TO: BOARD OF SUPERVISORS
FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR0.
Costa
.�
DATE: MARCH 6, 2007 County
----
SUBJECT: APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a grant agreement
with the Association of Bay Area Governments (ABAG) in the amount of$50,000, to conduct
planning studies for the Carquinez Scenic Drive Path project, Port Costa and Martinez areas. Project
No.:0676-6P4009 (50% ABAG Grant and 50% Road Funds) (District II).
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDED ACTION:
APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a grant agreement with the
Association of Bay Area Governments (ABAG) in the amount of$50,000, effective through June 30, 2010, to
conduct planning studies for the Carquinez Scenic Drive Path project, Port Costa and Martinez areas. Project
No.:0676-6P4009 (50% ABAG Grant and 50% Road Funds) (District II).
FISCAL IMPACT:
The estimated total cost of the Carquinez Scenic Drive Planning Studies project is $100,000. The ABAG grant
will provide $50,000, with the remaining $50,000 coming from County road funds. There will be no impact to
the General Fund.
CONTINUED ON ATTACHMENT: ❑x SIGNATURE:
_11E:COWNIFNDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF ARD COMMITTEE
f ,APPROVE: OTHER
r
SIGNATURE(S):
ACTION OF BOA D N �Q ' Q APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS: I HEREBY CERTIFY THAT TI IIS IS A TRUE AND CORRECT
l COPY OF AN ACTION TAKEN AND ENTERED ON
UNANIMOUS(ABSENT ) MINUTES OF THE BOARD OF SUPERVISORS ON THE
AYES: NOES: DATE SHOWN.
ABSENT: ABSTAIN:
Contact: John Pulliam(313-2165)
:',
tr
GT:`, ransEng\-)007\BO=I'B\BO ABAG Grant.doc ATTESTED
JOHN CULLEN,CLERK OF TI IE BOARD OF
SUPERVISORS
cc: S.Kowalewski,Transportation Engineering
B.Fernandez,Transportation Engineering
Accounting Services
BY: QQ I DEPUTY
SUBJECT: APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a grant
agreement with the Association of Bay Area Governments (ABAG) in the amount of$50,000, to
conduct planning studies for the Carquinez Scenic Drive Path project, Port Costa and Martinez
areas. Project No.:0676-6P4009 (50% ABAG Grant and 50% Road Funds) (District II).
DATE: March 6, 2007
PAGE: 2 of 2
REASONS FOR RECOMMENDATIONS AND BACKGROUND:
In 1983 a 1.7-mile long segment of the Carquinez Scenic Drive between Port Costa and Martinez was closed due to
pavement deterioration and landslide activity that occurred primarily during the winter of 1981-1982. This closed
segment is currently gated and is impassable to vehicular traffic. Very little maintenance to this road segment has
been carried out since 1983. Despite its generally poor condition,the roadway is a developed facility that even in its
current condition presents an unmatched opportunity to develop a superior multi-use trail facility in a unique setting.
This planning grant will assist with funding the two technical planning studies—a Natural Environment Study,and a
Historic Property and Archeological Survey. These two studies will assist the County with preparation of an initial
study for the purpose of CEQA and NEPA,and will place the County in a position to apply for future grants to fund
the construction of this project.
This segment of trail is also part of the San Francisco Bay Trail Project, which will provide continuous bike and
pedestrian access around the San Francisco Bay region.
CONSEQUENCES OF NEGATIVE ACTION:
If the planning grant agreement is not approved,these two technical studies will be delayed as additional funding is
sought.