Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MINUTES - 03112008 - C.98
TO: f BOARD OF SUPERVISORS ==- A FROM: MICHAEL J. LANGO, DIRECTOR OF GENERAL SERVICES ; COSTA DATE: MARCH 11, 2008 c°rra�a�r a� COUNTY SUBJECT: AUTHORIZE THE GENERAL SERVICES DIRECTOR, OR DESIGNEE, TO EXECUTE A CONTRACT WITH KITCHELL CEM IN THE AMOUNT OF $218,080 TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR THE EMPLOYMENT AND HUMAN SERVICES DEPARTMENT'S OFFICE REMODEL PROJECT AT 4545 DELTA FAIR BOULEVARD, ANTIOCH (WH394B) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDATION 1. APPROVE a Consulting Services Agreement dated March 11, 2008 through April 30, 2009 with Kitchell CEM ("Kitchell") in the amount of $218,080 to provide construction management services for the Employment and Human Services ("EHS") Department's Office Remodel project, 4545 Delta Fair Boulevard, Antioch. 2. AUTHORIZE the Director of General Services, or designee, to execute the agreement. FINANCIAL IMPACT Existing project funds, consisting of EHS appropriations and bond funds, will pay for the construction management services. BACKGROUND The 53,000 square foot county building located at 4545 Delta Fair Boulevard supports the CaIWORKS, Medi-Cal, Food Stamps, General Assistance, and IHSS (In Home Support Services) programs of the Employment and Human Services Department. The project involves a major remodeling of the building. The work will include the following key elements: • Improve the overall work environment and space efficiency for staff and clients, including new workstations; • Accommodate One-Stop Career Center staff and operations being relocated from leased facilities to be vacated at 415 Railroad Avenue in Pittsburg; • Replace the deteriorating gyperete second floor and replace it with a new plywood floor; • Increase the capacity of the undersized HVAC system; CONTINUED ON ATTACHMENT: X YES SIGNATURE:—A!L:_ RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE _OTHER SIGNATURE(S): ACTION OF B AR ON //'! / �0 0 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS �TNANIMOUS _) (ABSENT MEDIA CONTACT:MICHAEL J.LANGO(313-7100) Originating Dept.:General Services Department I HEREBY CERTIFY THAT THIS IS A TRUE cc: General Services Department AND CORRECT COPY OF AN ACTION TAKEN Capital Projects Management Division AND ENTERED ON THE MINUTES OF THE BOARD Accounting OF SUPERVISORS ON THE DATE SHOWN. CPM File: 305-9910/A.1.1 /���, /W�. JJ �� 305-9910/A.5 ATTESTED , �'I IC County Administrator's Office JOHN CULLEN,CLERK OF THE BOARD OFSUPERVISORS County Counsel AND COUNTY ADMINISTRATOR Auditor Controller 44� ©Employment&Human Services Department(via CPM) BY �i DEPUTY Kitchell(via CPM) . H:\1999\3059910\9B010061b.doc RL:tb Page 1 of 2 M382(10/88) AUTHORIZE THE GENERAL SERVICES DIRECTOR, OR March 11, 2008 / DESIGNEE, TO EXECUTE A CONTRACT WITH KITCHELL CEM IN THE AMOUNT OF $218,080 TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR THE EMPLOYMENT AND HUMAN SERVICES DEPARTMENT'S OFFICE REMODEL PROJECT AT 4545 DELTA FAIR BOULEVARD, ANTIOCH • Upgrade the electrical system to provide adequate power for current and future needs; • Address ADA deficiencies; • Upgrade the data/telecommunications system to meet current standards; • Replace the deteriorating roof. The project will be completed in phases to maintain program operations. Swing space will be provided in temporary trailers and in available space at the adjacent county building at 4549 Delta Fair Boulevard. In June 2006, the project was presented to the Capital Facilities Committee and the Committee recommended proceeding with the project. In May 2007, a design-build contract in the amount of $5,057,106 was approved by the Board of Supervisors. Trailers have been placed at the jobsite and the construction phase will commence in March 2008. Because of the scale and complexity of the project, it is recommended that a professional firm provide construction management ("CM") services for the project. The services to be provided include schedule and budget management, project team coordination, preparing and monitoring documentation logs, and move-in and close-out coordination. Kitchell was selected through a competitive selection process. HA1 999\305991 0\9B01 0061 b.doc Page 2 of 2 M382(10/88) l (vY Contra Costa County APPROVALS RECOMMENDED BY DEPARTMENT APPROVED AS TO FORM COUNTY CODUN EL l By: I By: Designee vreputy Re: Consulting Services Agreement dated March 11,2008 between Contra Costa County and Kitchell CEM for Construction Management Services for the Employment and Human Services Department's Office Remodel Project at 4545 Delta Fair Boulevard,Antioch L-2 (Page 1 of 1) Rev. 11/28/06