Loading...
HomeMy WebLinkAboutMINUTES - 03112008 - C.103 `a fraTO: BOARD OF SUPERVISORS, AS GOVERNING /= BOARD OF THE FLOOD CONTROL.& WATER CoONSERVATION DISTRICT s t a FROM: MAURICE M. SHIU, CHIEF ENGINEER t``��=�r� coUN"t� County DATE: March 11, 2008 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts II & IV)Project No. 7520-6138345 SPECIFIC RFQUEST(S)OR RI C'OMMENDATION(S)&BAC'KGROUND AND.IUS'I'IFI('A I'ION RECOMMENDED ACTION: DETERMINE that there 'is a need to continue the emergency action taken by the Board of Supervisors on -April 10,2007,pursuant to Public Contract Code Sections 22035 and 22050,to implement the Lower Walnut Creek Interim Protection Measures project, Pacheco area. FISCAL. IMPACT: The total estimated contract cost is $8,500,000, funded by Flood Control Zone 3B Funds. CONTINUED ON ATTACHMENT: El SIGNATURE: REC'OMNIENDATION OF COUNTY ADM INISTRAToIi RW15NINIE.NDATION O OARD C'OMMJTTFE �— APPROVE OTHER G SIG\ATURE(S): �g,�}l/�� ACTION OFBOA ON �yn 6[ &qV � APPROVED AS RECOMMENDED V Oj�I IFR VOTE OF Sl IPFRYVVVISORS: I I IEREBY C'I RTII;Y'TI IAT TI-IIS IS A TRUE AND CORRECT COPY OF AN AC:I ION "I AKEN AND ENTERED ON UNANIMOUS(ABSENT .� � > ) MINUTES or TME BOARD OF SUPERVISORS IN THE AYES: NOES: DAT SHOWN. ABSENT: rYl3STAIN: Contact: C:neg('unnaughlon O25)313-2270 (.i:\I--IdC'ti"13oard Orders 200 OnN"1I'd\2005 BO\Lower Walnut Creck T.rttergency BO ATTESTED 3 I I-0S.d x JOHN CULLEN,CLERK OF"THE BOARD OI- SUPERVISORS CC: County Administrator Auditor-Control ler .. I'uhliC Works: ti1aurice M.Shiu,Chief laigineer BY: DEPUTY R.Mitch Avalon,Deputy Chief Engineer Kevin Fimigh,C0115trLIC0011 i (dreg CUnnal1Y11R1n.Flood Control Paul Detjcns,Flood Control -'SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts II & IV) Project No. 7520-6B8345 DATE: March 11, 2008 PAGE: 2 of 2 REASONS FOR RECOMMENDATIONS AND BACKGROUND: A. On April 10, 2007, the Board of Supervisors declared all emergency and authorized the Chief Engineer to proceed in the most expeditious manner to repair or replace the Lower Walnut Creek flood control facility as directed by the US Army Corps of Engineers. B. Repair status: The Contra Costa County Flood Control and Water Conservation District(District)prepared the Lower Walnut Creek Corrective Action Plan and presented it to the US Army Corps of Engineers for consideration on June 11, 2007.. A status report, including this Corrective Action Plan(CAP),was presented to the Transportation, Water and Infi-astr.►cture Committee on June 25, 2007. Project plans were prepared and the District contracted with Pacific States Environmental Consultants to construct the first phase of the Lower Walnut Creek Interim Protection Measures project pursuant to the CAP. This first phase of the project was completed in early December 2007. However, additional work is required to fiully implement the CAP. The CAP is Currently under review by US Army Corps of Engineers Headquarters. The full scope and schedule of the CAP will not be known until completion of the federal review. CONSEOUENCES OF NEGATIVE ACTION: Nonconcurrence with the above recommendation may significantly delay implementation of the remaining CAP work in Lower Walnut Creek flood control facility and prevent the District from meeting the correction schedule required by the US Army Corps of Engineers.