HomeMy WebLinkAboutMINUTES - 04032007 - C.3 TO: BOARD OF SUPERVISORS ""s ... Contra
FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR Costa
DATE: Aril 3 2007 ...... ��` County
sr 't't
SUBJECT: DETERMINE that the San Pablo Avenue/Parker Avenue Sidewalk Improvements is a California
Environmental Quality Act Class 3 Categorical Exemption; APPROVE the project and
AUTHORIZE the Public Works Director,or designee,to advertise the project,Hercules area. (City
of Hercules (72%), Transportation Development Act (18%) and Road funds (10%)) (District II)
[CDD-CP# 06-123] Project No. 0676-6P1025
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
RECOMMENDED ACTION:
DETERMINE that the San Pablo Avenue/Parker Avenue Sidewalk Improvements project is a California
Environmental Quality Act (CEQA) Class 3 Categorical Exemption, and
DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk, and
AUTHORIZE the Public Works Director to arrange for payment of a $25 fee to Community Development for
processing, and a$50 fee to the County Clerk for filing the Notice of Exemption, and
APPROVE the project, and AUTHORIZE the Public Works Director, orej toodve 'se the project.
Continued on Attachment: ❑ SIGNATURE: G-
[KECOMMENDATION OF COUNTY ADMINISTRATOR ❑ RECOMMENDATION OF BOARD COMMITTEE .
®-`XPPROVE OTHER
SIGNATURE(S):
1
ACTION OF B069 ON
APPROVED AS RECOMMENDED OTHER ❑
VOTE SUPERVISORS I hereby certify that this is a true and correct copy of an action
UNANIMOUS(ABSENT � )
AYES: NOES: taken and entered on the minutes of the Board of Supervisors on
ABSENT: ABSTAIN: the date shown.
NA:sj ,(� d �`
G:\EngSvc\ENVIRO\BO\2007\(04-03-07)CEQA-San Pablo-Parker Sidewalk.doc ATTESTED: 1 1r 1 P3 _zAL0
Orig.Div:Public Works(Environmental Section) JOHN CULLEN,eLERK OF THE BOARD OF SUPERVISORS
Contact: Ngozi Ajawara,(313-2311) AND COUNTY ADMINISTRATOR
cc: Administrator–Attn.E.Kuevor
Auditor-Controller
H.Li,Community Development
J.Dowling,Construction BY ,Deputy
J.Hernandez,Transportation
N.Leary,Design
T.Torres,Environmental
Accounting
SUBJECT: DETERMINE that the San Pablo Avenue/Parker Avenue Sidewalk Improvements is a California
Environmental Quality Act Class 3 Categorical Exemption; APPROVE the project and
AUTHORIZE the Public Works Director or designee to advertise the project,Hercules area.(City of
Hercules (72%), Transportation Development Act (18%) and Road funds (10%)) (District II)
[CP#06-123] Project No. 0676-6P1025
DATE: April 3, 2007
PAGE: 2 of 2
FISCAL IMPACT:
The estimated project cost is $552,000; (72% funding by City of Hercules, 18% funding by Transportation
Development Act and 10% funding by Road funds).
REASONS FOR RECOMMENDATIONS AND BACKGROUND:
The purpose of this project is to install pedestrian facilities in order to close the gap in the sidewalk between the
community of Rodeo and the City of Hercules. Since there is currently no standard sidewalk,pedestrians share the
road shoulder with bicyclists. Construction of the pedestrian facilities will provide residents with an uninterrupted
sidewalk to access commercial and business centers in the area. The project is located on San Pablo Avenue
between Victoria Crescent and 7th Street,in the unincorporated portion of Rodeo,West Contra Costa County area.
The project consists of excavating existing roadway and substandard sidewalk,installing new sidewalks(approx. S
feet wide by 1,000 feet long),curb, gutter,curb ramps compliant with the Americans with Disabilities Act(ADA),
and removing and replacing a retaining wall,adjusting utilities,road signs,manholes,drainage inlets,shrubbery and
tree removal, conforming driveways, backfilling and grading to conform, and re-striping the road. Construction
activities will be located on the west side portion of Parker Avenue and the northwest side of San Pablo Avenue.
Limited tree removal is necessary to accommodate installation of the sidewalk and retaining wall. Approximately
six non-native trees ranging in size from 3"dbh to 10"dbh may have to be removed. One lane will remain open at
all times during construction. Utility and real property transactions, including right-of-way acquisition may be
necessary in support of this project. .
A portion of the project is within the City of Hercules. General Plan Conformance will be necessary from the City
of Hercules.
The project consists of construction and location of limited small new structures,including street improvements of
reasonable length to serve such construction,pursuant to section 15303 of CEQA.
The project will not result in the removal of any scenic resource.
CONSEQUENCES OF NEGATIVE ACTION:
Delay in approving the project will result in a delay of design and construction and may jeopardize funding.
Contra PUBLIC WORKS DEPARTMENT
Costa INITIAL STUDY OF
Countv ENVIRONMENTAL SIGNIFICANCE
PROJECT# 0676-01025
CP# 06- 123
PROJECT NAME: San Pablo Aved Parker Ave. Sidewalk Project, (between 7`h St. and Victoria Crescent)
PREPARED BY: Ngozi Ajawara 04 DATE: January 31, 2007
APPROVED BY: DATE: ru 'Z
RECOMMENDAT
® Categorical Exemption (Class 3d) ❑ Negative Declaration
❑ Environmental Impact Report Required ❑ Conditional Negative Declaration
The project will not have a significant effect on the environment. The recommendation is based on the
following: The project consists of construction of limited small new structures,including street improvements of reasonable
length to serve such construction. The project will not result in the removal of any scenic resource.
What changes to the project would mitigate the identified impacts: N/A
USGS Quad Sheet: Richmond Base Map Sheet#: E-7 Parcel#: N/A
GENERAL CONSIDERATIONS:
1. Location: The project is located on San Pablo Avenue between Victoria Crescent and 7t"Street,in the Rodeo
area. (Figs. 1-3)
2. Project Description: The purpose of.this project is to install pedestrian facilities in order to close the gap in
the sidewalk between the community of Rodeo and the City of Hercules. Since there is currently no standard
sidewalk, pedestrians share the road shoulder with.-bicyclists.- Construction of the pedestrian facilities will
provide residents with an uninterrupted sidewalk to access commercial and business centers in the area.
The project consists of excavating existing roadway and substandard sidewalk, installing new sidewalks
(approx. 5 feet wide by 1,000 feet long), curb, gutter, curb ramps compliant with the Americans with
Disabilities Act(ADA),and removing and replacing a retaining wall,adjusting utilities,road signs,manholes,
drainage inlets,shrubbery and tree removal,conforming driveways,backfilling and grading to conform,and re-
striping the road. Construction activities will be located on the west side portion of Parker Avenue and the
northwest side of San Pablo Avenue(Figs 1-3)
An existing retaining wall, adjacent to a portion of hillside will be removed and replaced with anew retaining
wall(approx. 10 ft. in height by 300 ft, in length) to create enough space for the appropriately sized sidewalk.
Minor grading of the hillside will be necessary to accommodate the new retaining wall and sidewalk. Also,
approximately 100 feet west of the intersection,an embankment will be constructed to allow for the installation
of the sidewalk, therefore heavy foliage will be trimmed. (Fig. 3)
Limited tree removal is necessary to accommodate installation' of the sidewalk and retaining wall.
Approximately six non-native trees ranging in size from 3"dbh to 10"dbh may have to be removed.
A portion of the project is within the City of Hercules(City).General Plan Conformance will be necessary from
the City of Hercules.
One lane will remain open at all times during construction. Utility relocation and real property transactions,
including right-of-way acquisition may be necessary in support of this project.
G:\EngSvc\ENVIRO\TransEng\San Pablo Ave.-Parker Ave. Sidewalk\CEQA\Initial Study (CE).doc
Updated: 11/2/04
San Pablo Ave./Parker Ave. Sidewalk(between 7`"St. and Victoria Crescent)
0676-61`1025/06— 123
Initial Study
Page 2 of 2
3. Does it appear that any feature of the project will generate significant public concern?
❑ yes N no ❑ maybe (Nature of concern):
4. Will the project require approval or permits by other than a County agency?
N yes ❑ no (Agency Name/s); City of Hercules
5. Is the project within the Sphere of Influence of any city? Hercules
G:\EngSvc\ENVIRO\TransEng\San Pablo Ave.-Parker Ave. Sidewalk\CEQA\Initial Study(CE).doc
Updated:11/2/04
CALIFORNIA ENVIRONMENTAL QUALITY ACT
Notice of Exemption
Contra Costa County Community Development Department
651 Pine Street, 4th Floor-North Wing, McBrien Administration Building
Martinez, CA 94553-0095
Telephone: (925) 313-2311 Contact Person: Ngozi Ajawara, Planner I, Public Works Dept.
Project Title, Description, Common Name (if any) and Location: San Pablo Ave/Parker Ave. Sidewalk
Improvements, Project No. 0676-61`1025 County File CP#06-123
Project Description: The purpose of this project is to install pedestrian facilities in order to close the gap in the
sidewalk between the community of Rodeo and the City of Hercules. Since there is currently no standard sidewalk,
pedestrians share the road shoulder with bicyclists. Construction of the pedestrian facilities will provide residents
with an uninterrupted sidewalk to access commercial and business centers in the area.
The project consists of excavating existing roadway and substandard sidewalk,installing new sidewalks(approx. 5
feet wide by 1,000 feet long),curb,gutter,curb ramps compliant with the Americans with Disabilities Act(ADA),
and removing and replacing a retaining wall, adjusting utilities, road signs,manholes, drainage inlets, shrubbery
and tree removal,conforming driveways,backfilling and grading to conform,and re-striping the road. Construction
activities will be located on the west side portion of Parker Avenue and the northwest side of San Pablo Avenue
An existing retaining wall, adjacent to a portion of hillside will be removed and replaced with anew retaining wall
(approx. 10 ft. in height by 300. t. in length) to create enough space for the appropriately sized sidewalk. Minor
grading of the hillside will be necessary to accommodate the new retaining wall and sidewalk. Also,approximately
100 feet west of the intersection, an embankment will be constructed to allow for the installation of the sidewalk,
therefore heavy foliage will be trimmed.
Limited tree removal is necessary to accommodate installation of the sidewalk and retaining wall. Approximately
six non-native trees ranging in size from 3"dbh to 10"dbh may have to be removed.
A portion of the project is within the City of Hercules(City). General Plan Conformance will be necessary from
the City of Hercules.
One lane will remain open at all times during construction. Utility and real property transactions,including right-of-
way acquisition may be necessary in support of this project.
Project Location: The project is located on San Pablo Avenue between Victoria Crescent and 7th Street.
This project is exempt from CEQA as'a:
❑ Ministerial Project(Sec. 15268) Q Categorical Exemption, Class 3
❑ Declared Emergency(Sec. 15269(a)) ❑ Other Statutory Exemption, Section
❑ Emergency Project(Sec. 15269(b)or(c)) ❑ General Rule of Applicability[Section 15061 (b) (3)1
For the following reason(s): The project consists of construction and location of limited small new structures, including street
improvements of reasonable length to serve such construction, pursuant to section 15303 of CEQA. The project will not result in the
removal of any scenic resource.
Date: By:
Community Development Department Representative
AFFIDAVIT OF FILING AND POSTING
I declare that on I received and posted this notice as required by California
Public Resources Code Section 21152(c). Said notice will remain posted for 30 days from the filing date.
Signature Title
Applicant: Department of Fish and Game Fees Due
Public Works Department ❑ EIR-$2,500 Total Due: $
255 Glacier Drive ❑Neg.Dec.-$1,800 Total Paid $
Martinez,CA 94553 ❑DeMinimis Findings-$0
Attn:Ngozi Aiawara ® County Clerk-$50 Receipt#:
Environmental Section ® Community Development Dept.-$25
G:\EngSvc\ENVIRO\TransEng\San Pablo Ave.-Parker Ave.Sidewal<\CEQA\NOE.doc Updated July 21,2006
CALIFORNIA ENVIRONMENTAL QUALITY ACT
Notice of Exemption
Contra Costa County Community Development Department
651 Pine Street, 4th Floor-North Wing, McBrien Administration Building
Martinez, CA 94553-0095
Telephone: (925) 313-2311 Contact Person: Ngozi Ajawara, Planner I, Public Works Dept.
Project Title, Description, Common Name (if any) and Location: San Pablo Ave/Parker Ave. Sidewalk
Improvements, Project No. 0676-6P1025 County File CP#06-123
Project Description: The purpose of this project is to install pedestrian facilities in order to close the gap in the
sidewalk between the community of Rodeo and the City of Hercules. Since there is currently no standard sidewalk,
pedestrians share the road shoulder with bicyclists. Construction of the pedestrian facilities will provide residents
with an uninterrupted sidewalk to access commercial and business centers in the area.
The project consists of excavating existing roadway and substandard sidewalk,installing new sidewalks(approx. 5
feet wide by 1,000 feet long),curb,gutter,curb ramps compliant with the Americans with Disabilities Act(ADA),
and removing and replacing a retaining wall, adjusting utilities,road signs,manholes,drainage inlets, shrubbery
and tree removal,conforming driveways,backfilling and grading to conform,and re-striping the road. Construction
activities will be located on the west side portion of Parker Avenue and the northwest side of San Pablo Avenue
An existing retaining wall, adjacent to a portion of hillside will be removed and replaced with anew retaining wall
(approx. 10 ft. in heir by 300 ft. in length) to create enough space for the appropriately sized sidewalk. Minor
grading of the hillside will be necessary to accommodate the new retaining wall and sidewalk. Also,approximately
100 feet west of the intersection, an embankment will be constructed to allow for the installation of the sidewalk,
therefore heavy foliage will be trimmed.
Limited tree removal is necessary to accommodate installation of the sidewalk and retaining wall. Approximately
six non-native trees ranging in size from 3"dbh to 10"dbh may have to be removed.
A portion of the project is within the City of Hercules (City). General Plan Conformance will be necessary from
the City.of Hercules.
One lane will remain open at all times during construction. Utility and real property transactions,including right-of-
way acquisition may be necessary in support of this project.
Project Location: The project is located on San Pablo Avenue between Victoria Crescent and 7th Street.
This project is exempt from CEQA as a:
❑ Ministerial Project(Sec. 15268) 0 Categorical Exemption, Class 3
❑ Declared Emergency(Sec. 15269(a)) ❑ Other Statutory Exemption, Section
❑ Emergency Project(Sec. 15269(b)or(c)) ❑ General Rule of Applicability(Section 15061 (6) (3)/
For the following reason(s): The project consists of construction and location of limited small new structures, including street
improvements of reasonable length to serve such construction, pursuant to section 15303 of CEQA. The project will not result in the
removal of any scenic resource.
Date: By:
Community Development Department Representative
AFFIDAVIT OF FILING AND POSTING
I declare that on I received and posted this notice as required by California
Public Resources Code Section 21152(c). Said notice will remain posted for 30 days from the filing date.
Signature Title
Applicant: Department of Fish and Game Fees Due
Public Works Department ❑ EIR-$2,500 Total Due: $
255 Glacier Drive ❑Neg.Dec.-$1,800 Total Paid $
Martinez,CA 94553 ❑DeMiniunis Findings-$0
Attn:N2ozi Aiawara ®County Clerk-$50 Receipt#:
Environmental Section ® Community Development Dept.-$25
G:\EngSvc\ENVIRO\TransEng\San Pablo Ave.-Parker Ave.Sidewalk\CEQA\NOE.doc Updated July 21,2006
" Railroad .
y e4s i° m��aa'L J\ Ea es
`. (mb
z � Avoee �
O iooU °aQ
,� b � � � Crestricige
' O
� � � � ��► • 9$� a S RO�k carbo
O� �, •� ,{ ao v��i h� r
. O
O
�, '� Vis® �ml��• S � sem,,,...
u
red
MP ranan Pinole
o jog 0 S�' ,d„tea a
Val ejo
onom
5
,ya
42
��
Q
C
O
o
1MF 9 �.
Clmn s O o
viz
rMIL
5 s�aei�
CD Q m
N
°
D
z
D
°U CA
v V)
`D
O — z � z
G
mr
C
0
z
z ;U
C 0. D D
OD m
�
r- z (vC7v)
D D
° :�E °
v Q
7 �.
D o z CD 1�
r- Uj z O -'z -u n
° c
�- r--
� m D Q7
OO p
O L -+
C—
m
m z O
C) O o D
z n
o M C�
C) M
D
z
D
-o
Y
r
o ry
y �y
•
i
' r♦ '� to ..�" �y� �♦
1f Y•_ ♦ � J��
v ' C;.-'�� �S�i 4y1. #'�, ,0• t '�� � � ate. �;, .t s• •c.c=''�`'.�,� .'4�
a
r,
• ilf
r
♦
AGJ
inL
IP
tr8 _ .
d
4-0
I '„7
y �
>rr.
II
.-► . ;_� +fir,_
t