUF.D ON M'TACHMENT: ❑x SIGNATU _. RECO\i.IE:NDATION OF COUNTY AWMIN'ISTI(A7.011 KE:C(.)\I!NIENDATION o IOAI(U(;()\ . '" E�E AI'm1ovi" OTHER :\C::IION OF BOARD ON ��� . 7a Gll�/� AI'PRtJ\•'I-u r\S IZI.C:Otii\• \DI_I:) 'V 0 11-R \10'11 01 SUPERVISORS: 1 1IER1713Y C1K'I'lI Y'I I IAT I'I IIS ISA TKIJ1 AND CORRECT COPY OF AN ACTION TAKFN AND 1'.NTF_K6D ON UNANINIOI IS(ABSENT ) MINUTES OF THE BOARD 01: SLA TIMSORS ON THI: AYES: NO S: DATI7 SI IOWN. ABSENT: ABSTAIN: C011taCt: GregConnaughton(9_25)313-2271 (iC:l'D:eWI- F i G:\EldCtl\Board Ch'dcrs 2Q05 On��ard\2UOS 130\Lut�'rt'\\lalnut(:rcrk 13mergcncy BO AT'f1STLDy 6-344)8.da .101 IN CUI_L.I_\,CLERK OP THE BOARD OF SIJI'I:;.KVISORS ee: County Administrator' Auditor—Controller e S Public\Yorks: Rdia R.13uet'cn,Chid Iatgineer BY:�<J U✓(� DEPUTY R.Flitch Avalon.Deputy Chief Engineer Key in lanigh,Construction Greg Cunnaughton.1-100d C01111-01 i1 POt11 Drtjens.Flood Control SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 313 Funds) (Districts II & IV) Project No. 7520-6138345 DATE: June 24, 2008 PAGE: 2 of 2 REASONS FOR RECOMMENDATi.ONS AND BACKGROUND: A. On April 10, 2007, the Board of Supervisors declared an emergency and authorized the Chief Engineer to proceed in the most expeditious manner to repair or replace the Lower Walnut Creek flood control facility as directed by the US Army Corps of Engineers. B. Repair status: The Contra Costa County Flood Control and Water Conservation District(District)prepared the Lower Walnut Creek Corrective ActionPlan and presented it to the US Army Corps of Engineers for consideration on June 1 1., 2007. A status report, including this Corrective Action Plan (CAP),was presented to the Transportation,Water and Infrastructure Committee on .lune 25, 2007. Project plans were prepared and the District contracted with Pacific States Environmental Consultants to construct the first phase of the Lower Walnut Creek Interim Protection Measures project pursuant to the CAP. This first phase of the project was completed in early December 2007. However, additional work is required to fully implement the CAP. The CAP is currently under-review by US Army Corps of Engineers Headquarters. The full scope and schedule of the CAP will not be known until completion of the federal review. CONSEQUENCES OF NEGATIVE ACTION: No11co11Cu1'1'ence with the above recommendation may signilica.ntly delay implementation of the remaining CAP work in Lower Walnut Creek flood control facility and prevent the District from meeting the correction schedule required by the US Army Corps of Engineers.