TO: BOARD OF SUPERVISORS ====,, -__ Contra
FROM: JULIA R. BUEREN, PUBLIC WORKS DIRECTOR C O S t a
l
DATE: June 17,2008 '.o - �w`4 Count
A �onK�
SUBJECT: Accept completion of warranty period and release of cash deposit for faithful performance for
the Subdivision Agreement (Right-of-Way Landscaping), Road Acceptance 02-01130 (cross-
reference Subdivision 95-07976), for project being developed by Brookfield Ambridge, LLC.,
San Ramon (Dougherty Valley) area. (District III)
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION l°
RECOMMENDATION(S): _.
ADOPT Resolution No. 2008/ 390 for Road Acceptance 02-01130 (cross-reference Subdivision 95-07976;
accepting completion of warranty period and release of cash deposit for faithful performance for 1 the
Subdivision Agreement (Right-9f--Way Landscaping), for project being developed by Brookfield Ambridge,
LLC., San Ramon (Dougherty Valley) area. (District III)
FISCAL IMPACT:
None.
BACKGROUND/REASON(S) FOR RECOMMENDATION(S):
The (Right-of-Way Landscaping) improvements have met the guarantee performance standards for the warranty
period following completion of improvements.
CONSEQUENCES OF NEGATIVE ACTION:
The developer will not receive a refund of their cash deposit, the Subdivision Agreement (Right-of-Way
Landscaping) and performance surety bond will not be exonerated, and the billing account will not be liquidated
and closed.
Continued / Aw� 14.o���
C on Attachment: / SIGNATURE:
_ ECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
_
PROVE OTHER
r
SIGNATURE
ACTION OF BO ON T4-n.2_e `.I !J!J>;( APPROVED AS RECOMMENDED �' OTHER
VOTE
of SUPE IUS( I herebycertify that this is a true and correct
UNANIMOUS(ABSENT ) y
AYES: NOES: copy of an action taken and entered on the
ABSENT: ABSTAIN: minutes of the Board of Supervisors on the
BBJc date shown.
G:\EngSvc\BO\200M06-10\RA 02-01130 BO-60A FORM.docx
Originator: Public Works(ES)
Contact: T.Ric(313-2363) -
cc: Public Works -M.Valdez,M&T Lab ATTESTED:
-Construction
-D.Spinate,Engineering Services
1.Bergeron,Mapping JOHN CULLEN� Jerk f the Board of
-
Current Planning,Community Development Supervisors and Count Administrator
C.Low,City of San Ramon p y
2222 Camino Raman,San Ramon,CA 94583 t
Brookfield Ambridge,LLC.
5960 Inglewood Drive,Suite 200
Pleasanton, By ,Deputy
Attn:Daniel R.R.More More
American Casualty Co.of Reading,Pennsylvania
CNA Plaza,13 South
Chicago,IL 68685
Attn:Virginia Cupland
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Resolution on June 17, 2008 by the following vote:
AYES: GIOIA,UILKEMA,PIEPHO,BONILLA&GLOVER
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
—--- — _ -� RESOLUTION NO. 2008/;3ry7
SUBJECT: Accepting completion of warranty period and release of cash deposit for faithful
performance for the Subdivision Agreement (Right-of-Way Landscaping), Road
Acceptance 02-01130 (cross-reference Subdivision 95-07976), for project being
developed by Brookfield Ambridge, LLC., San Ramon (Dougherty Valley) area.
(District III)
On May 9, 2006, this Board resolved that the landscape improvements in Road
Acceptance 02-01130 (cross-reference Subdivision 95-07976), were completed as provided in
the Subdivision Agreement (Right-of-Way Landscaping) with Brookfield Ambridge, LLC. and
now on the recommendation of the Public Works Director;
The Board hereby FINDS that the improvements have satisfactorily met the guaranteed
performance standards for the period following completion and acceptance. NOW THEREFORE
BE IT RESOLVED that the Public Works Director is AUTHORIZED to:
• REFUND the $1,100.00 cash deposit (Auditor's Deposit. Permit No. 399708,
dated January 31, 2003) plus interest to Brookfield Ambridge, LLC in accordance
with Government Code Section 53079 (if appropriate), Ordinance Code Section
94-4.406, and the subdivision agreement.
BE IT FURTHER RESOLVED that upon completion of the warranty and maintenance
period, the San Ramon City Council shall accept the landscape improvements for maintenance in
accordance with the Dougherty Valley Memorandum of Understanding.
BE IT FURTHER RESOLVED that the warranty period has been completed and the
Subdivision Agreement (Right-of-Way Landscaping) and surety bond, Bond No. 58608915,
dated January 27, 2003, issued by American Casualty Co. of Reading, Pennsylvania, are
exonerated.
BBjc I hereby certify that this is a true and correct copy of an
G:\EngSvc\$0\2008\06-I0\RA 02-01130 BO-60A FOP M.docx action taken and entered on the minutes of the Board of
Originator: Public Works(ES)
Contact: Ric -2363) Supervisors on the date shown.
cc: Public
Works Worksrks -M.Valdez,M&T Lab p
-Construction
-D.Spinale,Engineering Services
-I.Bergeron,Mapping
Current Planning,Community Development ATTESTED:
C2222CCaminofSRamoRamoanRamon,
CA 94583 JOHN CULLEN, Clerk of the' oard of Supervisors and
Brookfield Ambridge,LLC.
5960 Inglewood Drive,Suite 200 County A 'm trator
Pleasanton,CA 94588
Attn:Daniel R.More
American Casualty Co.of Reading,Pennsylvania
CNA Plaza,13 South
Chicago,IL 68685 By , Deputy
Attn:Virginia Cupland
RESOLUTION NO.2008/ O