Loading...
HomeMy WebLinkAboutMINUTES - 05062008 - C.88 ` ' _ Contra I'O: BOARD OF SUPERVISORS, AS GOVERNING BOARD OF THE. FLOOD CONTROL& WATER � ter__.'�-� �;• CONSERVATION DISTRICT Costa FROM: JULIA R. BUEREN, CHIEF .ENGINEER County DATE: May 6, 2005 SUBJECT: CONTINUE the emergency action originally taken by the Board Of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 313 Funds) (Districts II & IV) Project No. 7520-6135345 SI'I CII I(:'RI QI ILS'I(Sj(7R RFCOMMENDA'IION(S)&BACKGROUND ANDJ USTIFICATION RECOMMENDED ACTION: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on April 10,2007, pursuant to Public Contract Code Sections 22035 and 22050,to implement the Lover Walnut Creek Interim Protection Measures project, Pacheco area. FISCAL IMPACT: The total estimated contract cost is $5,500,000, funded by Flood Control Zone 313 Funds. CONTINUED ON A'I-'-rA(,l1 M F NT: x❑ SIGNATURE' RE AIENUAT10 ()H'BOARD(.'O\ . I EE APPROVE OTIIER SIGN ATtiRE(S): ACTION OP IVIt. ON r 20 \I'I'ROVED AS RC0�9 I N11iNDL•D � C ER VO FL(A'SUPERVISORS: IN REBYCERTIFYTIIATTHISISATRITEAiNDCORRECT COPY OF AN ACTION 'IAKFN AND GNTFRED ON UNANIMOUS(ABSENT ) MINUTES 01: IIIE BOARD 01 SUPERVISORS (.)N THE AYES: N()FS: DATI SIIOWN. A13SENT. ABSTAIN: Conetcc Grcg ConnamJiton(925)313-2270 CIC:I'D:c1\' � <:i:\Hd(.al\I3omn1 Orden 2005(hiward\2008 130\I_0Wc1-\Valnut Creek Emertincy 130 r1"fTLS'I'ID �-06-08.doc .JOAN CUT. .0-FRK OF ITIR 130ARD OF Sli 1,1. RVIGAKSN cc: County Administrator Auditor—C'onuoller PLIMIe\York;: Julia R. 1311cren.C'hiel I.ngincrr'. BY: ���DITUT)' R. Aitch Avalon.Depnly C:hiel Engincer Kevin I:ntiah.('011SIrn CUUn Greg CunnI "Ilton;1'I00d C01111-01 Paul Drljens.Mood CUnu'ol SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts 11. & I.V) Project No. 7520-6B8345 DATE: May G, 2008 PAGE: 2 of 2 REASONS FOR RECOM1V ENDAT.WNS AND .BACKGROUND: A. On April 10, 2007, the Board of Supervisors declared an emergency and authorized the Chief Engineer to proceed in the most expeditious manner to repair or replace the Lower WahlLlt Creek flood control facility as directed by the US Army Corps of Engineers. B. Repair status: The Contra Costa County Flood Control and Water Conservation District(District)prepared the Lower Walnut Creek Corrective Action Plan and presented it to the US Army Corps of Engineers for consideration on June 11, 2007. A status report, including this Corrective Action Plan(CAP),was presented to the Transportation, Water and LlllraStruCtUre Committee on June 25, 2007. Project plans were prepared and the District contracted with Pacific States Environmental COIISIIltants to construct the first phase of the Lower Walnut Creek Interilll Protection Measures project pw-Suant to the CAP. This first phase of the project was completed in early December 2007. However, additional work is required to fully implement the CAP. The CAP is Currently under review by US Army Corps of Engineers Headquarters. The full scope and schedule of the CAP will not be known until completion of the federal review. CONSEQUENCES OF NEGATIVE ACTION: NOl1C011Clllrence with the above recommendation may significantly delay Implementation ofthe remallllllg CAP work In Lower Walllllt Creek flood Control facility and prevent the District frons meeting the Correction schedule required by the US Army Corps of Engineers.