TO: BOARD OF SUPERVISORS, AS GOVERNING t�-- tr--=� o n, r
BOARD OF THE FLOOD CONTROL& WATER :
-: . —
CONSERVATION DISTRICT C o s t a
o' •�;iilmae ;z
FROM: MAURICE M. SHIU, CHIEF ENGINEER - County
sra-cooti`t't
DATE: August 14, 2007
SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007,
regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control
Zone 3B Funds) (Districts lI& IV)Project No. 7520-6B8345
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDED ACTION:
DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on
April 10,2007,pursuant to Public Contract Code Sections 22035 and 22050,to implement the Lower Walnut Creek
Interim Protection Measures project, Pacheco area.
FISCAL IMPACT:
The total estimated contract cost is $8,500,000, funded by Flood Control Zone 3B Funds.
CONTINUED ON ATTACHMENT: El SIGNA
RECOMMENDATION OF COUNTY ADMINISTRATOR 114150MMENDATIO ' F BOARD COi E
APPROVE OTHER
SIGNATURE(S): ��(/"ge C -,
ACTION OF BO ON i APPROVED AS RECOMMENDED y XR
VOTE OF SUPERVISORS: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT
XCOPY OF AN ACTION TAKEN AND ENTERED ON
UNANIMOUS(ABSENT /2,f/)A MINUTES OF THE BOARD OF SUPERVISORS ON THE
AYES: NOES: DATE SHOWN.
ABSENT: ABSTAIN:
Contact: Greg Connaughton(925)313 2270
GC:PD:cw
G:\F1dCtl\Board Orders 2005 Onward\2007 BO\L.ower Walnut Creek Emergency BO ATTESTED G !J
8-14-07.doe JOHN C EN,CLERK OF THE BOARD OF
SUPER ORS
cc: County Administrator
Auditor—Controller
Public Works:
Maurice M.Shiu,Chief Engineer BY: EPUTY
R.Mitch Avalon,Deputy Chief Engineer
Mike Carlson,Construction
Greg Connaughton,Flood Control
Paul Dctjens,Flood Control
SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007,
regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood
Control Zone 3B Funds) (Districts H&IV)Project No. 7520-6B8345
DATE: August 14, 2007
PAGE: 2 of 2
REASONS FOR RECOMMENDATIONS AND BACKGROUND:
A. On April 10, 2007, the Board of Supervisors declared an emergency and authorized the Chief Engineer to
proceed in the most expeditious manner to repair or replace the Lower Walnut Creek flood control facility as
directed by the US Army Corps of Engineers.
B. Repair status:
The Contra Costa County Flood Control and Water Conservation District (District) has prepared the Lower
Walnut Creek Corrective Action Plan and presented this to the US Army Corps of Engineers for consideration
on June 11, 2007. A status report, including this Corrective Action Plan,was presented to the Transportation,
Water and Infrastructure Committee on June 25, 2007. Project plans are being prepared and the District has
begun initial outreach efforts to contractors to generate interest in the project among potential bidders. The
current schedule calls for starting the work in mid-August 2007 and completing the needed interim protection
measures in early November 2007.
CONSEQUENCES OF NEGATIVE ACTION:
Nonconcurrence.of the above recommendation will significantly delay implementation of the needed capacity
improvements in Lower Walnut Creek flood control facility and prevent the District from meeting the correction
schedule required by the US Army Corps of Engineers.