I'O: BOARD OF SUPERVISORS, AS GOVERNING
BOARD OF THE. FLOOD CONTROL& WATER
� ter__.'�-� �;•
CONSERVATION DISTRICT Costa
FROM: JULIA R. BUEREN, CHIEF .ENGINEER County
DATE: May 6, 2005
SUBJECT: CONTINUE the emergency action originally taken by the Board Of Supervisors on April 10, 2007,
regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control
Zone 313 Funds) (Districts II & IV) Project No. 7520-6135345
SI'I CII I(:'RI QI ILS'I(Sj(7R RFCOMMENDA'IION(S)&BACKGROUND ANDJ USTIFICATION
RECOMMENDED ACTION:
DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on
April 10,2007, pursuant to Public Contract Code Sections 22035 and 22050,to implement the Lover Walnut Creek
Interim Protection Measures project, Pacheco area.
FISCAL IMPACT:
The total estimated contract cost is $5,500,000, funded by Flood Control Zone 313 Funds.
CONTINUED ON A'I-'-rA(,l1 M F NT: x❑ SIGNATURE'
RE AIENUAT10 ()H'BOARD(.'O\ . I EE
APPROVE OTIIER
SIGN ATtiRE(S):
ACTION OP IVIt. ON r 20 \I'I'ROVED AS RC0�9
I N11iNDL•D � C ER
VO FL(A'SUPERVISORS: IN REBYCERTIFYTIIATTHISISATRITEAiNDCORRECT
COPY OF AN ACTION 'IAKFN AND GNTFRED ON
UNANIMOUS(ABSENT ) MINUTES 01: IIIE BOARD 01 SUPERVISORS (.)N THE
AYES: N()FS: DATI SIIOWN.
A13SENT. ABSTAIN:
Conetcc Grcg ConnamJiton(925)313-2270
CIC:I'D:c1\' �
<:i:\Hd(.al\I3omn1 Orden 2005(hiward\2008 130\I_0Wc1-\Valnut Creek Emertincy 130 r1"fTLS'I'ID
�-06-08.doc .JOAN CUT. .0-FRK OF ITIR 130ARD OF
Sli 1,1.
RVIGAKSN
cc: County Administrator
Auditor—C'onuoller
PLIMIe\York;:
Julia R. 1311cren.C'hiel I.ngincrr'. BY: ���DITUT)'
R. Aitch Avalon.Depnly C:hiel Engincer
Kevin I:ntiah.('011SIrn CUUn
Greg CunnI "Ilton;1'I00d C01111-01
Paul Drljens.Mood CUnu'ol
SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007,
regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area.
(Flood Control Zone 3B Funds) (Districts 11. & I.V) Project No. 7520-6B8345
DATE: May G, 2008
PAGE: 2 of 2
REASONS FOR RECOM1V ENDAT.WNS AND .BACKGROUND:
A. On April 10, 2007, the Board of Supervisors declared an emergency and authorized the Chief Engineer to
proceed in the most expeditious manner to repair or replace the Lower WahlLlt Creek flood control facility as
directed by the US Army Corps of Engineers.
B. Repair status:
The Contra Costa County Flood Control and Water Conservation District(District)prepared the Lower Walnut
Creek Corrective Action Plan and presented it to the US Army Corps of Engineers for consideration on June 11,
2007. A status report, including this Corrective Action Plan(CAP),was presented to the Transportation, Water
and LlllraStruCtUre Committee on June 25, 2007. Project plans were prepared and the District contracted with
Pacific States Environmental COIISIIltants to construct the first phase of the Lower Walnut Creek Interilll
Protection Measures project pw-Suant to the CAP. This first phase of the project was completed in early
December 2007. However, additional work is required to fully implement the CAP.
The CAP is Currently under review by US Army Corps of Engineers Headquarters. The full scope and schedule
of the CAP will not be known until completion of the federal review.
CONSEQUENCES OF NEGATIVE ACTION:
NOl1C011Clllrence with the above recommendation may significantly delay Implementation ofthe remallllllg CAP
work In Lower Walllllt Creek flood Control facility and prevent the District frons meeting the Correction schedule
required by the US Army Corps of Engineers.