HomeMy WebLinkAboutMINUTES - 04102007 - C.4 I�
TO: BOARD,,OF SUPERVISORS �`E s L °� Contra
FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR f Costa
o, ,aa
DATE: April 10, 2007 ___ t '`�~~ County
'4 LOUR
SUBJECT: DETERMINE that the Knightsen Pedestrain Project is a California Environmental Quality Act
Class 1 Categorical Exemption; APPROVE the project and AUTHORIZE the Public Works
Director, or designee, to advertise the project, Knightsen area. (Road Funds) (District III) [CDD-
CP# 06-122] Project No. 0676-6P4094/0662-6U4241
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDED ACTION:
DETERMINE that the Knightsen Pedestrain project is a California Environmental Quality Act (CEQA) Class 1
Categorical Exemption, and
DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk, and
AUTHORIZE the Public Works Director to arrange for payment of a $25 fee to Community Development for
processing, and a$50 fee to the County Clerk for filing the Notice of Exemption, and
APPROVE the project, and AUTHORIZE the Public Works Director, or designee, to advertise the project.
Continued on Attachment: ® SIGNATURE:
[� COMMENDATION OF COUNTY ADMINISTRATOR ❑ RECOMMENDATION OF BOARD COMMITTEE
APPROVE ❑ OTHER
SIGNATURE(S):
ACTION OF 110�4 ON
APPROVED AS WCOMMENbED OTHER ❑
VO�E OF SUPERVISORS
V UNANIMOUS(ABSENT I hereby certify that this is a true and correct copy of an action
AYES NOES: taken and entered on the minutes of the Board of Supervisors on
ABSENT: ABSTAIN: the date shown.
o y
KB:sjji�
G:\EngSvc\ENVIRO\BO\2007\(04-10-07)CEQA-Knightsen Ped.Project.doc ATTESTED:
Orig.Div:Public Works(Environmental Section) JOHN CULLEN,CLE K OF THE BOARD OF SUPERVISORS AND COUNTY
Contact: Kimani Birden,(313-2190) ADMINISTRATOR
cc: Administrator—Attn.E.Kuevor
Auditor-Controller
J.Ring,Community Development
J.Dowling,Construction By Deputy
K.Schuh,Transportation
T.Torres,Environmental
�I
SUBJECT: DETERMINE that the Knightsen Pedestrian Project is a California Environmental Quality Act
Class 1 Categorical Exemption; APPROVE the project and AUTHORIZE the Public Works
Director, or designee, to advertise the project, Knightsen area. (Road Funds) (District III) [CDD-
CP#06-122] Project No. 0676-6P4094/0662-6U4241
DATE: April 10, 2007
PAGE: 2 of 2
FISCAL IMPACT:
There is no impact to the County General Fund. This Grant Application project is funded by Road Funds.
REASONS FOR RECOMMENDATIONS AND BACKGROUND:
The purpose of the project is to provide a pedestrian route to school for children attending Knightsen Elementary and
to provide pedestrian access to destinations in downtown Knightsen. The proposed project consists of replacing
210 feet of deteriorating irregular concret sidewalk between 3055 Knightsen Avenue and A Street. A strip of
approximately 6 foot,wide pavement adjacent to the sidewalk will be removed and repaved to conform to the
planned installation of curbs and gutters. The northwest corner of Delta Road and Knightsen Avenue will have an
asphalt concrete ramp replaced with a concrete curb ramp. Construction will consist of excavation and installation
of a drainage inlet, pipe, manhole, placement of aggregate base, construction of formwork and placement of
concrete.
The project limits on Knightsen Avenue between Knightsen Avenue and Knightsen Elementary on Delta Road
involves replacing a 750 foot long dirt and gravel soft shoulder with an asphalt pedestrian path. The southwest
corner of the Knightsen Avenue-Delta Road intersection will have an AC pad constructed to facilitate pedestrian
crossing of Delta Road, and to support pedestrian use of the path. Detectable warning surfaces will be installed at
key crossing points. The path traverses a Burlington Northern Sante Fe Railway railroad crossing on Delta Road.
This crossing will need to be modified to accommodate the pedestrian path. The pedestrian path may extend outside
of the County right of way and an easement may need to be obtained from the Burlington Northern Sante Fe
Railway. The installation of pedestrian crossing gates and warning devices will also be necessary. Construction will
involve excavation to obtain the correct pavement depth,placement and compaction of aggregate base and asphalt.
Both improvements will be constructed consistent with Americans with Disabilities Act (ADA) standards.
The project is located in East County and will not result in the removal of any scenic resource.
CONSEQUENCES OF NEGATIVE ACTION:
Delay in;approving the project will result in a delay of design and construction and may jeopardize funding.
Contra PUBLIC WORKS DEPARTMENT
'Costa INITIAL STUDY OF
County ENVIRONMENTAL SIGNIFICANCE
PROJECT # 0676-6P4094 & 0662-6U4241
C P# 06-122
PROJECT NAME: Knightsen Pedestrian Project
PREPARED BY: Kimani Birden DATE: February 26, 2007
APPROVED BY: r DATE:
RECOMMENDATIO
® Categorical Exemption (Class 1) ❑ Negative Declaration
❑ Environmental Impact Report Required ❑ Conditional Negative Declaration
The project will not have a significant effect on the environment. The recommendation is
based on the following: The project involves the repair, maintenance, and minor alteration of
existing public structures and facilities involving no expansion of use beyond previously existing
conditions.
What changes to the project would mitigate the identified impacts: N/A
USGS Quad Sheet: Brentwood Base Map Sheet #:J26, J27 Parcel #: N/A
GENERAL CONSIDERATIONS:
1. Location: The project is located in unincorporated East Contra Costa County; along the south side of Delta
Road from Knigthsen Avenue to Knightsen Elementary and on the East side of Knightsen Avenue from 3055
Knightsen Avenue to A Street (Figs. 1-3).
2. Project Description: The purpose of this project is to provide a pedestrian route to school for children
attending Knightsen Elementary and to provide pedestrian access to destinations in Downtown Knightsen. This
area of Knightsen has non-standard sidewalks that are in disrepair.
The project section on Knightsen Avenue between 3055 Knightsen Avenue and A Street will replace 210 feet of
deteriorating irregular concrete sidewalk.A strip of approximately 6 foot wide pavement adjacent to the sidewalk will
be removed and repaved to conform to standard elevation with the planned installation of curbs and gutters. The
northwest corner of Delta Road and Knightsen Avenue will have an asphalt concrete ramp replaced with a concrete
curb ramp. Construction will consist of excavation and installation of a drainage inlet, pipe, manhole, placement of
aggregate base, construction of formwork and placement of concrete.
The project section between Knigthsen Avenue and Knightsen Elementary on Delta Road will replace a 750
foot long dirt and gravel soft shoulder with an asphalt pedestrian path. The southwest corner of the Knigthsen
Avenue-Delta Road intersection will have an AC pad constructed to facilitate pedestrian crossing of Delta Road,
and to support pedestrian use of the path. Detectable warning surfaces will be installed at key crossing points.
The path traverses a Burlington Northern Santa Fe Railway railroad crossing on Delta Road heading toward
Knightsen Elementary that will need to be modified to accommodate the pedestrian path. The pedestrian path
may extend outside of the county Right of Way and an easement may need to be obtained from the Burlington
Northern Santa Fe Railway. The installation of pedestrian crossing gates and warning devices will also be
necessary. The construction will involve excavation to obtain the correct pavement depth, placement and
compaction of aggregate base and asphalt.
Both sections will be constructed consistent with Americans with Disabilities (ADA) standards.
tt:KB 1
G:\EngSvc\ENVIRO\TransEng\Knightsen Pedestrian\CEQA\Initial Study.doc
Form Updated: July 21,2006
Last printed 2/26/2007 5:20:00 PM
Knightsen Pedestrian Project 0676-6P4094 & 0662-6U4241/ CP# 06-122
Initial Study
Page 2
Although the majority of the construction activity will occur on existing roadway shoulders, it may be necessary to
close one lane of traffic on Knightsen Avenue during construction to accommodate construction machinery and
activity. Since Knightsen Avenue and Delta Avenue have two lanes, at least one lane of traffic will be open at all
times during construction activities to ensure adequate access is retained.The construction at the railroad crossing
will close Delta Road for 3 to 5 days during the summer school break. To assist vehicle and pedestrian traffic,
flaggers and clear road signs will be used to direct traffic and reduce traffic delays. Emergency vehicle access will
be allowed at all times. All pedestrian traffic on Delta Road will be directed to the north side of the roadway during
construction.
In order to minimize damage to any near by trees, any roots exposed during excavation will be cut cleanly and tree
branches will be trimmed. Real property transactions and utility relocations may be necessary in support of this
project.
3. Does it appear that any feature of the project will generate significant public concern?
❑ yes ® no ❑ maybe
4. Will the project require approval or permits by other than a County agency?
❑ yes ® no
5. Is the project within the Sphere of Influence of any city? NO
ft:KB 2
G:\EngSvc\ENVIRO\TransEng\Knightsen Pedestrian\CEQA\Initial Study.doc
Form Updated: July 21,2006
Last printed 2/26/2007 4:48:00 PM
75
.5�
Lli
rill"
n
RJL,
ry
L = �-U
�,
CL
ui
LLJ fIr
LO
Lie
0
rL
ja-
j AeManlao Cil
111 0Aernanua
■
+ .J
® Jo;sed Drivew Y M
LLLi
V
s!Nyo1OH
�e�anua
.O llen0
1L C0
PE POISWL40 ca �
CL 3 w
T
acid PeO2i aMb 1eld uaP3 D 3 > sulel Uqpjj
CL
`_--------- - - Q
o v m saaov uaaJE)
ca ' bulwwn0
m
uco el�ed W
w ZPU
Z zn10 eyun
uasiy61u>l 3 xauu lin 3 Aennanua Aennanua
> > ai o
❑ o E
ve`Nay LL
1
o ennanuQff
3 ° co
o tou.
-C �a AeMaAIJ 4oead- L >,
ca
E,
> _ w Q3
> in w m >
o ca
> O E °' m
E co >
o c ajowsuo o
c
ca CD
EN
eAozo-1 r
Zi nr = Y O o
alAoa m
_ auBIC] V
a o a joie
a0 eo, a J _ sw
openle lue
V .1'
l I l �a ';
colv and{O �feM o m �Q ` O
a ow
O W o wiO
o >,
o tp
Mo eelc '� _E ca j c r .�
> co (D m
cc 2 Z c
3 m
`° ti wain) � � y 0
a e �f
m
anaeH or o Av
0[ivev ay
o m o O� m a = 00
00 0ll a�M elw6 in �(ennanua
Nt )
c 3 c
ON .�
ualleM Q rive`Nay to cu
ea al}ii� uosjapuv O C7
a
n —1 (D .! r
rA
C n
z CA
x
Xley. "d
`
•wii I N
aw
N
>�� r � .� �I �y ria ��=f •�
q-
aY
,�
�`
�`
�i*R`g�'c, �i.:.. � �� i. I {k� �� '��r P r >'�Pt��"{ s "r M�del 6•,� ¢I" .,
NIS Nary _ l b 1
Vv
��"�� a��.� as � ry,"sJ�"'� � P P gym•' `� � �� �E�sa�'}�� N �*r s � >si+a* ru.3 e
QQ1MA—Pw'L nu�u
A 4yr Ow.
s m A +gad
;• fd q °
R dN^B I
-HIN57
49
aaa
m i – . . • — v..a.. m,,A r°„wi�.°..d...
AZTUAVII
{{ r 1 III
1
� t«
, v
V m 4•� �rh". �• .Y3 �. � 3
CALIFORNIA ENVIRONMENTAL QUALITY ACT
Notice of Exemption
Contra Costa County Community Development Department
651 Pine Street, 4th Floor- North Wing, McBrien Administration Building
Martinez, CA 94553-0095.
Telephone: (925) 313-2190 Contact Person: Kimani Birden- Public Works Dept.
Project Title, Description, Common Name (if any) and Location: Knightsen Pedestrian Project
Project No. 0676-6P4094&0662-6U4241 County File CP# 06-122
Project Description: The purpose of this project is to provide a pedestrian route to school for children attending
Knightsen Elementary and to provide pedestrian access to destinations in Downtown Knightsen.This area of Knightsen
has non-standard sidewalks that are in disrepair.
The project section between 3055 Knightsen Avenue and A Street will replace 210 feet of deteriorating irregular concrete
sidewalk.A strip of approximately 6 foot wide pavement adjacent to the sidewalk will be removed and repaved to conform
to standard elevation with the planned installation of curbs and gutters.The northwest corner of Delta Road and Knightsen
Avenue will have an asphalt concrete ramp replaced with a concrete curb ramp.Construction will consist of excavation and
installation of a drainage inlet, pipe, manhole, placement of aggregate base, construction of formwork and placement of
concrete.
The project section on Knightsen Avenue between Knigthsen Avenue and Knightsen Elementary on Delta Road
will replace a 750 foot long dirt and gravel soft shoulder with an asphalt pedestrian path. The southwest corner of the
Knigthsen Avenue-Delta Road intersection will have an AC pad constructed to facilitate pedestrian crossing of Delta
Road, and to support pedestrian use of the path. Detectable warning surfaces will be installed at key crossing points.
The path traverses a Burlington Northern Santa Fe Railway railroad crossing on Delta Road heading toward Knightsen
Elementary that will need to be modified to accommodate the pedestrian path.The pedestrian path may extend outside
of the county Right of Way and an easement may need to be obtained from the Burlington Northern Santa Fe Railway.
The installation of pedestrian crossing gates and warning devices will also be necessary.The construction will involve
excavation to obtain the correct pavement depth, placement and compaction of aggregate base and asphalt. Both
sections will be constructed consistent with Americans with Disabilities (ADA) standards.
Although the majority of the construction activity will occur on existing roadway shoulders, it may be necessary to close
one lane of traffic on Knightsen Avenue during construction to accommodate construction machinery and activity. Since
Knightsen Avenue and Delta Avenue have two lanes, at least one lane of traffic will be open at all times during
construction activities to ensure adequate access is retained.The construction at the railroad crossing will close Delta
Road for 3 to 5 days during the summer school break. To assist vehicle and pedestrian traffic, flaggers and clear
road signs will be used to direct traffic and reduce traffic delays. Emergency vehicle access will be allowed at all
times. All pedestrian traffic on Delta Road will be directed to the north side of the roadway during construction.
In order to minimize damage to any near by trees, any roots exposed during excavation will be cut cleanly and tree
branches will be trimmed. Real property transactions and utility relocations may be necessary in support of this project.
At least one lane of traffic will be open at all times during construction activities to ensure adequate access is retained.
Project Location: The project is located in unincorporated East Contra Costa County.
This project is exempt from CEQA as a:
❑ Ministerial Project (Sec. 15268) X Categorical Exemption, Class 1
❑ Declared Emergency (Sec. 15269(a)) ❑ Other Statutory Exemption, Section
❑ Emergency Project(Sec. 15269(b)or(c)) ❑ General Rule of Applicability[Section 1506.1 (b) (3))
For the following reason(s): The project involves the repair, maintenance, and minor alteration of existing public
structures and facilities involving no expansion of use beyond previously existing conditions.
Date: By:
Community Development Department Representative
AFFIDAVIT OF FILING AND POSTING
I declare that on I received and posted this notice as required by
California Public Resources Code Section 21152(c). Said notice will remain posted for 30 days from the
filing date.
Signature Title
Applicant: Department of Fish and Game Fees Due
Public Works Department ❑ EIR-$2,500 Total Due: $
255 Glacier Drive ❑ Neg. Dec. -$1,800 Total Paid $
Martinez, CA 94553 ❑ DeMinimis Findings-$0
Attn:Kimani Birden ® County Clerk -$50 Receipt#:
Environmental Section ® Community Development Dept. -$25
G:\EngSvc\ENVIRO\TransEng\Knightsen Pedestrian\CEQA\NOE-form.doc Updated July 21,2006
CALIFORNIA ENVIRONMENTAL QUALITY ACT
Notice of Exemption
Contra Costa County Community Development Department
651 Pine Street, 4th Floor- North Wing, McBrien Administration Building
Martinez, CA 94553-0095
Telephone: (925) 313-2190 Contact Person: Kimani Birden- Public Works Dept.
Project Title, Description, Common Name (if any) and Location: Knightsen Pedestrian Project
Project No. 0676-6P4094&0662-6U4241 County File CP# 06-122
Project Description: The purpose of this project is to provide a pedestrian route to school for children attending
Knightsen Elementary and to provide pedestrian access to destinations in Downtown Knightsen.This area of Knightsen
has non-standard sidewalks that are in disrepair.
The project section between 3055 Knightsen Avenue and A Street will replace 210 feet of deteriorating irregular concrete
sidewalk.A strip of approximately 6 foot wide pavement adjacent to the sidewalk will be removed and repaved to conform
to standard elevation with the planned installation of curbs and gutters.The northwest corner of Delta Road and Knightsen
Avenue will have an asphalt concrete ramp replaced with a concrete curb ramp.Construction will consist of excavation and
installation of a drainage inlet, pipe, manhole, placement of aggregate base, construction of formwork and placement of
concrete.
The project section on Knightsen Avenue between Knigthsen Avenue and Knightsen Elementary on Delta Road
will replace a 750 foot long dirt and gravel soft shoulder with an asphalt pedestrian path. The southwest corner of the
Knigthsen Avenue-Delta Road intersection will have an AC pad constructed to facilitate pedestrian crossing of Delta
Road, and to support pedestrian use of the path. Detectable warning surfaces will be installed at key crossing points.
The path traverses a Burlington Northern Santa Fe Railway railroad crossing on Delta Road heading toward Knightsen
Elementary that will need to be modified to accommodate the pedestrian path.The pedestrian path may extend outside
of the county Right of Way and an easement may need to be obtained from the Burlington Northern Santa Fe Railway.
The installation of pedestrian crossing gates and warning devices will also be necessary. The construction will involve
excavation to obtain the correct pavement depth, placement and compaction of aggregate base and asphalt. Both
sections will be constructed consistent with Americans with Disabilities (ADA) standards.
Although the majority of the construction activity will occur on existing roadway shoulders, it may be necessary to close
one lane of traffic on Knightsen Avenue during construction to accommodate construction machinery and activity.Since
Knightsen Avenue and Delta Avenue have two lanes, at least one lane of traffic will be open at all times during
construction activities to ensure adequate access is retained.The construction at the railroad crossing will close Delta
Road for 3 to 5 days during the summer school break. To assist vehicle and pedestrian traffic, flaggers and clear
road signs will be used to direct traffic and reduce traffic delays. Emergency vehicle access will be allowed at all
times. All pedestrian traffic on Delta Road will be directed to the north side of the roadway during construction.
In order to minimize damage to any near by trees, any roots exposed during excavation will be cut cleanly and tree
branches will be trimmed. Real property transactions and utility relocations may be necessary in support of this project.
At least one lane of traffic will be open at all times during construction activities to ensure adequate access is retained.
Project Location: The project is located in unincorporated East Contra Costa County.
This project is exempt from CEQA as a:
❑ Ministerial Project (Sec. 15268) X Categorical Exemption, Class I
❑ Declared Emergency (Sec. 15269(a)) ❑ Other Statutory Exemption, Section
❑ Emergency Project(Sec. 15269(b)or(c)) ❑ General Rule of Applicability iSeetion 15061 (b) (.3)1
For the following reason(s): The project involves the repair, maintenance, and minor alteration of existing public
structures and facilities involving no expansion of use beyond previously existing conditions.
Date: By:
Community Development Department Representative
AFFIDAVIT OF FILING AND POSTING
I declare that on I received and posted this notice as required by
California Public Resources Code Section 21152(c). Said notice will remain posted for 30 days from the
filing date.
Signature Title
Applicant: Department of Fish and Game Fees Due
Public Works Department ❑ EIR-$2,500 Total Due: $
255 Glacier Drive ❑ Neg. Dec.-$1,800 Total Paid $
Martinez, CA 94553 ❑ DeMinimis Findings-$0
Attn:Kimani Birden
® County Clerk-$50 Receipt#:
Environmental Section ® Community Development Dept. -$25
G:\EngSvc\ENVIRO\TransEng\Knightsen Pedestrian\CEQA\NOE-form.doc Updated July 21,2006