Loading...
HomeMy WebLinkAboutMINUTES - 03182008 - C.73 C. 73 TO: BOARD OF SUPERVISORS, AS GOVERNING Contra`�'=� `�'`' BOARD OF THE FLOOD CONTROL & WATER. ,' ~ _ Costa CONSERVATION DISTRICT oiP �� FROM: MAURICE M. SI--IIU, CHIEF ENGINEER ` "��` County DATE: March 18, 2008 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 313 Funds) (Districts 1.1 & IV) Project No. 7520-6BS345 SPECIFIC REQUESTS)OR RLC'OMMENDAIION(S) BACKGROUND AND.IUSTIFIC'AIION . RECOMMENDED ACTION: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on April 10,2007,pursuant to-Public Contract Codc Sections 22035 and 22050,to implement the Lower Walnut Creek Interim Protection Measures project,.Pacheco area. FISCAL. IMPACT: The total estimated contract cost is S8,500,000, funded by Flood Control Zone 3B Funds. CONTINUED ON ATTACHMENT: ❑x SIGNATUR RF,('O-,INIEVDA"I'IONOF(:'Ot[NTN'ADi\11VIs"r12ATOR RECONEN1EVDA"I'10\ 13()ARI ('O I"" EE APPROVE. (YrIIER SIGNATI RE(S): ACTION OF BO,, ) "N ( �GV(� APPR(:)VI{)AS RECOMMI NIA:I) ~ (3i(I IF.R VO-I:OF SUPERVISORS: I I II RI:BY('I RTIFY TI IAT T IIS IS A TRI IE AND C'CW1zI.0-T COPY OF AN AC'I'ION TAKFN AND EN'IFR1i1) ON I INANIM(.)1_IS(.ABSEN f ) MIND IIS OF THE BOARD OF SUPERVISORS ON THE AYLS: NOFS: DATE SHOWN. ABSENT: ABSTAIN: Contact: Greg Connaughton(92 5)±132270 G:`IFId01\C3oard Orders 2005(.hiward`:2008 130\1.nwcr Walnut C'rccl:Limergency C30 A-1"I I:[S I'I{I) 3-I R Oti.dix JOHN CULLEN,C 1:RK OF TI IE BOARD OI' SUPI:RVIS(:)RS cc: Counh•Adininislralor Auditor—Contrullcr Public Works: 1 - Maurice M.Shiu,Chief Engineer BY: DEPI.i'11' R.Mitch Avalon,Deputy Chief Lngincer Kevin Emieh,C'on5ll"UCLI011 (iregtonnaughron, :food Control Paul Deljeas,Flood Control C 73 SUBJECT: CONTINUE the.emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts lI & IV) Project No. 7520-6138345 DATE: Marcll 18, 2008 PAGE: 2 of 2 REASONS FOR RECOMMENDATIONS AND BACKGROUND: . A. On April 10, 2007, the Board of Supervisors declared an cmer:gency and authorized the Chief Engineer to proceed in the most expeditious manner to repair or replace the Lower Walnut Creek flood control facility as directed by the US Army Corps of Engineers. B. Repair status: The Contra Costa County Flood Control and Water Conservation District(District)prepared the Lower Walnut Creek Corrective Action Plan and presented it to the.US Army Corps of Engineers for consideration on.lune 11, 2007. A status report, including this Corrective Action Plan(CAP),was presented to the Transportation,Water and Inlrastructure Conirrrittee on .iune.25, 2007. Project plans were prepared and the District contracted with Pacific States Environmental Consultants to construct the first phase of the Lower Walnut Creek Interim Protection Measures project pursuant to the CAP. This first phase of the project was completed in early December 2007. However, additional work is required to fully implement the CAP. The CAP is.currently under review by US Army Corps of Engineers Headquarters. The full scope and schedule ol'tlhe CAP will not be known until completion of the federal review. CONS EQUENCES'OF NEGATIVE. ACTION: NollcOnCUITenCe with the above recommendation may significantly delay implementation of the remaining CAP work in Lower Walnut Creel: flood control facility and prevent the Disirict from meeting the correction schedule required by the US Army Corps of Engineers.