HomeMy WebLinkAboutMINUTES - 07112006 - D.1 I �•
Contra
�. Costa
TO: BOARD OF SUPERVISORS
County
FROM: CARLOS BALTODANO, DIRECTOR °x-`
BUILDING INSPECTION DEPARTMENT
DATE: July 11,�2006
!i
SUBJECT: MOBILEHOME PARK & SPECIAL OCCUPANCY PARK FEES
I
SPECIFIC REQUEST(S)OR RECOMMENDATIONS)&BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
OPEN the public hearing, receive testimony, and CLOSE the hearing
ADOPT the attached 'ordinance, Ordinance No. 2006-14, which increases existing fees
and adopts new fees;; charged by the Building Inspection Department for performing
inspections, issuing permits, plan checks, application processing, and other services
related to mobilehorn`e parks, special occupancy parks, and other housing-related
programs enforced by the Building Inspection Department.
FISCAL IMPACT
No General Fund Impact
BACKGROUND/REASONS FOR RECOMMENDATIONS
The Building Inspection Department enforces regulations that govern several housing
programs administered by the California Department of Housing and Community
Development (HCD). I These programs include the mobilehome parks program, the
special occupancy parks program, the manufactured housing sales and occupational
licensing program, the factory-built housing program, and the employee-housing
program. The Buildi'�g Inspection Department enforces state regulations for these
programs in Contra Costa County.
Mobilehome parks program (H&S Code 18200-18700) and special occupancy parks
program (H&S Code 18860-18874) regulations govern the construction, use,
maintenance and occupancy of privately owned mobilehome and special occupancy
parks, as well as the i' stallation of manufactured homes and mobilehomes both in and
outside of parks. The', Building Inspection Department inspects and issues permits for
park operation. The Building Inspection Department currently in pects 37 mobilehome
parks in the unincorporated area of the County. j
CONTINUED ON ATTACHMENT: YES SIGNATURE 1/0
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
_,,�APPROV OTHER
SIGNATURE (S): i
ACTION OF BO ONAPPROVED AS RECOMMENDED _X OTHER X _
? s'As Recommended;and DIRECTED the Building Inspection Department and County Counsel.to report back to the Board by the
`end of September on circumstance in which the costs could be implemented as a pass-through to the residents.
X UNANIMOUS(ABSENT ) I -HEREBY CERTIFY THAT THIS is A
AYES: NOES: TRUE AND CORRECT COPY OF AN
ABSENT: ABSTAIN: ACTION TAKEN AND ENTERED ON THE
MINUTES OF T E BOARD OF
Contact: Carlos Baltodano(9251335-1108) SUPERVISORS OrorTHE DATE SHOWN.
ATTESTE W#
cc: Building Inspection John Cul Cyd of the Board of
Supervi rs d Cou y Administrator
I v �
DUTY
w:personal/boardorders/mobilehorriepark.special occupancy park fee
i
i
Board Order
Mobilehome Park & Special Occupancy Park Fee
July 11, 2006
Page 2
i
BACKGROUND/REASONS FOR RECOMMENDATIONS - Continued
;I
Manufactured housing sales and occupational licensing program (H&S Code 18035-
18055) regulations go,Vern the sale and lease of manufactured homes, mobilehomes,
and commercial coaches, including the licensing of manufacturers, distributors, dealers,
and salespersons.
Factory built housing program (H&S Code 19960-19997) regulations establish
construction standards for factory-built homes and factory-built building components
manufactured for sale or use. The Building Inspection Department conducts
inspections and issues approvals to complying homes and components.
Employee housing P�pro ram (H&S Code 17000-18062.5) regulations govern the
maintenance, use, and occupancy of privately owned and operated employee-housing
facilities providing housing for five or more employees to assure their health, safety, and
general welfare. The Building Inspection Department inspects and issues permits for
facility operation.
i
The Health and Safety Code authorizes HCD to establish fees based on the actual
costs of administering; and enforcing the above-referenced programs. The Building
Inspection Department is authorized to charge the fees established by HCD. Fee
amounts are establish;ed in various sections of Title 25 of the California Code of
Regulations.
I
The fees currently charged by the Building Inspection Department were last amended in
the late 1980s. In 2005, HCD completed studies establishing that the fees established
in the 1980s were not longer recovering the actual costs of performing the services
related to the above programs. After two public comment periods, HCD established
new fees, which becanj a effective January 1, 2006.
Adoption of the fees!, in the attached ordinance will allow the Building Inspection
Department to recover,a greater amount of its actual costs of performing services related
to the above programs. With adoption of the fee schedule by the Board of Supervisors
on July 11, 2006, the n 11 ew fees will go into effect on Monday, September 11, 2006.
d
i
i
i
IL.
ORDINANCE NO. 2006-14
(uncodified)
(Mobilehome Parks, Special Occupancy Parks,Manufactured Housing Sales and Occupational
Licensing, Factory Built Housing, and Employee Housing Program Regulatory Fees)
The Contra Costa County Board of Supervisors ordains as follows:
SECTION I. Authority., This ordinance adopts the fees specified in the following sections of Title
25, Code of California Regulations: 1004.5, 1016, 1017, 1020.1', 1020.4, 1020.7, 1020.9, 102,
2004.5, 2016,2017,2020.4, 2020.7, 2020.9, 3060, 4044, and 4884.
SECTION II. Notice and Hearing. This ordinance was adopted pursuant to the procedures set
forth in Government Code sections 66016, 66017, and 66018. All required notices have been
properly given and public'hearings held.
SECTION III. Fee Adoption. On and after the effective date of this ordinance, the fees set forth in
Exhibit A,which is attached and incorporated into this ordinance, are adopted and shall be charged and
collected for the services enumerated in Exhibit A. The Building Inspection.Department fee schedule
shall be revised to be consistent with this ordinance.
SECTION IV. Severability. If any fee or provision of this ordinance is held invalid or unenforceable
by a court of competent jurisdiction, that holding shall not affect the validity or enforceability of the
remaining fees or provisions, and the Board declares that it would have adopted each part of this
ordinance irrespective of the validity of any other part.
SECTION V. Supersede. This ordinance supersedes all ordinances, resolutions, and other actions
of the Board of Supervisors establishing fees for the services specified in this ordinance.
ORDINANCE NO. 2006-14
1
SECTION VI. Effective Date. This ordinance becomes effective 60 days after passage. Within 15
days of passage,this ordinance shall be published once with the names of the supervisors voting for and
against it in the Contra Costa Times, a newspaper published in this County.
PASSED ON &/by the following vote:.
AYES:
NOES:
ABSENT: yter '
ABSTAIN:
ATTEST: JOHN CULLEN, _
Clerk of the Board of Supervisors Bo#1Chair
and County Administrator
By: [SEAL]
uty
TLG:
HA20061Building Inspectionlmobile home fee ord2.wpd
ORDINANCE NO. 2006-14
2
Chapter 2.Mobilehorne Parks and Installations
Article 1.Administration and Enforcement
Amend Section 1016.
§1016.Approval of Alternates and Equivalents.
When the department isIthe enforcement agency, a request for approval of an alternate or equivalent
means of meeting the requirements of this chapter shall be submitted by the applicant to the
department's Northern or'Southern area office. When a city, county,orcity and county has assumed
enforcement responsibility for this chapter,the applicant shall submit the request for this approval to the
local enforcement agencyl The local enforcement agency shall forward the request to the department's
Administrative Office of the! Division of Code's and Standards, along with their written recommendation
and rationale for approvalilor denial.The request shall be submitted on forms,as defined in Section 1002
of this chapter, provided by the department.The form shall be accompanied by one (1) set of
I
substantiating plans and/or information together with the alternate approval fee of two hundred three
,I
dollars($203), payable to;the department.
NOTE:Authority cited:Section 18300,Health and Safety Code. Reference:Section 18305 and 18502.5, Health and Safety
Code.
Final Regulations Page 4
Title 25,Chapters 1,2,2:*2, 3, 4 and 5.5
EH, MP, SOP, FBH, MH and OL
Chapter 2. Mobilehome Parks and Installations
Article 1.Administration and Enforcement
Amend Section 1017.
§1017.Technical Service Fee.
(a) Fees for technical services provided by the enforcement agency shall be:
(1) One hundred ninety-six dollars ($196) providing the technical service does not exceed one hour.
When the related technical service exceeds one hour,the following fees shall apply:
(A).Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty (30)minutes, or fractional part thereof:forty-one dollars ($41).
NOTE:Authority cited: Section 18300,and 18502.5, Health and Safety Code. Reference: Sections 18502.5,and 18503,
Health and Safety Code.
Final Regulations Page 5
Title 25, Chapters 1, 2,2.2, 3,4 and 5.5
EH, MP,SOP, FBH, MH and OL
Chapter 2.Mobilehome Parks and Installations
Article 1.Administration and Enforcement
Amend Section 1020.1:
§1020.1. Fees for MH"unit Installation,and Standard Plan Approval Foundation System
Permits. f
(a)The following fees shall apply:
(1) Installation of an MH-unit, or multi-unit manufactured housing containing not more than two(2)
dwelling units, or support system alteration permit fee. One hundred ninety-six dollars ($196) provided
the related inspection does not exceed one hour.When the related inspection exceeds one hour,the
following fees shall apply:
(A) Second and subsequent whole hours:eighty-two dollars($82).
(B) Each 30 minutes, or fractional part thereof: forty-one dollars ($41).
(2) Foundation system permit fee: refer to valuation tables in Section 1020.7of this article.
(A) Plan check fees shall not be required for a foundation system for which a standard plan
approval has been obtained from the department.
(3) Reinspection FeeI One hundred seventy-eight dollars ($178) provided the related reinspection
does not exceed one hour. When the related reinspection exceeds one hour,the following fees shall
apply:
(A) Second and subsequent whole hours:eighty-two dollars($82).
(B) Each thirty minutes (30), or fractional part thereof:forty-one dollars ($41).
NOTE:Authority cited: Sections 18300,18502.5,18551 and 18613,.Health and Safety Code, Reference: Sections 18500,
18501,18502,18503,18551 and 18613,Health and Safety Code.
Final Regulations Page 6
Title 25, Chapters 1, 2, 2l2, 3,4 and 5.5
EH, MP,SOP, FBH, MH and OL
i
Chapter 2.Mobilehome Parks and Installations
Article'1. Administration and Enforcement
Amend Section 1020.4.
§1020.4. Fees for Accessory Buildings or Structures,and Building Component Permits with a
Standard Plan Approval.
(a) The following permit fees shall apply for accessory buildings and structures,and building
components that have a standard plan approval:
(1) Inspection fee: One hundred ninety-six dollars ($196) provided the related inspection does not
exceed one hour. When the related inspection exceeds one hour,the following.fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty minutes (30), or fractional part thereof:forty-one dollars ($41).
(2) Reinspection fee: One hundred seventy-eight dollars($178) provided the related reinspection
does not exceed one hour. When the related reinspection exceeds one hour,the following fees shall
apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty minutes (30), or fractional part thereof:forty-one dollars ($41).
(b) Fees for accessory buildings and structures, and building components that do not have the
department's standard plan approval issued in accordance with Section 1020.9 of this article, shall be
determined using the valuation table contained in Section 1020.7 of this article.
(c) Electrical, mechanical, and plumbing permit fees for installations in accessory buildings or
structures or building components,shall not exceed those contained in this chapter.
(d) Plan check fees shall not be required for accessory buildings or structures for which a standard plan
approval has been obtained from the department.
NOTE:Authority cited: Sections 18300, 18502.5,and 18552, Health and Safety Code. Reference: Sections 18300,
18500,18502,18502.5,18503 and 18552, Health and Safety Code.
Final Regulations Page 7
Title 25, Chapters 1, 2, 2.2,3,4 and 5.5'
EH, MP,SOP, FBH, MH and OL
Chapter 2. Mobilehome Parks and Installations
Article 1. Administration and Enforcement
Amend Section 1020.7
§ 1020.7. Permit Fees I I for Park Construction or Alteration.
(a) Any person submittilIg an application for a permit to construct with plans not having a department
standard plan approval, shallpay ay the following fees,as applicable:
I
(1) Permit Fee, For the purpose of determining fees,the enforcement agency may establish the
permit fee in accordanc el' with subsection (1)or(g)of this section as appropriate. However, the
minimum permit fee shall be one hundred ninety-six dollars ($196)provided the initial related
inspection associated with this permit does not exceed one hour. When the related inspection exceeds
one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty (30)1,1minutes, or fractional part thereof:forty-one dollars ($41).
(2) Plan Check Fee. One-half(1/2) of the combined total of construction, mechanical, plumbing, and
electrical permit fees. However, the minimum fee shall be ten dollars ($10).
(b) Reinspection Fee. One hundred seventy-eight dollars ($178) provided the related inspection does
not exceed one hour, When the related reinspection exceeds one hour,the following fees shall apply:
(1.) Second and subs ell quent whole hours:eighty-two dollars($82).
(2) Each thirty(30) minutes, or fractional part thereof:forty-one dollars ($41),
(c) When any person fil 11 es applications simultaneously to construct two(2) or more permanent
buildings, or accessory bu"'ildings or structure's which are identical and are within the same park, only one
plan check fee shall be required.
(d) Electrical, mechanical, and plumbing permit fees shall not exceed those contained in this chapter.
(e) When plans and specifications fail to comply with the requirements of this chapter,the enforcement
agency shall notify the applicant cant in writing, stating in what respects the plans do not comply. The
applicant shall correct the plans and/or specifications and resubmit them to the enforcement agency.The
following fees are required for each resubmission of plans or specifications subsequent to the initial plan
check:
(1) Plan Check Fee:iTwo hundred three dollars ($203) provided the related plan check does not
exceed one hour. When the related plan check exceeds one hour,the following shall apply:
(A) Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30) minutes, or fractional part thereof:forty-six dollars ($46).
(f) Fees for construction'n or alteration of facilities and installations on lots and within parks shall be the
sum of the following categories comprising the proposed work subject to the minimum amounts specified
in subsection(a)(1): 1!
(1) For each lot.. ...................................................................................................$5.75
(2) Electrical Permit Fees.
Each park electrical service...........................................................................................14.00
Each unit substation or secondary distribution transformer... .___ ......... .............
Each alteration or replacement of a service or a transformer............................................10.50
Each park lot electrical service equipment_...... 7.00
1 ................................................................
Each alteration, repai , or replacement of a park lot electrical service equipment.................7.00
Each street light including circuit conductors and control equipment.....................................3.00
Final Regulations 1 .1 Page 8
Title 25,Chapters 1,2,2.112,3,4 and 5.5
EH, MP,SOP, FBH, MH and OL
(3) Plumbing Permit Fees.
Each park sewage drainage system_________ __•______ 14.00
Each private sewage disposal system or park water treatment installation..........................14.00
Each lot drain inlet 7.00
Each alteration or repair of drainage or vent piping....................................... 7.00
-•------....--•-----.
Each park water distribution system 7.00
• 7.00
..-•---------••---•-•......................••----......-----.
Each park lot water service outlet or outlets at the same location.......................................4.25
Each fire hydrant or riser __________________ „„ ____.______.14.25
Each individual lot water conditioning installation 4.25
Each alteration,.repair or replacement of water fixtures or equipment________________________________4.25
(4)-Gas Piping Permit Fees.
Each park gas piping system............................:...-------
.....--------------
_..........................:.... - ......_.7.00
Each installation of a liquefied petroleum or natural
gas tank of 60 gallon capacity,or more 7.00
Each gas riser outlet -----...-----... •-----------.._.............._____________________________4.25
-- --- ----- -----•--
Each alteration, repair- ,-or replacement of park's gas piping system._... _ _ •_-__ 4.25
(5) Each installation of equipment regulated by this for which no other
(g) Permit fees-for a permit to construct accessory buildings or structures without a standard plan
approval from the department, and foundation systems, permanent buildings, and/or electrical,
mechanical,and plumbing installations within or on permanent buildings, or accessory buildings or
structures shall be the sum of the following categories comprising the proposed work subject to the
minimum amounts specified in subsection (a)(1),
(1) Table A. Construction Permit Fees.
Total Valuation Fee
$2,000:6r less. •___ $45.00
$2,001 to$25, -------------------------------------------.. $45.00 for the first$2,000 plus$9.00 for each
additional thousand or fraction thereof,to and including$25,000.
$25,001 to$50,000 ----_ --____$252.00 for the first$25,000 plus$6.50 for each
. ............... ....-------
additional thousand or fraction thereof,to and including$50,000.
$50,001 to$100,000....................... ..................$414.50 for the first$50,000 plus$4.50 for each
...--•-------•......... --
additional thousand or fraction thereof,to and including$100,000.
$100,001 to$500,000 _ _ __ $639.50 for the first$100,000 plus$3.50 for each
------------- -------------
additional thousand or fraction thereof,to and including$500,000.
$500,001 to$1,000,000.____. ._•___$2,039.50 for the first$500,000 plus$3.00 for
each additional thousand or fraction thereof,to and including$1,000,000.
$1,000,001 and up._____________________ __$3,539.50 for the first$1,000,000 plus$2.00 for
each additional thousand or fraction thereof.
(2) Table B. Mechanical and Plumbing Permit Fees.
Each plumbing fixture, trap, set of fixtures on one trap, including water,
drainage piping and backflow protection therefore $3.00
Each building sewer .................
......................................................
....•-----------------................-----....--•14,00
Each private sewage disposal system________________________________•_--•...__,_•_____.____....___.___ 14.00
Each water heater and/or vent.............................................. - ...._.........:............7,00
Each gas piping system for one to five outlets ,-----------
-- ------------- -- -•- - 7.00
Each gas piping system for six or.more outlets, per outlet ________ ___ ........................1.50
Each gas regulator. ...........................••---......------------ •---- 1 50
Each water branch service outlet or outlets at the same location,
or each fixture supply............................................................................................1.00
Final Regulations Page 9
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5
EH, MP,SOP, FBH, MH and OL
Each installation of water treating equipment...........................................................7.00
Alteration or repair of water piping or water treating equipment-.......*..
7.00
1 ......................
Alteration or repair of drainage or vent piping........................ 7.00
Each lawn sprinkler system on any one meter, including backflow
.... ----------*-------
protection devices
...................................................................................................7.00
Vacuum.breakers or bac'kflow protective devices on
tanks,vats, etc., or for installation on unprotected
plumbing fixtures: one to five ...........3.00
over five, each additional 1.00
The installation or reloc 8�1 tiono'"f*e'"a'c""h"f*"o"r"c"ed'"-'a'ir...or........•---_.._........_._....-----............_....
... ....... ..................
gravity-type furnace or 6umer, including ducts and
vents attached to such 'a'ppliance, up to and including 100,000 Btu .. 14.00
The installation or relocation of each forced-air or gravity-type fum'a_c" *'or__b'u"r...er'
including ducts and vents attached to such appliance over 100,000 Btu......*"***"*"'**'21.00
The installation or relocation of each floor furnace,including vent........... .......... . ... 7.00
I . . . . .
The installation or reloc ation of each suspended heater,
recessed wall heater orIfloor-mounted unit heater.....................................................7.00
The installation, relocation or replacement of each appliance
vent installed and not included in an appliance permit__, ....... ................. ..•7.00
The repair of,alteration'j of,or addition to each heating appliance,refrigeration
unit,comfort cooling unlit, absorption unit, or each comfort heating, cooling,
absorption, or evaporative cooling system,including installation of controls 14.00
The installation or relocation of each boiler or compressor to and including three
-------
horsepower or each .
a6sorption system to and including 100,000 Btu .. 14.00
11 ......... ......... ...
The installation or relocation of each boiler or compressor over three
horsepower or each absorption sorption sy stem over 100,000 Btu 21.00
Each air handling unit,'including ducts attached thereto._......................................... 7.00
..........................................
NOTE: This fee shall not apply to an air handling unit which is a portion of a factory-assembled appliance,comfort cooling
unit,evaporative cooler or absorption unit for which a permit is required elsewhere in this chapter.
For each evaporative cooler other than portable type.. 7.00
11 ...............
For each vent fan connected to a single duct............................................. 3.00
For each vent ventilation --------*.....
n system which is not a portion of any heating
or air conditioning systelm authorized by a permit._____- .___„___,.7.00
Each installation ofequ I ipment regulated by this chapter
for which no other fee is listed.................................................................................7.00
(3) Table C. Electrical!Permit Fees.
Each wiring outlet where current is used or controlled, except services,
sdb-feeders and meter! outlets .............................................•
''-' * '-
.35
Each fixture, socket or other la'mpholding'...device evi ce----------------- ------
......................................................
Each motor of not,more than 50 h.p....................................................................... 4.25
Each motor of more than 50 h.p. 10.50
Each mercury arc lamp and equip . ... .. 1.00
I............ . . . . .............................................
Each range,water he a'ter or clothes dryer installation -------------*--------------*---*----*-----*7.00
Each space heater orlinfrared heat installation___________..............................................1.50
Final Regulations i Page 10
Title 25,Chapters 1, 2, 2.,2
3,4 and 5.5
EH, MP,SOP, FBH, MH and OL
Each stationary cooking unit,oven, or space heater________________________ ........................1.50
Each garbage disposer, dishwasher, or fixed motor-operated
appliance not exceeding 112 h.p. ............. 1.50
-•-------------------------•.---------------..........
Working light in buildings in course of construction or undergoing
repairs, or where temporary lighting is to be used.......................................................3.00
Each incandescent electric sign _________ ________ _________ _________ _________1.50
Electric signs or outline lighting, luminous gas type with: 1 to 4 transformers..............3.00
Additional transformers, each ................................................•---...............................35
Each rectifier and synchronous converter, per K.W. .3 5
...................................................
Each additional circuit for a mobilehome accessory building
or structure or other electrical equipment __ _-_ _ 1.50
...................................................... .. .. .
Each service:
600 volts or less, not over 200-amperes..................................................................7.00
600 volts or less, over 200-amperes _____•10.00 '
Over 600 volts - -- - -- -- - ---------•- 14.00
Each installation of equipment regulated by this chapter for
which no other fee is listed _____________ __ _ _ _ ---- 7.00
NOTE: Authority cited: Sections 18300,18502.5,and 18552, Health and Safety Code. Reference: Sections 18502,
18502.5,and 18503,Health and Safety Code.
Final Regulations Page 11
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5
EH, MP, SOP, FBH, MH and OL
Chapter 2. Mobilehome Parks and Installations
Article 1.Administration and Enforcement
Amend Section 1020.9.1
§ 1020.9, Application a`nd Fee Requirements for Accessory Building, Foundations System, or
Engineered Tiedown System Standard Plan Approvals.
(a)A standard plan approval is available from the department for a plan for an accessory building or
structure constructed and installed pursuant to this article and Article 9 of this chapter,for a foundation
system installed pursuant to section 18551 of the Heath and Safety Code, and Section 1333(d) of this
chapter, and for an engineered tiedown system designed pursuant to Section 1336.3 of this chapter.
(b) In order to obtain a standard plan approval,the applicant shall submit to the department the
following items:
(1)A completed application for standard plan approval on the form,as defined in Section 1002 of this
chapter, designated by the department
(2)Three (3) copies of the plans, specifications, and/or installation instructions, and two.(2) copies of
the design calculations,iwhen required,to substantiate the design. Specifications shall be shown on
the plan. Design calculations shall be submitted separately from the plan sheet.
(3)An application feej of two hundred three dollars ($203)for each plan.
(4) Plan check fee for initial,resubmission, or renewal. Two hundred three dollars($203) providing
the related plan check does not exceed one hour. Where the related plan check exceeds one hour, the
following fees shall apply:
(A) Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30)j minutes, or fractional part thereof: forty-six dollars($46).
(5)Additional plan check fees shall be due and payable prior to the issuance of a plan approval or a
revised plan approval, if more than one(1) hour is required to conduct the plan check.
(6) When plans and specifications fail to comply with the requirements of this chapter,the
enforcement agency shall notify the applicant in writing, stating in what respects the plans do not
comply, The applicant shall correct the plans and/or specifications and resubmit them to the
enforcement agency or withdraw them from consideration, forfeiting all submitted fees.
(7)An Identification label of Approval shall be provided for each accessory building or structure to be
manufactured under the standard plan approval and each accessory building or structure shall have an
approved identification jlabel of approval attached in a visible location.
(8) The actual identification label shall be submitted to the department for approval with the
application for a standard plan approval prior to issuance of the approval. The approved identification
label of approval shall:,!
(A) be not less in size than 3 inches by one and one-half(11/2) inches
(B) contain the following information as applicable;
Final Regulations
Title 25, Chapters 1,2, 2.2, 3, 4 and 5.5 Page 12
EH, MP, SUP, FSH, MH and OL
.I
ACCESSORY BUILDING OR STRUCTURE
1. Name of Manufacturer
2. Standard Plan Approval No.
3. Designed for:
_lbs:per square foot roof live load
_lbs.per square foot horizontal wind load
_Ibs.per square foot snow load
lbs.per square foot floor live load
—lbs.per square foot wind uplift load
4..Structure(may)(may not)be enclosed.
Department of Housing and Community Development
(C) be provided by the manufacturer and be permanently imprinted with the information required by
this section;
(9)The identification label of approval shall be either Type I, II, or III as specified in this section, each
capable of a ten-year life expectancy when exposed to ordinary outdoor environments. Letters and
numbers shall be bold Gothic.or similar style,varied for emphasis, as large as space permits, with the
minimum size being 5/64 inches. Wording shall be easily read and concise. Where permanent type
adhesives are used on Type I, II, or III plates, adhesives shall have a minimum thickness of.004
inches, and the plates shall be affixed to a relatively smooth surface.
(A)Type I. Rigid metal plates affixed by screws, rivets, or permanent type adhesives.
Minimum size: One and one-half(11/2) inches by three (3) inches by.020 inches thick net
dimensions (inside fastener heads).
Material: Aluminum, brass or stainless steel etched, stamped, engraved, or embossed to 0.015
inches minimum depth differential, color anodized or enamel filled.
(B)Type II. Flexible metal plates affixed by permanent adhesives, either pressure sensitive
acrylics or solvent activated resins.
Minimum Size: .005 inches by one and one-half(11/2) inches by three(3) inches.
Material: Aluminum foil etched or stamped to.001 minimum depth differential with color anodized
background.
(C)Type III. Metallized Mylar(polyester), surface bonded.
Minimum Size: .003 inches by one and one-half(11/2) inches by three (3) inches.
Material: Aluminum/vinyl surface bonded (to be used for nameplates where,variable'
information is required by embossing,which can be done with a conventional typewriter). Minimum
Size: .006 inches by one and one-half(11/2) inches by three (3)inches.
(c) Plans submitted to the department shall be on sheets of paper no smaller than eight and one-half
(81/2) inches by eleven (11) inches, and no larger than thirty (30) inches by forty-two (42) inches.
(1) Plans shall indicate the details of connections, dimensions,footings, foundations, general notes
and method of installation, necessary for the design and construction of the system.
(2) A plan shall indicate only one model or type of system.
(3) Each plan sheet shall provide a space not less than three (3) inches by three (3) inches for the
department's standard plan approval stamp and number.
Final Regulations
Title 25,Chapters 1,2, 2.2, 3, 4 and 5.5 Page 13
EH, MP, SOP, FBH, MH and OL
(4)When the design of the system requires an engineering analysis of structural parts and methods
of construction, such as required for an engineered tiedown system or engineered accessory building
or structure,the plans, Specifications, and calculations shall be signed by an architect or engineer.
(5) Each plan shall be identified by a model number.
(d) If an application or plans are incomplete or do not conform to this chapter, the applicant shall be
notified in writing within ten (10)working days of the date they are received by the department. The
applicant shall resubmit a corrected application or plans within ninety (90) days of the notice, or within
ninety(90) days of any subsequent notification relating to a resubmittal, along with the fees required by
Section 1020.9 of this section.
(e) Should the applicant cancel the application for the standard plan approval prior to obtaining
department approval, all fees submitted will be retained by the department for services rendered.
(f) A standard plan approval shall expire twenty-four(24) months from the date of the department's
approval as designated on the department's stamp of approval placed on the plans.
(g) A standard plan approval may be renewed on or before the expiration date by submitting an
application, together withthree (3) copies of the plan as required by subsections (b)(1)and (2), and a
renewal fee of two hundred three dollars ($203).
(1) Renewal of a standard plan approval is permitted only when the plan submitted is identical to the
plan on file with the department.
(2) Each plan submitted for renewal shall provide a space not less than three_(3) inches by three(3)
inches for the department's standard plan approval stamp and number.
(3)When a standard.plan approval is renewed,the department-issued number shall remain the
same.
(h) An application for approval of revisions to a standard plan approval,which does not change the
structural system or method of the system's construction, and is submitted prior to the approval's
expiration date, shall be submitted with the following documentation:
(1)three (3) copies of the revised plan and specifications;
(2)two (2) copies of the revised design calculations, as required by subsection (b)(2); and
(3)the plan check fee,for the first hour, for each plan.
(i) An applicant with a revised standard plan approval shall submit the following to the department:
(1)an application for a standard plan approval as specified in subsection (b)(1) above;
(2)copies as specified in subsections (h)(1) and (2) above; and
(3)a resubmission fee, as specified in Section 1020.9 above,for each plan.
(j)A revised plan submitted pursuant to Section 1020.9 above, shall be processed as provided by
subsection (h) or subsection (i), depending upon whether or not the changes to the plan are substantive,
A plan submitted after the final expiration shall be processed as.a new application with appropriate fees
assessed.
(k)When amendment of applicable laws or the department's regulations requires changes to an
approved plan,the department shall:
(1) notify the applicant of the changes, and
(2) allow the applicant one hundred eighty(180)days from the date of notification to submit a revised
plan for approval or until the expiration date of the standard plan approval,whichever occurs first.
(1)Written approval shall be evidenced by the department's stamp of approval on the plans. The stamp
of approval shall include'a unique department-issued standard plan approval identification number for
each approved plan, specification, or installation instruction.
(m) Standard plan approval for each accessory building or structure,foundation system,or engineered
tiedown system is contingent upon compliance with the requirements of this article. The department may
conduct inspections to determine compliance with an approved plan. Violation of any of the provisions of
Final Regulations
Title 25, Chapters 1, 2, 2.2, 3, 4 and 5.5 Page 14
EH, MP,SOP, FBH, MH and OL
this article or variations from an approved plan shall be cause for cancellation of the standard plan
approval.
(n) Reproductions of an approved plan bearing a department-issued standard plan approval for the
purpose of obtaining a permit to construct a foundation system or accessory building or structure shall be
clear and legible,
(o) When an applicant who has obtained a standard plan approval discontinues the business, has
notified the department, or the department makes that determination,the standard plan approval shall be
canceled,
(p)The department shall be notified of any change in the name of an applicant or change in name or
ownership of an applicant's business. The department may grant a standard plan approval to the new
owner, if the new owner provides a written certification that the accessory building-or structure foundation
system or engineered tiedown system will be constructed in accordance with the existing standard plan
approval and submits the completed form designated by the department,together with a ten dollar ($10)
fee. The certification, application, and fee shall be submitted for each plan with a separate standard plan
approval.
(q)An applicant shall notify the department, in,writing, within ten (10) days of any change to their
address. The notification shall be accompanied with a ten dollar($10) change of address fee,
(r) Plans with a standard plan approval from the department shall be accepted by the enforcement
agency as approved for the purpose of obtaining a construction permit when the design loads and
allowable soil conditions of specified in the plans are consistent with the requirements for the locality.
Local enforcement agencies shall not require the original signature of the architect or engineer on the
standard plan approval.
NOTE:Authority cited: Sections 18300,18502, 18502.5,18551 and 18613.4, Health and Safety Code. Reference:
Sections 18502,18502.5,18551,18552 and 18613.4, Health and Safety Code.
o `
Final Regulations
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5 Page 15
EH, MP, SOP, FBH, MH and OL
Chapter 2.Mobilehome Parks and Installations
Article 1.Administration and Enforcement
Amend Section 1025.
§ 1025. Earthquake Resistant Bracing System Fees.
(a) Certification application fee, two hundred three dollars ($203).
(b) Certification Renewal fee, two hundred three dollars ($203).
(c) Certification review fees .Two hundred three dollars ($203) providing the related certification review
does not exceed one hour. When the related certification review exceeds one hour,the following fees
shall apply:
(1) Second and subsequent whole hours:ninety-two dollars ($92).
(2) Each thirty(30) minutes, or fractional part thereof:forty-six dollars ($46).
The balance of certification review fees due shall be paid to the department prior to the issuance of
certification.
(d) When the department is the enforcement agency:
(1) Inspection or reinspection fee . One hundred ninety-six dollars ($196) provided the related
inspection or reinspection does not exceed one (1) hour.When the related inspection or reinspection
exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30)'minutes, or fractional part thereof: forty-one dollars ($41).
(2) A minimum fee of one hundred ninety-six dollars ($ 196) shall be submitted with each application
for a permit or reinspection. Any additional fees required shall be paid upon completion of the
inspection or reinspection.
(e) Change of ERBS-manufacturer's name,ownership or address fee, sixty-two.dollars($62).
NOTE:Authority cited: Sections 18502.5,113613.5 and 18613.7, Health and Safety Code. Reference: Sections 18300,
18502.5,18613.5 and 18613.7,Health and Safety Code.
Final Regulations
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5 Page 16
EH, MP, SOP, FBH, MH and OL
Chapter 2.Mobilehome Parks and Installations
Amend Title for Article 10.
Article 10.Violations, Complaints, Abatement, and Hearings
Amend Section 1611.
§1611., Notice of Violation, Complaints, and Orders to Correct.
(a)(1) Whenever the enforcement agency finds a condition that constitutes a violation of this chapter,.
the Health and.Safety Code, or any other applicable provision of law,the enforcement agency shall
provide a written notice to the person or entity responsible for correction of the violation.
(2) The written notice shall state the conditions which constitute the violation including a reference to
the law or regulation being violated, and shall order its abatement or correction within five (5) days after
the date of notice or a longer period of time as allowed by the enforcement agency.
(3) If a unit is in such condition that identification numbers are not available to determine ownership,
the notice shall be given to the owner of the real property, or if located in a park, the owner or operator of
the park.
(4) Whenever the enforcement agency determines a unit, habitable accessory building or structure, or
permanent building constitutes an imminent hazard representing an immediate risk to the life, health, or
the safety of an occupant,the enforcement agency shall post a notice on the structure, declaring it
uninhabitable. The unit, habitable accessory building or structure, or permanent building shall not be
occupied until deemed safe by the enforcement agency. At the time of the posting,the enforcement
agency shall issue a notice as described in this section to the registered owner.A copy of the notice shall
be issued to the occupant of the unit, or accessory building or structure, or permanent building, if the
occupant is not the registered owner.
NOTE:Authority cited: Sections 18300,18605,18610,18620, 18630,18640,18670,18690 and 18691 Health and Safety
Code. Reference:Sections 18300,18402,18404,18500,18550,18605,18610,18620,18630,18640,1B670,18690 and
18691,Health and Safety Code.
Final Regulations
Title 25,Chapters 1, 2, 2.2, 3,4 and 5.5 Page 17
EH, MP,SOP, FBH, MH and OL
Chapter.2.2. Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2004.5
§2004.5. Complaint Investigations.
(a) When a complaint alleging violations of this Chapter, Chapter 2 or Sections 18200 through 18700
and 18860 through 18874,1of the Health and Safety Code is referred to a local enforcement agency, the
agency shall do the following:
(1) Make reasonable efforts to contact the complainant to discuss the complaint. If the issue
addressed within the complaint exceeds the authority or jurisdiction of the enforcement agency,the
complainant shall be so',,advised, and shall be directed,when possible,to the appropriate governing
entity.
(2) Investigate allegations of violations representing an immediate risk to life, health, or safety within
five (5) days of receipt of the complaint by the agency.
(3) Investigate allegations of violations representing an unreasonable risk to health or safety within
thirty(30) days of receipt by the agency.
(4) Discuss the results of the investigation with the complainant,or provide the results in writing, if
requested by the complainant.
(b)When a complaint is referred to a local enforcement agency from the Office of the Mobilehome
Ombudsman (Office),the,local enforcement agency shall, no later than thirty-five (35) days following its
receipt of the complaint, submit a written report detailing the final results of the investigation to the Office,
or its designee.
(c) When an inspection 1 as a result of a health and safety complaint results in a written order to correct
for a violation of this chapter and a reinspection reveals that the cited person failed to correct the
violation,the enforcement agency shall be compensated by the person responsible for correction of
violation for any subsequent reinspection to verify correction of the violation at the following hourly rate.
(1)one hundred ninety-six dollars ($196) providing the reinspection does not exceed one hour.
When the reinspection exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty (30) minutes or fractional part thereof:forty-one dollars ($41).
NOTE:Authority cited:Sections 18153, 18300 and 18865 and, Health and Safety Code.Reference:Sections 18153,
18300,18862.17,18865,18866,and 18866.5,Health and Safety Code.
Final Regulations
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5 Page 18
EH, MP,SOP, FBH, MH and OL '
Chapter 2.2.Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2016.
§2016:Approval of Alternates and Equivalents.
When the department is the enforcement agency,a request for approval of an alternate or equivalent
means of meeting the requirements of this chapter shall be submitted by the applicant to the
department's Northern or Southern area office.When a city,county,or city and county has assumed
enforcement responsibility for this chapter,the applicant shall submit"the request for this approval to the
local enforcement agency.The local enforcement agency shall forward the request to the department's
Administrative Office of the Division of Codes and Standards,along with its written recommendation and
rationale for approval or denial.The request shall be submitted on forms,as defined in.Section 2.002 of
this chapter, provided by the department.The form shall be accompanied by one (1)-set of substantiating
plans and/or information together with the alternate approval fee of two hundred three dollars ($203),
payable to the department.
NOTE:Authority cited:Section 18865,Health and Safety Code.Reference:Sections 18865.6 and 18870.3,Health and
Safety Code.
Final Regulations
Title 25, Chapters 1, 2,2.2, 3,4 and 5.5 Page 19
EH, MP,SOP, FBH, MH and OL
Chapter 2.2. Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2017.
§ 2017.Technical Service Fee.
(a) Fees for technical services provided by the enforcement agency shall be:
(1) one hundred ninety-six dollars ($196) provided the technical service does not exceed one hour.
When the technical service exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30) minutes, or fractional part thereof: forty-one dollars ($41).
NOTE: Authority cited: Sections 18865 and 18870.3,Health and Safety Code. Reference: Sections 18870.3 and
18870.4, Health and Safety Code.
Final Regulations
Title 25, Chapters 1, 2,2.2, 3, 4 and 5.5 Page 20
EH, MP,SOP, FBH, MH and OL
Chapter 2.2. Special Occupancy Parks
Article 1. Administration and Enforcement
Amend Section 2020.4.
§ 2020.4. Fees for Accessory Structure Permits with a Standard Plan Approval.
(a) The following permit fees shall apply for accessory structures that have a standard plan approval:
(1) Inspection Fee: One hundred ninety-six dollars ($196) provided the inspection does not exceed
one hour. When the inspection exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty (30) minutes, or fractional part thereof: forty-one dollars($41).
(2) Reinspection Fee: One hundred seventy-eight dollars ($178) provided the reinspection does not
exceed one hour. When the reinspection exceeds one hour, the following fees shall apply:
(A) Second and subsequent whole hours:, eighty-two dollars ($82).
(B) Each thirty (30) minutes, or fractional part thereof: forty-one dollars($41).
(b) Fees for accessory structures that do not have the department's standard plan=approval issued in
accordance with Section 2020.9 of this article shall be determined using the valuation table contained in
Section 2020.7 of this article.
(c) Electrical, mechanical, and plumbing permit fees for installations in accessory structures shall not
exceed those contained in this chapter.
(d) Plan check fees shall not be required for accessory structures for which a standard plan approval
has been obtained from the department.
NOTE: Authority cited: Section 18865,18870.3 and 18871.3,Health and Safety Code. Reference: Sections 18865,
18870,18870.2,18870.3, 18870.4 and 18811.3,Health and Safety Code.
Final Regulations
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5 Page 21
EH, MP,SOP, FBH, MH and OL
Chapter 2.2. Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2020.7.
§2020.7.Permit Fees for Park Construction or Alteration.
(a)Any person submitting an application for a permit to construct with plans not having a department
standard plan approval shall pay the following fees, as applicable:
(1) Permit Fee. For the purpose of determining fees, the enforcement agency may establish the
permit fee in accordance with subsection (f) or (g) of this section as appropriate. However, the
minimum permit fee shall be one hundred ninety-six dollars($196) provided the initial related
inspection associated with this permit does not exceed one hour. When the related inspection exceeds
one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30) ,minutes, or fractional part thereof:forty-one dollars ($41).
(2) Plan Check Fee. One-half(112) of the combined total of construction, mechanical, plumbing, and
electricalpermit fees. However, the minimum fee shall be ten dollars ($10).
(b) Reinspection Fee: One hundred seventy-eight dollars ($178) provided the reinspection does not
exceed one hour. When the reinspection exceeds one hour,the following fees shall apply:
(1)Second and subsequent whole hours: eighty-two dollars ($82).
(2) Each thirty(30) minutes, or fractional part thereof:forty-one dollars ($41).
(c) When any person files applications simultaneously to construct two(2)or more permanent
buildings, or accessory buildings or structures which are identical and are within the same park, only one
(1) plan check fee shall be required.
(d) Electrical, mechanical, and plumbing permit fees shall not exceed those contained in this chapter.
(e) When plans and specifications fail to comply with the requirements of this chapter,the enforcement
agency shall notify the applicant in writing, stating in what respects the plans do not comply. The
applicant shall correct the plans and/or specifications and resubmit them to the enforcement agency.
The following fees are required for each resubmission of plans or specifications subsequent to the initial
plan check:
(1) Plan Check Fee. 'Two hundred three dollars ($203) provided the plan check does not exceed on
hour. When the plan check exceeds one hour, the following fees shall apply:
(A) Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty (30) minutes, or fractional part thereof:forty-six dollars ($46).
(f) Fees for construction or alteration of facilities and installations on lots and within parks shall be the
sum of the following categories comprising the proposed work subject to the minimum amounts specified
in subsection (a)(1):
(1) For each lot„-•.................................•-----.............. ........$5 :75
(2) Electrical Permit Fees.
Each park electrical service------------------------------------•------------....------------------....._.............14.00
Each unit substation or,secondary distribution transformer.............................................. 10.50
Each alteration or replacement of a service or a transformer....... ........ ......... ..............10.50
Each park lot electrical service equipment-• ---__-----------------J---------*.....
----- ---------------- - -...... _-_---_ 7.00
......-----------
Each alteration, repair,-or replacement of a park lot electrical service equipment............... 7.00
Each street light including circuit conductors and control equipment...................................3.00
(3) Plumbing Permit Fees.
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 22
EH, MP, SOP, FBH, MH and OL
Each park sewage drainage system _____ __ __14.00
...................................................................
Each private sewage disposal system or park water treatment installation ___14.00
Each lot drain inlet7.00
••. ------•-••-----•• ------------- --•------------•--........................_.
Each alteration or repair of drainage or vent piping______________________________ 7.00
Each park water distribution system _____•______________________________________________________________7,00
Each park lot water service outlet or outlets at the same location____________________ -4.25
Each fire hydrant or riser --------•.....................................................4.25
Each individual lot water conditioning installation4.25
.............................-----............................
Each alteration, repair or replacement of water fixtures or equipment_____________ 4.25
(4) Gas Piping Permit Fees.
Each park gas piping system............ ........................................................................-----7.00
Each installation of a liquefied petroleum or natural
gas tank of 60 gallon capacity or more........................_....................................................7,00
Each-gas riser outlet ___; 4.25
Each alteration,repair, or replacement of park's gas piping system---------- -----
___4.25
(5) Each installation of equipment regulated by this chapter,for which no other fee is listed 7.00
(g) Permit fees for a permit to construct accessory buildings or structures without a standard plan
approval from the department, and foundation systems, permanent buildings, and/or electrical,
mechanical, and plumbing installations within or on permanent buildings, or accessory buildings or
structures shall be the sum of the following categories comprising the proposed work subject to the
minimum amounts specified in subsection (a)(1):
(1) Table A. Construction Permit Fees.
Total Valuation Fee
$2;000 or less. __.. _ $45.00
$2,001 to$25,000._______ ____________________________________________________________ $45.00 for the first$2,000 plus$9.00 for each
additional thousand or fraction thereof,to and including$25,000.
$25,001 to$50,000.__________________________________-- - .....,________________$252.00 for the first$25,000 plus$6.50 for each
_
additional thousand or fraction thereof,to and including $50,000.
$50,001 to$100,000.
......................... --- - ....______-___________$414.50 for the first$50,000 plus$4.50 for each additional thousand or fraction thereof,to and including$100,000.
$100,001 to$500,000---------------------------------------------------------------$639.50 for the first$100,000 plus$3.50 for each
additional thousand or fraction thereof,to and including$500,000.
$500,001 to$1,000,000.___________________________________ ____$2,039.50 for the first$500,000 plus.$3.00 for
each additional thousand or fraction thereof,to . and including$1,000,000.
$1,000,001 and up......................................................... __$3,539.50 for the first$1,000,000 plus$2.00 for
each additional thousand or fraction thereof.
(2) Table B. Mechanical and Plumbing Permit Fees.
Each plumbing fixture,trap, set of fixtures on one trap, including water,
drainage piping and backflow protection therefore...................................................$3.00
Eachbuilding sewer..............................................................................................14.00
Each private sewage disposal system....................................................................
14.00
Each water heater and/or vent 7.00
Each gas piping system for one to five outlets__ 7.00
-_,___-•---____,-•-__--•___•--____•...............
- - ..--• •-- _ 1.50
Each gas piping system for six or more outlets, per outlet-•:_.__
....................................
Eachgas regulator.................................•---------------•------•---........................----........1.50.
Each water branch service outlet or outlets at the same location,
or each fixture supply__________________________ 1.00
Each installation of water treating equipment______________________________________________ __ 7:00
Final Regulations
Title 25, Chapters 1, 2,2.2, 3,4 and 5.5 Page 23
EH, MP, SOP, FBH, MH and OL
Alteration or repair of water piping or water treating equipment..................................7.00
Alteration or repair of drainage or vent piping_________________________________________ ,_.__._.7.00,
Each lawn sprinkler system on any one meter, including backflow
protection devices _ 7.00
...•---•••................................................•----......_.....-------•---_----
Vacuum breakers or backflow protective devices on
tanks,vats, etc., or for installation on unprotected
plumbing fixtures: one to five............................................................_.....................3.00
over five,each additional ________.•______________________ 1.00
The installation or relocation of each forced-air or
gravity-type furnace or burner, including ducts and
vents attached to such appliance, up to and including 100,000 Btu 14.00
...........................
The installation or relocation of each forced-air or gravity-type furnace or burner,
including ducts and vents attached to such appliance over 100,000 Btu....................21.00
The installation or relocation of each floor furnace, including vent..............................7.00
The installation or relocation of each suspended heater,
recessed wall heater orlfloor-mounted unit heater 7.00
.....................................................
The installation, relocation or replacement of each appliance
vent Installed and not Included in an appliance permit_____ __•_ ..... _... ........_ _ 7.00
The repair of, alteration':i of, or addition to each heating appliance, refrigeration
unit,comfort cooling unit, absorption unit, or each comfort heating, cooling,
absorption, or evaporative cooling system, including installation of controls___ 14.00
The installation or relocation of each boiler or compressor to and including three
horsepower or each absorption system to and including 100,000 Btu14.00
______________ _ _ __
The installation or relocation of each boiler or compressor over three
horsepower or each absorption system over 100,000 Btu.........................................21.00
Each air handling unit, including ducts attached thereto__________________________ ______________7.00
NOTE: This fee shall not apply to an air.handling unit which is a portion of a factory-assembled appliance,comfort cooling
unit,evaporative cooler or absorption unit for which a permit is required elsewhere in this chapter.
For each evaporative cooler other than portable type.......
7.00
For each vent fan connected to a single duct 3.00
. .. .... .... . ...
For each vent ventilation system which is not a portion of any heating
or air conditioning system authorized by a permit.....................................................7.00
Each installation of equipment regulated by this chapter
for which no other fee is listed 7.00
(3) Table C. Electrical Permit Fees.
Each wiring outlet where current is used or controlled, except services,
sub-feeders and meter,;outlets...................................................................................35
Each fixture, socket or other lamp holding device -------------------------------------------------------35
Each motor of not more than 50 h.p................................................................. 4.25
Each motor of more than 50 h.p. ____ _________ _________ _________ _________ ________ ________________10.50
Each mercury arc lamp,and equipment.___. 1.00
Each range,water heater or clothes dryer installation . _ _.__-- _- • __- _ 7.00
Each space heater or infrared heat installation -•• ••• _••-• _ _______ -_-•-•______• _ 1.50
Each stationary cooking unit, oven, or space heater________ _________ ________ ________ ______1.50
Final Regulations
Title 25, Chapters 1,2, 2.2', 3, 4 and 5.5 Page 24
EH, MP, SOP, FBH, MH and OL
Each garbage disposer, dishwasher, or fixed motor-operated
appliance not exceeding 1/2 h.p................ 1.50
Working light in buildings in course of construction or undergoing
repairs, or where temporary lighting is to be used .................3.00
Each incandescent electric sign......................... ....... . .........•_--••_._-__•--_--_.--_---:1.50 _
Electric signs or outline lighting, luminous gas type with: 1 to 4 transformers 3.00
..............
Additional transformers, each .................•---•--........._..............._.................................35
Each rectifier and synchronous converter, per K.W. __-- •-_•••-.35
Each additional circuit for a mobilehome accessory building
or structure or other electrical equipment.................................................................1.50
Each service:
600 volts or less, not over 200-amperes... _••• •-••- .......7.00
•-------------•.................._.......--
600 volts or less, over 200-amperes.......................................................................
10.00
Over 600 volts 14.00
Each installation of equipment regulated by this chapter far
which no other fee is listed •._•.-•-:-•-•7.00
NOTE:Authority cited: Sections 18865,18870.3 and 18871.3,Health and Safety Code. Reference:Sections 18870.2,
18870.3 and 18870.4,Health and Safety Code.
Final Regulations -
Title 25, Chapters 1, 2, 2.2, 3, 4 and 5.5 Page 25
EH, MP,SOP, FBH, MH and OL
Chapter 2..2.Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2020.9
2020.9.Application and Fee Requirements.for Standard Plan Approvals.
(a)A standard plan app(oval is available from the department for a plan for an accessory structure
constructed and installed pursuant to this article and Article 9 of this chapter
(b) In order to obtain a standard plan approval,the applicant shall submit to the department the
following items:
(1)A completed application for standard plan approval on the form, as defined in Section 2002 of this
chapter,designated by the department.
(2)Three (3)copies of,the plans,specifications, and/or installation instructions, if applicable, and two
(2)copies of the design calculations,when required,to substantiate the design. Specifications shall be
shown on the plan. Design; calculations shall be submitted separately from the plan sheet.
(3)An application fee of two hundred three dollars ($203)for each plan.,
(4)?Ian check fee. Two hundred three dollars ($203) provided the plan check does not exceed one
hour. When the plan check exceeds one hour the following fees shall apply:
(A) Second and subsequent whole hours:ninety-two dollars ($92).
(B) Each thirty (30) f'minutes,or fractional part thereof:forty-six dollars($46).
(5)Additional plan che'ck fees shall be due and payable prior to the issuance of a plan approval or a
revised plan approval, ifmore than one (1)hour is required to conduct the plan check.
(6)When plans and specifications fail to comply with the requirements of this chapter,the
enforcement agency shall
notify the applicant in writing, stating in what respects the plans do not
comply. The applicant shall correct the plans and/or specifications and resubmit them to the
�
enforcement agency or w ithdraw them from consideration, forfeiting all submitted fees.
(7)An Identification Label of Approval shall be provided for each accessory building or structure to be
manufactured under thellstandard plan approval, and each accessory building or structure shall have
an approved identificatio"n label of approval attached in a visible location.
(8)The actual identification label shall be submitted to the department for approval with the
application for a standard plan approval prior to issuance of the approval.The approved identification
label of approval shall:
(A) be not less in size than three (3) inches by one and one-half(1 Y2) inches;
(B)contain the follow' Ing information, as applicable;
Final Regulations
Title 25,Chapters 1, 2, 2.2, 3,4 and 5.5 Page 26
EH, MP,SOP, FSH, MH and OL
ACCESSORY BUILDING OR STRUCTURE
1. Name of Manufacturer
2. Standard Plan Approval No._
3. Designed for:
_lbs.per square foot roof live load
_lbs.per square foot horizontal wind load
_lbs.per square foot snow load
_lbs.per square foot floor live toad
_lbs.per square foot wind uplift load
4. Structure.(may)(may not)be enclosed.
Department of Housing and Community Development
(C) be.provided by the manufacturer and be permanently imprinted with the information required by
this section;
(9)The identification label of approval shall be'either Type I, II, or III as specified in this section, each
capable of a ten year life expectancy when exposed to ordinary outdoor environments. Letters and
numbers shall be bold Gothic or similar style, varied for emphasis, as large as space permits, with the
minimum size being 5164 inch. Wording shall be easily read and concise. Where permanent type
adhesives are used on Type I, II, or III plates, adhesives shall have a minimum thickness of.004 inches
and the plates shall be affixed to a relatively smooth surface.
(A) Type I. Rigid metal plates affixed by screws,rivets, or permanent type adhesives.
Minimum size: one and one-half (1.1/2) inches by three (3) inches by ,020 inches thick net
dimensions (inside fastener heads).
Material:.,Aluminum, brass or stainless steel etched, stamped, engraved, or embossed to 0.015-
inch minimum depth differential, color anodized or enamel filled.
(B) Type II, Flexible metal plates affixed by permanent adhesives, either pressure sensitive
acrylics or solvent activated resins.
Minimum Size: .005 inch by one and one-half(11/2) inches by three (3) inches.
Material: Aluminum foil etched or stamped to.001 inches minimum depth differential with color
anodized background.
(C) Type III. Metallized Mylar(polyester), surface bonded.
Minimum Size: .003 inches by one and one-half(1'/2) inches by three (3) inches.
Material: Aluminum/vinyl surface bonded (to be used for nameplates where variable information is
required by embossing,which can be done with a conventional typewriter).
Minimum Size: .006 inches by one and one-half(1'/2) inches by three (3) inches.
(c) Plans submitted to the department shall be on sheets of paper no smaller than eight and one-half(8
1/2) inches by eleven (11) inches, and no larger than thirty(30) inches by forty-two(42) inches.
(1) Plans shall indicate the details of connections, dimensions, footings,foundations, general notes
and method of installation necessary for the design and construction of the system.
(2)A plan shall indicate only one model or type of system.
(3) Each plan sheet shall provide a space not less than three (3) inches by three (3) inches for the
department's standard plan approval stamp and number.
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 27
EH, MP,SOP, FBH, MH and OL
(4)When the design of the system requires an engineering analysis of structural parts and methods
of construction, such as required for an engineered tiedown system or engineered accessory building
or structure,the plans, specifications, and calculations shall be signed by an architect or engineer.
(5) Each plan shall be'identified by a model number.
(d) If an application or plans are incomplete or do not conform to this chapter,the applicant shall be
notified in writing within ten (10) working days of the date they are received by the department. The
applicant shall resubmit a corrected application or plans within ninety(90) days of the notice, or within
ninety(90) days of any subsequent notification relating to a resubmittal, along with the fees required by
Section 2020.9 of this section.
(e) Should the applicariCcancel the application for the standard plan approval prior to obtaining
department approval, all fees submitted will be retained by the department for services rendered.
(f) A standard plan approval shall expire twenty-four (24) months from the date of the department's
approval as designated onthe department's stamp of approval placed on the plans.
(g)A standard plan approval may be renewed on or before the expiration date by submitting an
application,together with three (3) copies of the plan as required by subsections (b) (1) and (2), and a
renewal fee of (two hundred three dollars ($203).
(1) Renewal of a standard plan approval is permitted only when the plan submitted is identical to the
plan on file with the department.
(2) Each plan submitted for renewal shall provide a space not less than three (3)inches by three (3)
inches for the department's standard plan approval stamp and number.
(3) When a standard plan approval is renewed, the department-issued number shall remain the
same.
(h)An application for approval of revisions to a standard plan approval,which does not change the
structural system or method of the system's construction, and is submitted prior to the approval's
expiration date, shall be submitted with the following documentation:
(1)three (3) copies of the revised plan and specifications;
(2)two (2) copies of tte revised design calculations,.as required by subsection (b) (2); and (3) the
plan check fee,for the first hour,for each plan.
(i) An applicant with a revised standard plan approval shall submit the following to the department:
(1)an application for a standard plan approval as specified in subsection (b) (1) above;
(2)copies as specified in subsections (h) (1) and (2) above; and
(3)a resubmission fee, as specified in Section 2020.9 above,for each plan.
0) A revised plan submitted pursuant to Section 2020.9 above, shall be processed as provided by
subsection (h) or subsection (i), depending upon whether or not the changes to the plan are substantive.
A plan submitted after the final.expiration shall be processed as a new application with appropriate fees
assessed.
(k)When amendment of applicable laws or the department's regulations requires changes to an
approved plan,the department shall:
(1)notify the applicant of the changes, and
(2)allow the applicant one hundred eighty (180) days from the date of notification to submit a revised
plan for approval or until;the expiration date of the standard plan approval, whichever occurs first.
(1)Written approval shall be evidenced by the department's stamp of approval on the plans. The stamp
of approval shall include a'unique department-issued standard plan approval identification number for
each approved plan, specification, or installation instruction.
(m) Standard plan approval for each accessory building or structure,foundation system, or engineered
tiedown system is contingent upon compliance with the requirements of this article. The department may
conduct inspections to determine compliance with an approved plan. Violation of any of the provisions of
Final Regulations
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5 Page 28
EH, MP,SOP, FBH, MH and OL
this article or variations from an approved plan shall be cause for cancellation of the standard plan
approval.
(n) Reproductions of an approved plan bearing a department-issued standard plan approval for the
purpose of obtaining a permit to construct a foundation system or accessory building or structure shall be
clear and legible.
(o) When an applicant who has obtained a standard plan approval, discontinues the business, has
notified the department, or the department makes that determination,the standard plan approval shall be
canceled.
(p) The department shall be notified of any change in the name of an applicant or change in name or
ownership of an applicant's business. The department may grant a standard plan.approval to the new
owner,if the new owner provides a written certification that the accessory building or structure foundation
system or engineered tiedown system will be constructed in accordance with the existing standard plan
approval and submits the completed form designated by the department,together with a ten dollar ($10)
fee. The certification, application, and fee shall be submitted for each plan with a separate standard plan
approval.
(q)An applicant shall notify the department, in writing, within ten days of any change to their address.
The notification shall be accompanied with a ten dollar*($10) change of address fee.
(r) Plans with a standard plan approval from the department shall be accepted by the enforcement
agency as approved for the purpose of obtaining a construction permit if when the design loads and
allowable soil conditions specified in the plans are consistent with the requirements for the locality. Local
enforcement agencies shall not require the original signature of the architect or engineer on the standard
plan approval.
NOTE:Authority cited: Sections 18865, 18870.2 and 18870.3, Health and Safety Code. Reference:Sections 18870.3,
18871.2 and 18871.3, Health and Safety Code.
Final Regulations
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5 Page 29
EH, MP,SOP, FBH, MH and OL
Chapter 2.2. Special Occupancy Parks
Amend Title for Article 10.
Article 10.Violations,'Complaints,Abatement,and Hearings
Amend Section 2611.
§ 2611. Notice of Violation, Complaints,and Orders to Correct.
(a)(1)Whenever the enforcement agency finds a condition that constitutes a violation of this chapter,
the Health and Safety Code, or any other applicable provision of law,the enforcement agency shall
provide a written notice to the person or entity responsible for correction of the violation.
(2)The written noticefshall state the conditions which constitute the violation including a.reference to
the law or regulation being violated, and shall order its abatement or correction within five(5)days after
the date of notice or a longer period of time as allowed by the enforcement agency.
(3) If a unit is in such icondition that identification numbers are not available to determine ownership,
the notice shall be given to the owner of the real property,or if located in a park,the owner or operator
of the park.
(4)Whenever the enforcement agency determines a unit,habitable accessory building or structure,
or permanent building constitutes an imminent hazard representing an immediate risk to the life, health,
or the safety of an occupant,the enforcement agency shall post a notice on the structure,declaring it
uninhabitable.The unit,j,habitable accessory building or structure, or permanent building shall not be
occupied until deemed safe by the enforcement agency. At the time of the posting,the enforcement
agency shall issue a notice as described in this section. A copy of the notice shall be issued to the
occupant of the unit, accessory building or structure, or permanent building, if'different from the
registered owner.
�4
NOTE:Authority cited:Sections 18865,Health and Safety Code.Reference: Sections 18866.3,18866.5,18871.10 and
18872,Health and Safety Code.
Final Regulations
Title 25,Chapters 1,2,2.2,3,4 and 5.5 Page 30
EH, MP,SOP, FSH,MH and OL
i
i
Chapter 3. Factory-Built Housing and Mobile Homes
Subchapter 1. Factory-Built Housing
Article 4.'Fees
Amend Section 3060.
§ 3060. Fees.
(a) Plan Fees.
(1) Plan Filing Fees.
(A) Sixty dollars($60)for each new model.
(B)Twenty dollars ($20)for each individually submitted change to an approved plan.
(2) Plan Checking Fee Deposit.
(A)Three hundred dollars ($300) for each new model.
(B)One hundred fifty dollars($150)for each building component model.
(C)The department may require a plan checking fee deposit not exceeding three hundred dollars
($300) for changes to approved plans. The plan checking fee deposit less actual costs as
determined by the department shall be refundable.
(3) Plan Checking Fees.Two hundred three dollars ($203) provided the plan check does not exceed
one hour. When the plan check exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: ninety-two dollars ($92).'
(6) Each thirty (30) minutes, or fractional part thereof: forty-six dollars ($46).
(4) Plan Renewal Fee. Sixty dollars ($60) for plan renewal for each model.
(5) Plan Renewal Plan Checking Fees.Two hundred three dollars ($203) provided the plan renewal
plan check does not exceed one hour. When the plan renewal plan check exceeds one hour,the
following fees shall apply:
(A)Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30) minutes, or fractional part thereof:forty-six dollars ($46).
(b) Quality Control Manual. Twenty dollars ($20)for each individually submitted change to an
approved quality control manual.
(c)Inspection and Technical Service Fees.
(1) One hundred ninety-six dollars($196) provided the inspection, or technical service does not
exceed one hour. When the inspection, monitoring, or technical services exceeds one hour,the
following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30) minutes, or fractional part thereof: forty-one dollars ($41).
(d) Out-of-State Inspection and Technical Service Fees. Fees shall be in accordance with subsection
(c) plus total travel cost based on published air fare, or equivalent rate, between the point of departure
in California and the point of inspection, plus necessary supplemental surface transportation;and
reimbursement for food and lodging consistent with California State Department of Personnel
Administration.
(e) Periodic Monitoring Inspection Fees. Periodic monitoring inspection fees shall be paid for
inspection time and required travel time from the point of departure in California, in accordance with
subsection (c). If reinspections are necessary as a result of a periodic monitoring inspection;the
reinspection and travel time from the point of departure in California shall be paid in accordance with
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 31
EH, MP, SOP, FBH, MH and OL
subsection (c). Out-of-state travel costs for periodic monitoring inspections and reinspections shall be
paid in accordance with subsection (d).
(t)insignia Fees.
(1) Sixty-two dollars ($62) for each insignia,excepting building components.
(2) Five dollars ($5) for each individual building component.
(3) Sixty-two dollars ($62) for replacement insignia.
(g) Reciprocal Insignia Fees.
(1) Insignia fees for units manufactured in California shall be as specified in subsection (f).
(2)Two dollars($2)for each single family dwelling unit, dwelling unit, individual dwelling room or
combination of rooms thereof, shipped from another state under reciprocal agreement,
(3)Ten cents ($,10)fogy each individual building component.
(h) Out-of-State Approval Fee. Initial plant inspection fee shall be in accordance with subsection (c)
and travel cost based on published air fare, or equivalent rate, between the point of departure in
California and the location 10 the factory plus necessary supplemental surface transportation, and
reimbursement for food and lodging consistent with California State Department of Personnel
Administration.
(i) Change in Manufacturer Name, Ownership,or Address Fee. Sixty-two dollars ($62).
(j) Certification Fee-Quality Assurance Agency. Three hundred twenty-eight dollars ($328)for each
certification application.
(k) Quality Approval Agency Renewal. Two hundred eighty-six dollars ($286)for each renewal
application.
(1) Certification Fee-Quality Assurance Inspector. Eight hundred sixty-six dollars ($866)for each
person making request for certification.
(m) Quality Assurance Inspector Renewal. Two hundred fifty-three dollars($253) for each renewal
application.
(n) Certification Fee-Design Approval Agency. Three hundred twenty-eight dollars ($328)for each
certification application.
(o) Design Approval Agency Renewal. Two hundred eighty-six dollars ($286)for each renewal
application,
(p) Design Approval Agency Monitoring Fee.
(1) Forty-two dollars ($42)for each approved plan or plan renewal.
(2) Nineteen dollars ($19) for each amendment to previously approved plans or manuals.
(3)Twenty dollars ($20) for each approved quality control manual.
(q)Alternate Approval, Two hundred three dollars ($203) provided the plan renewal plan check does
not exceed one hour.When the plan renewal plan check exceeds one hour, the following fees shall
apply:
(1)Second and subsequent whole hours: ninety-two dollars ($92).(2) Each thirty(30) minutes, or
fractional part thereof:forty-six dollars ($46).
(r) Alternate Approval Plan Review. Two hundred three dollars ($203)for each hour.
NOTE:Authority cited: Sections,,19982 and 19990,Health and Safety Code. Reference:Sections 19982 and 19990,
Health and Safety Code.
Final Regulations
Title 25,Chapters 1,2, 2.2, 3,4 and 5.5 Page 32
EH, MP,SOP, FBH, MH and OL
Chapter 3. Factory-Built Housing and Mobilehomes
Subchapter 2. Manufactured Homes, Mobilehomes, Multi-Unit Manufactured Housing,
Commercial Modulars, and Special Purpose Commercial Modulars
Article 1.Administration
Amend Section 4044.
§4044. Fees.
(a) Plan Fees.
(1) Plan Checking Fee. Two hundred three dollars ($203) provided the pian check does not exceed
one hour. When the plan check exceeds one hour, the following fees shall apply:
(A)Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30) minutes, or fractional part thereof: forty-six dollars ($46).
(2) Plan Resubmission Fee. Two hundred three dollars ($203)provided the plan resubmission plan
check does not exceed one hour. When the plan resubmission plan check exceeds one hour, the
following fees shall apply:
(A)Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty_(30) minutes, or fractional part thereof: forty-six dollars ($46).
(3) Plan Supplement Fee. Two hundred three dollars ($203),provided the plan supplement plan
check does not exceed one hour. When the plan supplement plan check'exceeds one hour, the
following fees shall apply:
(A) Second and subsequent whole hours: ninety-two dollars($92).
(B) Each thirty(30) minutes, or fractional.part thereof:forty-six dollars ($46).
(4) Plan Renewal Fee. Two hundred three dollars ($203) for each plan or group of plans.
(b)Quality Control Manual Filing Fee. Ten dollars($10).
(c) Inspection, Reinspection, or Monitoring Fees.
(1) Manufactured Home, Mobilehome, Multi-Unit Manufactured Housing, Commercial Modular and
Special Purpose Commercial Modular Manufacturer Monitoring. One hundred ninety-six dollars ($196)
provided the in-plant monitoring does not exceed one hour.When the in-plant monitoring exceeds one
hour,the following fees.shall apply:
�(A) Second,and subsequent whole hours: eighty-two dollars($82).
(B) Each thirty(30) minutes, or fractional part thereof: forty-one dollars ($4.1):
(2) Inspection Fees. One hundred ninety-six dollars ($196) provided the inspection or reinspection
does not exceed one hour. When the inspection or reinspection exceeds one hour, the following fees
shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty (30) minutes, or fractional part thereof:forty-one dollars ($41).
(d)Technical Service Fees.
(1) One hundred ninety-six dollars ($196) provided the technical service does not exceed one hour.
When the technical service exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30) minutes, or fractional part thereof: forty-one dollars ($41).
(e) Alternate Approval Fees. Two hundred three dollars ($203)forthe plan check fee for a minimum of
one hour as established in Section 4008.
(f)Administrative Handling Fees for Federal Labels.
Final Regulations
Title 25,Chapters.1, 2, 2.2, 3, 4 and 5.5 Page 33
EH, MP,SOP, FBH, MH and OL -
(1) Six dollars ($6.00) for each new manufactured home label, issued to cover the costs of postage,
handling and administration.
(g) Insignia Fees.
(1) Fifty-one dollars ($51)for each manufactured home, mobilehome, multi-unit manufactured
housing, commercial modular, or special purpose commercial modular insignia.
(2) Eighty-three dollars ($83) for each department replacement insignia.
(h) Requested Out-of-State Inspection or Technical Service Fee. Total travel cost based on published
air fare, or equivalent rate', between the point of departure from California and the point of inspection,
plus necessary supplemental surface transportation,reimbursement for food and lodging consistent with
California State Department of Personnel Administration allowances and inspection or technical service
fees as specified in this section.
(i) Change in Manufacturer Name, Ownership or Address Fee. Sixty-two dollars ($62).
(j) Component Label Fee. Twenty-four dollars ($24).
NOTE: Authority cited: Section 18015 and 16031,Health and Safety Code. Reference: Section 18031, Health and Safety
Code.
11,
1
Final Regulations
Title 25, Chapters 1, 2, 2.2,'3,4 and 5.5 Page 34
EH, MP,SOP, FBH, MH and OL
Chapter 3. Factory-Built Housing and Mobile Homes
Subchapter 2. Manufactured Homes, Mobilehomes, Multi-Unit Manufactured Housing,
Commercial Modulars, and Special Purpose Commercial Modulars
Article 5.Third-Party Approval and Enforcement
Amend Section 4884.
§4884. Fees.
(a) Application for Design Approval Agency Approval: Three hundred forty-nine dollars($349)
(b) Application for Quality Assurance Agency Approval: Three hundred forty-nine dollars ($349)
(c) Application for Quality Assurance Inspector: Two hundred ninety-five dollars ($295)
(d)Application for Design Approval Agency Approval Renewal:Three hundred two dollars ($302)
(e) Application for Quality Assurance Agency Approval Renewal: Three hundred two dollars ($302)
(f) Application for Quality Assurance Inspector Approval Renewal:Two hundred sixty-seven dollars
($267)
(g) Change'of Third-Party Name, or Address: Sixty-two dollars ($62)
(h) Change of Quality Assurance Inspector Name or Address: Sixty-two dollars($62)
(i) Plan Approval Monitoring:
-(1)for plans relating to a manufactured home, mobilehome, multi-unit manufactured housing or
- commercial modular:, Forty-four dollars ($44); and
(2)for plans relating to a special purpose commercial modular: Forty-four dollars ($44).
(j) Plan Approval Monitoring,for Quality Control Manuals: Forty-two dollars ($42)
(k) Plan Approval Monitoring, for Amendments to Approved Plans or Manuals: Thirty dollars ($30).
NOTE: Authority cited:Section 18020, Health and Safety Code.Reference:Section 18031,Health and Safety Code.
Final Regulations
Title 25,Chapters 1,2, 2.2, 3, 4 and 5.5 Page 35
EH, MP,SOP, FBH, MH and OL
4 +
4 PROOF OF PUBLICATION
(2015.5 C.C.P.)
STATE OF CALIFORNIA
County of Contra Costa
I am a citizen of the United States and a resident of the
County aforesaid; I am over the age of eighteen years,
and not a party to or interested in the above-entitled
matter.
I am the Principal Legal Clerk of the Contra Costa Times,
a newspaper of general circulation, printed, and published
at 2640 Shadelands Drive in the City of''Walnut Creek,
County of Contra Costa, 94598.
And which newspaper has been adjudged a newspaper of
general circulation by the Superior Court of,the County of
Contra Costa, State of California, undr the date of
October 22, 1934. Case Number 19764.
The notice, of which the annexed is a printed copy (set in
type not smaller than nonpareil), has been published in
each regular and entire issue of said newspaper and not
in any supplement thereof on the followingi,dates, to-wit:
June 26, and July 1,
all in the year of 2006
1 certify (or declare) under penalty of perjury that the
foregoing is true and correct.
Exec ed at Walnut Creek, California.
On Ok 5 day of July, 2006
............................................................... .... ...........
Signature
Contra Costa Times
P 0 Box 4147
Walnut Creek, CA 94596
(925) 935-2525
Proof of Publication of:
(attached is a copy of the legal advertisement that
published)
CONTRA COSTA COUNTY
BUILDING INSPECTION
DEPARTMENT
651 PINE STREET, -
4TH FLOOR,NORTH WING
MARTINEZ,CALIFORNIA
94553
NOTICE OF
PUBLIC HEARING I,The Contra Costa County
Board of Supervisors will
conduct a public hearing
on Tuesdayy July 11,2006
at 11 am.in the Board of
Supervisor's Chambers,
651 Pine Street,Martinez,
California,to consider In-
creasing existing fees
and adopting new fees
for performing Inspec-
tions, issuing permits,
plan checks, application
processing, and other
services related to mo-
bilehome parks special
occupancy parks, and
other. noustngvelated
programs enforced by the
Building Inspection De-
partment. Oral and writ-
tenpresentations can be
made at the meeting.
A copy of data's indicat-
ing the amount of cost
estimated cost, requirea i
to provide the service for
which the fees are charg-
ed and the revenue sour-
ces
ources anticipated to pro-
vide the service, will be
on file with the Clerk of
the Board of Supervisors,
651 Pine StreZ Room 106
Martinez. Cali ornia, ana
with the Building Inspec-
tion Department,651 Pine •
Street„ 4th Floor, North
Wing Martinez, Califor-
nia,for public inspection.
I hereby certify that this
Is a true and correct copy
of an action taken and
entered on the minutes of
the Board of Supervisors
on the date shown.
ATTESTED:JUNE 20 2006
JOHN CULL&,Clerk of the
Board of Supervisors,and
County Administrator.
BY:EMY L SHARP Deputy
Legal CCT 6036
Publish lune 26, July 1,
2006
ii
i
I
il.
3 �
_v
PROOF OF PUBLICATION
(2015.5 C.C.P.)
FATE OF CALIFORNIA
aunty of Contra Costa
3m a citizen of the United States and all-resident of the
aunty aforesaid; I am over the age of eighteen years,
id not a party to or interested in they above-entitled
atter.
3m the Principal Legal Clerk of the Contra Costa Times,
newspaper of general circulation, printed and published
2640 Shadelands Drive in the City of,;Walnut Creek,
Runty of Contra Costa, 94598.
nd which newspaper has been adjudged la newspaper of
,neral circulation by the Superior Court of the County of
Dntra Costa, State of California, under the date of
ctober 22, 1934. Case Number 19764. '1
ie notice,of which the annexed is a printed copy (set in
pe not smaller than nonpareil), has been published in
3ch regular and entire issue of said newspaper and not
any supplement thereof on the following dates, to-wit:
if
ine 26, and July 1,
I in the year of 2006
certify (or declare) under penalty of perjury that the
regoing is true and correct.
<ec ed at Walnut Creek, California.
n 5 day of July, 2006
......................................................1... .... ...........
gnature
ontra Costa Times
0 Box 4147
lalnut Creek, CA 94596
)25) 935-2525
roof of Publication of:
ttached is a copy of the legal advertisement that
iblished)
i f
ORDINANCE NO. 2006-14
EXHIBIT A
ORDINANCE NO. 2006-14 �-
(uncodified)
(Mobilehome Parks, Special Occupancy Parks, Manufactured Housing Sales and Occupational
Licensing, Factory Built Housing, and Employee Housing Program Regulatory Fees)
The Contra Costa County Board of Supervisors ordains as follows:
SECTION I. Authority. This ordinance adopts the fees specified in the following sections of Title
25, Code of California Regulations: 1004.5, 1016, 1017, 1020.1, 1020.4, 1020.7, 1020.9, 102,
2004.5, 2016, 2017, 2020.4, 2020.7, 2020.9, 3060, 4044, and 4884.
SECTION H. Notice and Hearing. This ordinance was adopted pursuant to the procedures set
forth in Government Code sections 66016, 66017, and 66018. All required notices have been
properly given and public hearings held.
SECTION III. Tee Adoption. On and after the effective date of this ordinance,the fees set forth in
Exhibit A, which is attached and incorporated into this ordinance, are adopted and shall be charged and
collected for the services enumerated in Exhibit A. The Building Inspection Department fee schedule
shall be revised to be consistent with this ordinance.. .
SECTION IV. Severability. If any fee or provision of this ordinance is held invalid or unenforceable
by a court of competent jurisdiction, that holding shall not affect the validity or enforceability of the
remaining fees or provisions, and the Board declares that it would have adopted each part of this
ordinance irrespective of the validity of any other part.
SECTION V. Supercede. This ordinance supercedes all ordinances,resolutions, and other actions
of the Board of Supervisors establishing fees for the services specified in this ordinance.
ORDINANCE NO. 2006714
1
SECTION VI. Effective Date. This ordinance becomes effective 60 days after passage. Within 15
days of passage, this ordiiiance shall be published once with the names of the supervisors voting for and
against it in the Contra Costa Times, a newspaper published in this County.
PASSED ON by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST: JOHN CULLEN,
Clerk of the Board of Supervisors Board Chair
and County Administrator
By: [SEAL]
Deputy
TLG:
R H:12006\Building Inspection\mobile home fee ord2.wpd
ORDINANCE NO. 2006-14
2
Chapter 2. Mobilehome Parks and Installations
Article 1.Administration and Enforcement
Amend Section 1004.5
§1004.5.Complaint Investigations.
(a)When a complaint alleging violations of this chapter, or sections 18200 through 18700 of the Health
and Safety Code is referred to a local enforcement agency,the local enforcement agency shall do the
following:
(1)Make reasonable efforts to contact the complainant to discuss the complaint. If the issue
addressed within the complaint exceeds the authority or jurisdiction of the enforcement agency, the
complainant shall be so advised, and shall be directed,.when possible,to the appropriate governing
entity.
(2)Investigate allegations of violations representing an immediate risk to life, health, or safety within
five (5)days of receipt of the complaint by the agency.
(3)Investigate allegations of violations representing an unreasonable risk to health or safety within
thirty(30) days of receipt by the agency.
(4)Discuss the results of the investigation with the complainant, or provide the results in writing, if
requested by the complainant,
(b)When a complaint is referred to a local enforcement agency from the Office of the Mobilehome
Ombudsman (Office),the local enforcement agency shall, no later than thirty-five (35) days following its
receipt of the complaint, submit a written report detailing the final results of the investigation to the Office,
or its designee.
(c)When an inspection as a result of a health and safety complaint results in a written order to correct
for a violation of this chapter and a reinspection reveals that the cited person failed to correct the
violation,the enforcement agency shall be compensated by the person responsible for correction of
violation for any subsequent reinspection to verify correction of the violation at the following hourly rate,
(1) First hour: one hundred ninety-six dollars ($196).
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30) minutes or fractional part thereof:forty-one dollars ($41).
NOTE:Authority cited:Sections 18153 and 18300, Health and Safety Code. Reference:Sections 18153,18300,18400,
18400.3 and 18407,Health and Safety Code.
Final Regulations Page 3
Title 25, Chapters 1, 2,2.2, 3,4 and 5.5
EH, MP,SOP, FBH, MH and OL
r Chapter 2.Mobilehome Parks and Installations
Article 1.Administration and Enforcement
Amend Section 1016.
§1016.Approval of Alternates and Equivalents.
When the department is the enforcement agency,a request for approval of an alternate or equivalent
means of meeting the requirements of this chapter shall be submitted by the applicant to the
department's Northern orJ''Southern area office.When a city, county,or city and county has assumed
enforcement responsibility for this chapter,the applicant shall submit the request for this approval to the
local enforcement agency.The local enforcement agency shall forward the request to the department's
Administrative Office of the Division of Codes and Standards, along with their written recommendation
and rationale for approval or denial.The request shall be submitted on forms, as defined in Section 1002
of this chapter, provided by the department.The form shall be accompanied by one(1)set of
substantiating plans and/or information together with the alternate approval fee of two hundred three
dollars($203), payable to the department.
NOTE:Authority cited:Section 18300,Health and Safety Code. Reference:Section 18305 and 18502.5,Health and Safety
Code.
Final Regulations Page 4
Title 25, Chapters 1, 2,2.2, 3,4 and 5.5
EH, MP, SOP, FBH, MH and OL
Chapter 2. Mobilehome Parks and Installations
Article 1.AdministrationandEnforcement
Amend Section 1017.
§1017.Technical Service Fee.
(a) Fees for technical services provided by the enforcement agency shall be:
(1) One hundred ninety-six dollars ($196) providing the technical service does not exceed one hour.
When the related technical service exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30) minutes, or fractional part thereof:forty-one dollars ($41).
NOTE:Authority cited: Section 18300;and 18502.5,Health and Safety Code. Reference: Sections 18502.5,and 18503,
Health and Safety Code.
1
Final Regulations Page 5
Title 25,Chapters 1,2,2.2,3,4 and 5.5
EH, MP, SOP, FBH, MH and OL
i
Chapter 2. Mobilehome Parks and Installations
Article 1.Administration and Enforcement
Amend Section 1020:1.
§ 1020.1. Fees for MH-unit Installation,and Standard Plan Approval Foundation System
Permits.
(a) The following fees shall apply:
(1) Installation of an MH-unit, or multi-unit manufactured housing containing not more than two (2)
dwelling units, or support system alteration permit fee. One hundred ninety-six dollars($196) provided
the related inspection does not exceed one hour. When the related inspection exceeds one hour, the
following fees shall apply:
(A) Second and subsequent whole hours:eighty-two dollars ($82).
(B) Each 30 minutes, or fractional part thereof:forty-one dollars ($41).
(2) Foundation system permit fee: refer to valuation tables in Section 1020.7of this article.
(A) Plan check fees shall not be required for a foundation system for which a standard plan
approval has been obtained from the department.
(3) Reinspection Fee: One hundred seventy-eight dollars ($178) provided the related reinspection
does not exceed one hour. When the related reinspection exceeds one hour;the following fees shall
apply:
(A) Second and subsequent whole hours:eighty-two dollars ($82).
(B) Each thirty minutes (30), or fractional part thereof:forty-one dollars ($41).
NOTE:Authority cited: Sections 18300,18502.5,18551 and 18613,Health and Safety Code. Reference: Sections 18500,
18501,18502,18503,18551 and 18613, Health and Safety Code.
Final Regulations Page 6
Title 25, Chapters 1,2, 2.21, 3,4 and 5.5
EH, MP,SOP,FBH, MH and OL
Chapter 2.Mobilehome Parks and Installations
Article 1. Administration and Enforcement
Amend Section 1020.4.
§ 1020.4. Fees for Accessory Buildings or Structures, and Building Component Permits with.a
Standard Plan Approval.
(a) The following permit fees shall apply for accessory buildings and structures, and building
components that have a standard plan approval:
(1) Inspection fee: One hundred ninety-six dollars ($196) provided the related inspection does not
exceed one hour. When the related inspection exceeds one hour,the following fees-shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty minutes(30),or fractional part thereof:forty-one dollars ($41).
(2) Reinspection fee: One hundred seventy-eight dollars ($178) provided the related reinspection
does not exceed one hour. When the related reinspection exceeds one hour,the following fees shall
apply
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty minutes (30), or fractional part thereof:forty-one dollars ($41).
(b) Fees for accessory buildings and structures, and building components that do not'hive-the
department's standard plan approval issued in accordance with Section 1020.9 of this article,shall be
determined using the valuation table contained in Section 1020.7 of this article.
(c) Electrical, mechanical, and plumbing permit fees for installations in accessory buildings or
structures or building components shall not exceed those contained in this chapter.
(d) Plan check fees shall not be required for accessory buildings or structures for which'a standard plan
approval has been obtained from the department.,
NOTE:Authority cited: Sections 18300,18502.5,and 18552,.Health and Safety Code. Reference: Sections 18300,
18500,18502,18502.5,18503 and 18552,Health and Safety Code.
Final Regulations Page 7
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5
EH, MP,SOP, FBH, MH and OL
u
Chapter 2.Mobilehome Parks and Installations
Article 1. Administration and_Enforcement
Amend Section 1020.7.
§ 1020.7. Permit Fees for Park Construction or Alteration.
(a) Any person submitting an application for a permit to construct with plans not having a department
standard plan approval,shall pay the following fees, as applicable:
(1) Permit Fee. For the.purpose of determining fees, the enforcement agency may establish the
permit fee in accordance with subsection (f) or(g)of this section as appropriate. However, the
minimum permit fee shall be one hundred ninety-six dollars ($196) provided the initial related
inspection associated with this permit does not exceed one hour. When the related inspection exceeds
one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30)i minutes, or fractional part thereof:forty-one dollars ($41).
(2).Plan Check Fee. One-half(1/2)of the combined total of construction, mechanical, plumbing,and
electrical permit fees. However,the minimum fee shall be ten dollars ($10).
(b) Reinspection Fee. One hundred seventy-eight dollars ($178) provided the related inspection does
not exceed one hour. When the related reinspection exceeds one hour,the following fees shall apply:
(1) Second and subsequent whole hours: eighty-two dollars ($82).
(2) Each thirty(30) minutes, or fractional part thereof:forty-one dollars($41).
(c) When any person files applications simultaneously to construct two (2) or more permanent
buildings, or accessory buildings or structures which are identical and are within the same park, only one
plan check fee shall be required.
(d) Electrical, mechanical, and plumbing permit fees shall not exceed those contained in this chapter.
(e) When plans and specifications fail to comply with the requirements of this chapter,the enforcement
agency shall notify the applicant in writing, stating in what respects the plans do not comply. The
applicant shall correct the'plans and/or specifications and resubmit them to the enforcement agency.The
following fees are required for each resubmission of plans or specifications subsequent to the initial plan
check:
(1) Plan Check Fee:Two hundred three dollars($203) provided the related plan check does not
exceed one hour. When the related plan check exceeds one hour,the following shall apply:
(A)Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30)6nutes, or fractional part thereof:forty-six dollars ($46).
(f) Fees for construction or alteration of facilities and installations on lots and within parks shall be the
sum of the following categories comprising the proposed work subject to the minimum amounts specified
in subsection (a)(1):
(1) For each lot......................................... - ..........................................
- • •--................. $5.75
(2) Electrical Permit Fees.
Each park electrical service _ ___ _ _ -__ 14.00
....----•------......•..........................
n o(secondary distribution transformer__. 10.50
Each alteration or r
Each amt substation lkement of a service or a transformer_________________________________ 10.50
Each park lot electrical service equipment____._. 7.00
Each alteration, repair, or replacement of a park lot electrical service equipment______________ 7,00
Each street light including circuit conductors and control equipment -_ 3.00
Final Regulations Page 8
Title 25, Chapters 1,2,2.2,;3,4 and 5.5
EH, MP,SOP, FBH, MH and OL
(3) Plumbing Permit Fees.
Each park sewage drainage system•-••...........................................................................14.00
Each private sewage disposal systemor park water treatment installation_ _ _ _ _ _ 14.00
Each lot drain inlet 7.00
Each alteration or repair of drainage or vent piping________________ 7.00
Each park water distribution system___________________________ _-______.__ 7.00
Each park lot water service outlet or outlets at the same location.......................................4.25
Each fire hydrant or riser 4.25
...............................................................................................
Each individual lot water conditioning installation..............................................................4.25
Each alteration, repair or replacement of water fixtures or equipment____ ____ ......................4.25
(4) Gas Piping Permit Fees.
Each park gas piping system...................................................------......---- .......................7.00
Each installation of a liquefied petroleum or natural
gas tank of 60 gallon capacity or more........................................................_.....................7.00
Each gas riser outlet I _________ 4.25
Each alteration, repair, or replacement of park's gas piping system...................................4.25
(5) Each installation of equipment regulated by this for which no other fee is listed ,_____ 7.00
(g) Permit fees for a permit to construct accessory buildings or structures without a standard plan
approval from the department, and foundation systems, permanent buildings, and/or electrical,
mechanical, and plumbing installations within or on permanent buildings,or accessory buildings or
structures.shall be the sum of the following categories_ comprising the proposed work subject to the
minimum amounts specified in subsection (a)(1):
(1) Table A. Construction Permit Fees.
Total Valuation Fee
$2,000 or less.-----•-•------•--•----•-....----•---- $45:00
$2,001,to$25,000._______._,_______ _ $45.00 for first$2,000 plus$9.00 for each
additional thousand or fraction thereof,to and including$25,000.
$25,001 to$50,000.,_____•_________________________________________________________._ $252.00 for the first$25,000 plus$6.50 for each
additional thousand or fraction thereof,to and including$50,000.
$50,001 to$100,000..
................ - -- - - -
___$414.50 for the first$50,000 plus$4.50 for each
additional thousand or fraction thereof,to and including$100,000.
$100,001 to$500,000______ _ $639.50 for the first$100,000 plus$3.50 for each
--------------------------------------------
additional thousand or fraction thereof,to and including$500,000.
$500,001 to$1,000,000................................... _$2,039.50 for the first$500,000 plus$3.00 for
each additional thousand-or fraction thereof,to and including$1,000,000.
$1,000,001 and up............................. ________________________________ _$3,539.50 for the first$1,000,000 plus$2.00 for
each additional thousand or fraction thereof.
(2) Table B. Mechanical and Plumbing Permit Fees.
Each plumbing fixture, trap, set of fixtures on one trap, including water,
drainage piping and backflow protection therefore...................................................$3.00
Each building sewer___•-_•______ _•_ _-.____,_ 14.00
.......................•--.......-••-•...-----•----••--......_
Each private sewage disposal system............................................................... 14.00
Each water heater and/or vent .. ...........................:...............•---.:......................7.00
Each gas piping system for one to five outlets............................................................7.00
Each gas piping system for six or more outlets, per outlet.........................................1:50
Each gas regulator
1.50
----•-------•------------------- -------------•--•-.--- ---
Each water branch service outlet or.outlets at the same location,
or each fixture supply_______________ 1.00
................................................•-••-••----........_
Final Regulations Page 9
Title 25, Chapters 1,2, 2.2,3,4 and 5.5
EH, MP, SOP, FBH, MH and OL
Each installation of water treating equipment...........................................................7.00
Alteration or repair of water piping or water treating equipment..................................7.00
Alteration or repair of drainage or vent piping...........................................................7.00
Each lawn sprinkler system on any one meter, including backflow
protection devices _______________________7.00
Vacuum breakers or backflow protective devices on
tanks, vats, etc., or for installation on unprotected
plumbing fixtures; one to five..........--•-•-•-•--------•.............................•--......................3.00
over five, each additional 1.00
The installation or relocation of each forced-air or
gravity-type furnace or burner, including ducts and
vents attached to such
appliance, up to and including 100,000 Btu 14.00
The installation or relocation of each forced-air or gravity-type furnace or burner,
including ducts and vents attached to such appliance over 100,000 Btu....................21.00
The installation or relocation of each floor furnace, including vent..............................7.00
The installation or relocation of each suspended heater,
recessed wall heater or'floor-mounted unit heater 7.00
The installation, relocation or replacement of each appliance
vent installed and not included in an appliance permit...............................................7.00
The repair of, alteration of, or addition to each heating appliance, refrigeration
unit,comfort cooling unit, absorption unit,or each comfort heating, cooling,
absorption, or evaporative cooling system,including installation of controls _-14.00
The installation or relocation of each boiler or compressor,to and including three
horsepower or each absorption system to and including 100,000 Btu........................14.00
The installation or relocation of each boiler or compressor over three
horsepower or each absorption system over 100,000 Btu,______________________________________ 21.00
Each air handling unit, including ducts attached thereto________________ ____.___....._-_.....-_7.00
NOTE: This fee shall not apply to an air handling unit which is a portion of a factory-assembled appliance,comfort cooling
unit,evaporative cooler or absorption unit for which a permit is required elsewhere in this chapter.
For each evaporative cooler other than portable type_......................................_........
7.00
For each vent fan connected to a single duct...........................................................3.00
For each vent ventilation system which is not a portion of any heating
or air conditioning system authorized by a permit_______________________ _________7.00
Each installation of equipment regulated by this chapter
for which no other fee is listed 7.00
(3)Table C. Electrical Permit Fees.
Each wiring outlet where current is used or controlled, except services,
sub-feeders and meter outlets 35
Each fixture, socket or other lamp holding device .......................................................35
Each motor of not more than 50 h.p........................................................................4.25
Each motor of more than 50 h.p............................................................................10.50
Each mercury arc lamp and equipment....................................................................1.00
Each range,water heater or clothes dryer installation...............................................7.00
Each space heater or infrared heat installation______ ________ ________ ___ ___ ___________•_...1.50
Final Regulations Page 10
Title 25,Chapters 1,2,2.2, 3,4 and 5.5
EH, MP,SOP, FBH, MH and OL
Each stationary cooking unit, oven, or space heater _____._-•-_ 1.50
Each garbage disposer, dishwasher,or fixed motor-operated
appliance not exceeding 112 h.p.._.... _ _ _ 1.50
• • - - ---------- ---
Working light in buildings in course of construction or-undergoing--- - - ..-
repairs, or where temporary lighting is to be used ..... - - -:- . • _-•_-:3.00
................•--....._.
Each incandescent electric sign...............................................................................1.50
Electric signs or outline lighting, luminous gas type with: 1 to 4 transformers 3.00
Additional transformers, each ....................................................•-------............---.......
Each rectifier and synchronous converter, per K.W.....................................................35
Each additional circuit for a mobilehome accessory building
or structure or other electrical equipment.................................................................1.50
Each service:
600 volts or less, not over 200-amperes..........................................__________________,_______.7.00
600 volts or less, over 200-amperes.........................................................................10.00
Over 600 volts14.00
----------------•---..._.......................................---------.............
_.............
Each installation of equipment regulated by this chapter for
which no other fee is listed .......................................... ......................7.00
NOTE: Authoritycited: Sections 18300,18502.5,and 18552,Health and Safety Code. Reference: Sections 18502,
18502.5,and 18503,Health and Safety Code.
i
Final Regulations Page 11
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5
EH, MP, SOP, FBH, MH and OL
I�
°Chapter 2.Mobilehome Parks and Installations
Article 1.Administration and Enforcement
'Amend Section 1020.9.
§ 1020.9.Application;and Fee Requirements for Accessory Building, Foundations System, or
Engineered Tiedown System Standard Plan Approvals.
(a)A standard plan approval is available from the department for a plan for an accessory building or
structure constructed and installed pursuant to this article and Article 9 of this chapter,for a foundation
system installed pursuant to section 18551 of the Health and Safety Code, and Section 1333(d)of this
chapter, and for an engineered tiedown system designed pursuant to Section 1336.3 of this chapter.
(b) In order to obtain a standard plan approval,the applicant shall submit to the department the
following items:
(1)A completed application for standard plan approval on the form,as defined in Section 1002 of this
chapter, designated by+the department
(2)Three (3)copies of the plans,specifications,and/or installation instructions,and two,(2) copies of
I
he design calculations;when required,to substantiate the design. Specifications shall be shown on
the plan. Design calculations shall be submitted separately from the plan sheet.
(3)An application fee of two hundred three dollars($203)for each plan.
(4) Plan check fee for initial, resubmission,or renewal.Two hundred three dollars ($203) providing
the related plan check does not exceed one hour. Where the related plan check exceeds one hour,the
following fees shall apply:
(A) Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30)S minutes, or fractional part thereof:forty-six dollars ($46).
(5)Additional plan check fees shall be due and payable prior to the issuance of a plan approval or a
revised plan approval,if more than one (1) hour is required to conduct the plan check.
(6)When plans and specifications fail to comply with the requirements of this chapter,the
enforcement agency shall notify the applicant in writing, stating in what respects the plans do not
comply. The applicant shall correct the plans and/or specifications and resubmit them to the
enforcement agency or''withdraw them from consideration,forfeiting all submitted fees.
(7)An identification Label of Approval shall be provided for each accessory building or structure to be
manufactured under the standard plan approval and each accessory building or structure shall have an
approved identification label of approval attached in a visible location.
(8)The actual identification label shall be submitted to the department for approval with the
application for a standard plan approval prior to issuance of the approval. The approved identification
label of approval shall:
(A) be not less in size than 3 inches by one and one-half(1 Y2) inches;
(B) contain the following information as applicable;
Final Regulations
Title 25, Chapters 1,2,2.2,3,4 and 5.5 Page 12
EH, MP,SOP, FBH, MH and 01
ACCESSORY BUILDING OR STRUCTURE I
1..Name of Manufacturer
2. Standard Plan Approval No._
3. Designed for:
_lbs.per square foot roof live load
_lbs.per square foot horizontal wind load
_lbs.per square foot snow load
_lbs,per square foot floor live load
_lbs.per square foot wind uplift load
4. Structure(may)(may not)be enclosed.
Department of Housing and Community Development
(C) be provided by the manufacturer and be permanently imprinted with the information required by
this section;
(9)The identification label of approval shall be either Type I, II, or III as specified in this section,each
capable of a ten-year life expectancy when exposed to ordinary outdoor environments. Letters and
numbers shall be bold Gothic or similar style,varied for emphasis, as large as space permits,with the
minimum size being 5164 inches. Wording shall be easily read and concise. Where permanent type
adhesives are used on Type I, II, or III plates, adhesives shall have a minimum thickness of.004
inches, and the plates shall be affixed to a relatively smooth surface.
(A)Type I. Rigid metal plates affixed by screws, rivets, or permanent type adhesives.
Minimum size: One and one-half(11/2) inches by three (3) inches by .020 inches thick net
dimensions (inside fastener heads).
Material: Aluminum, brass or stainless steel etched, stamped,engraved, or embossed to 0.015
inches minimum depth differential, color anodized or enamel filled.
(B)Type II. Flexible metal plates affixed by permanent adhesives, either pressure sensitive
acrylics or solvent activated resins.
Minimum Size: .005 inches by one and one-half(1,112) inches by three(3) inches.
Material: Aluminum foil etched or stamped to.001 minimum depth-differential with color anodized
background.
(C)Type III. Metallized Mylar(polyester), surface bonded.
Minimum Size: .003 inches by one and one-half(11/2) inches by three (3) inches.
Material: Aluminum/vinyl surface bonded (to be used for nameplates where variable
information is required by embossing, which can be done with a conventional typewriter). Minimum
Size: .006 inches by one and one-half(1 112) inches by three (3) inches.
(c) Plans submitted to the department shall be on sheets of paper no smaller than eight and one-half
(81/2) inches by eleven (11) inches, and no larger than thirty (30) inches by forty-two (42) inches.
(1) Plans shall indicate the details of connections, dimensions,footings,foundations, general notes
and method of installation, necessary for the design and construction of the system.
(2) A plan shall indicate only one model or.type of system.
(3) Each plan sheet shall provide a space not less than three (3) inches by three(3) inches for the
department's standard plan approval stamp and number.
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 13
EH, MP,SOP, FBH, MH and OL
(4) When the design i of the system requires an engineering analysis of structural parts and methods
of construction, such as required for an engineered tiedown system or engineered accessory building
or structure, the plans, specifications, and calculations shall be signed by an architect or engineer.
(5) Each plan shall be identified by a model number.
(d) If an application or plans are incomplete or do not conform to this chapter,the applicant shall be
notified in writing within ten (10)working days of the date they are received by the department. The
applicant shall resubmit a corrected application or plans within ninety(90)days of the notice, or within
ninety(90) days of any subsequent notification relating to a resubmittal, along with the fees required by
Section 1020.9 of this section.
(e) Should the applicant cancel the application for the standard plan approval prior to obtaining
department approval, all fees submitted will be retained by the department for services rendered.
(f)A standard plan approval shall expire twenty-four (24) months from the date of the department's
approval as designated on the department's stamp of approval placed on the plans.
(g)A standard plan approval may be renewed on or before the expiration date by submitting an
application,together with ithree(3) copies of the plan as required by subsections (b)(1)and (2), and a
renewal fee of two hundred three dollars($203).
(1) Renewal of.a standard plan approval is permitted only when the plan submitted is identical to the
plan on file with the department.
(2) Each plan submitted for renewal shall provide a space not less than three (3) inches by three (3)
inches for the department's standard plan approval stamp and number.
(3)When a standard 'plan approval is renewed,the department-issued number shall remain the
same.
(h)An application for approval of revisions to a standard plan approval,which does not change the
structural system or method of the system's construction, and is submitted prior to the approval's
expiration date, shall be submitted with the following documentation:
(1)three(3)copies of the revised plan and specifications;
(2)two(2) copies of the revised design calculations,as required by subsection (b)(2); and
(3)the plan check fee,for the first hour,for each plan.
(i)An applicant with a revised standard plan approval shall submit the following to the department:
(1)an application for a standard plan approval as specified in subsection (b)(1) above;
(2)copies as specified in subsections (h)(1) and (2) above; and
(3) a resubmission fee, as specified in Section 1020.9 above,for each plan.
(j)A revised plan submitted pursuant to Section 1020.9 above, shall be processed as provided by
subsection (h) or subsection (i),depending upon whether or not the changes to the plan are substantive.
A plan submitted after the final expiration shall be processed as a new application with appropriate fees
assessed.
(k) When amendment of applicable laws or the department's regulations requires changes to an
approved plan, the department shall:
(1) notify the applicant of the changes, and
(2)allow the applicant one hundred eighty(180) days from the date of notification to submit a revised
plan for approval or until the expiration date of the standard plan approval, whichever occurs first.
(1)Written approval shall be evidenced by the department's stamp of approval on the plans. The stamp
of approval shall include a unique department-issued standard plan approval identification number for
each approved plan, specification, or installation instruction.
(m) Standard plan approval for each accessory building or structure, foundation system, or engineered
tiedown system is contingent upon compliance with the requirements of this article; The department may
conduct inspections to determine compliance with an approved plan, Violation of any of the provisions of
Final Regulations
Title 25, Chapters 1,2, 2.2, 3,4 and 5.5 Page 14
EH, MP, SOP, FBH, MH and OL
this article or variations from an approved plan shall be cause for cancellation of the standard plan
approval.
(n) Reproductions of an approved plan bearing a department-issued standard plan approval for the
purpose of obtaining a permit to construct a foundation system or accessory building or structure shall be
clear and legible.
(o)When an applicant who has obtained a standard plan approval discontinues the business, has
notified the department, or the department makes'that determination,the standard plan approval shall be
canceled.
(p)The department shall be notified of any change in the name of an applicant or change in name or
ownership of an applicant's business. The department may grant a standard plan approval to the new
owner, if the new owner provides a written certification that the accessory building or structure foundation
system or engineered tiedown system will be constructed in accordance with the existing standard plan
approval and submits the completed form designated by the department,together with a ten dollar ($10)
fee. The certification, application, and fee shall be submitted for each plan with a separate standard plan
approval.
(q) An applicant shall notify the department, in writing, within ten (10)days of any change to their
address. The notification shall be accompanied with a ten dollar ($10) change of address fee.
(r) Plans with.a standard plan approval from the department shall be accepted by the enforcement
agency as approved for the purpose of obtaining a construction permit when the design loads and
allowable soil conditions of specified in the plans are'consistent with the requirements for the locality.
Local enforcement agencies shall not require the original,signature of the architect or engineer on the
standard plan approval.
NOTE:Authority cited: Sections 18300,18502, 18502.5,18551.and 18613.4,Health and Safety Code. Reference:
Sections 18502, 18502.5,18551,18552 and 18613.4, Health and Safety Code.
Final Regulations
Title 25, Chapters 1, 2, 2.2, 3,4 and 5.5 Page 15
EH, MP, SOP, FBH, MH and OL
Chapter 2.Mobilehome Parks and Installations
Article 1.Administration and Enforcement
Amend Section 1025.,
§1025. Earthquake Resistant Bracing System Fees.
(a) Certification application fee,two hundred three dollars($203).
(b) Certification Renewal fee,two hundred three dollars ($203).
(c) Certification review fees .Two hundred three dollars ($203) providing the related certification review
does not exceed one hour. When the related certification review exceeds one hour,the following fees
shall apply:
(1)Second and subsequent whole hours:ninety-two dollars ($92).
(2) Each thirty(30) minutes, or fractional part thereof:forty-six dollars ($46).
The balance of certification review fees due shall be paid to the department prior to the issuance of
certification.
(d)When the department is the enforcement agency:
(1) Inspection or reinspection fee . One hundred ninety-six dollars ($196) provided the related
inspection or reinspection does not exceed one (1)hour.When the related inspection or reinspection
exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours eighty-two dollars ($82).
(B) Each thirty(30) minutes, or fractional part thereof:forty-one dollars ($41).
(2),A minimum fee of one hundred ninety-six dollars($ 196) shall be submitted with each application
for a permit or reinspection. Any additional fees required shall be paid upon completion of the
inspection or reinspection.
(e)Change of ERGS-manufacturer's name,ownership or address fee,sixty-two dollars($62).
NOTE:Authority cited: Sections 18502.5,18613.5 and 18613.7,Health and Safety Code. Reference: Sections 18300,
18502.5, 18613.5 and 18613.7,Health and Safety Code.
Final Regulations
Title 25,Chapters 1,2,2.2 3,4 and 5.5 Page 16
EH, MP,SOP, FBH,MH and OL
Chapter 2.Mobilehome Parks and Installations
i
Amend Title for Article 10.
Article 10.Violations, Complaints, Abatement, and Hearings
Amend Section 1611.
§ 1611. Notice of Violation, Complaints,and Orders to Correct.
(a)(1)Whenever the enforcement agency finds a condition that constitutes a violation of this chapter,.
the Health and Safety Code, or any other applicable provision of law, the enforcement agency shall
provide a written notice to the person or entity responsible for correction of the violation.
(2)The written notice shall state the conditions which constitute the violation including a reference to
the law or regulation being violated, and shall order its abatement or correction within five (5)days after
the date of notice or a longer period of time as allowed by the enforcement agency.
(3) If a unit is in such condition that identification numbers are not available to determine ownership,
the notice shall be given to the owner of the real property, or if located in a park,the owner or operator of
the park.
(4)Whenever the enforcement agency determines a unit, habitable accessory building or structure, or.
permanent building constitutes an imminent hazard representing an immediate risk to the life, health, or
the safety of an occupant,the enforcement agency shall post a notice on the structure, declaring it
uninhabitable.The unit, habitable accessory building or structure, or permanent building shall not be
occupied until deemed safe by the enforcement agency. At the time of the posting, the enforcement
agency shall issue a notice as described in this section to the registered owner.A copy of the notice shall
be issued to the occupant of the unit, or accessory building or structure, or permanent building, if the
occupant is not the registered owner.
NOTE:Authority cited: Sections 18300,18605,18610,18620,18630,18640,18670,18690 and 18691 Health and Safety
Code. Reference:Sections 18300,18402,18404,18500,18550,18605,18610,18620,18630,18640,18670,18690 and
18691,Health and Safety Code.
Final Regulations
Title 25,Chapters 1,2, 2.2, 3,4 and 5.5 Page 17
EH, MP, SOP, FBH, MH and OL
Chapter 2.2. Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2004.5
§2004.5. Complaint Investigations.
(a)When a complaint alleging violations of this Chapter, Chapter 2 or Sections 18200 through 18700
and 18860 through 18874 of the Health and Safety Code is referred to a local enforcement agency,the
agency shall do the following:
(1)Make reasonable efforts to contact the complainant to discuss the complaint. If the issue
addressed within the complaint exceeds the authority or jurisdiction of the enforcement agency,the
complainant shall be so!advised, and shall be directed,when possible, to the appropriate governing
entity. 1
(2) Investigate allegations of violations representing an immediate risk to life, health, or safety within
five(5) days of receipt of the complaint by the agency.
(3) Investigate allegations of violations representing an unreasonable risk to health or safety within
thirty(30) days of receipt by the agency.
(4) Discuss the results of the investigation with the complainant, or provide the results in writing;if
requested by the complainant.
(b)When a complaint is referred to a local enforcement agency from the Office of the Mobilehome
Ombudsman (Office),theiilocal enforcement agency shall, no later than thirty-five (35) days following its
receipt of the complaint, submit a written report detailing the final results of the investigation to the Office,
or its designee.
(c)When an inspection as a result of a health and safety complaint results in a written order to correct
for a violation of this chapter and a reinspection reveals that the cited person failed to correct the
violation, the enforcement agency shall be compensated by the person responsible for correction'of
violation for any subsequent reinspection to verify correction of the violation at the following hourly rate.
(1)one hundred ninety-six dollars ($196) providing the reinspection does not exceed one hour.
When the reinspection exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30)'minutes or fractional part thereof:forty-one dollars ($41).
NOTE:Authority cited:Sections 18153, 18300 and 18865 and, Health and Safety Code. Reference: Sections 18153,
18300,18862.17, 18865,18866,and 18866.5,Health and Safety Code.
Final Regulations
Title 25, Chapters 1,2, 2.2,1:3,4 and 5.5 Page 18
EH,MP,SOP, FBH, MH and OL
i
Chapter 2.2. Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2016.
§2016.Approval of Alternates and Equivalents.
When the department is the enforcement agency,a request for approval of an alternate or,equivalent
means of meeting the requirements of this chapter shall be submitted by the applicant to the
department's Northern or Southern area office. When a city,county, or city and county has assumed
enforcement responsibility for this chapter,the applicant shall submit the request for this approval to the
local enforcement agency."The local enforcement agency shall forward the request to the department's
Administrative Office of the Division of Codes and Standards,along with its written recommendation and
rationale for approval or denial.The request shall be submitted on forms,as defined in Section 2002 of
this chapter, provided by the department.The form shall be accompanied by one(1) set of substantiating
plans and/or information together with the alternate approval fee of two hundred three dollars($203),
payable to the department.
NOTE:Authority cited:Section 18865,Health and Safety Code. Reference:Sections 18865.6 and 18870.3;Health and
Safety Code.
i
Final Regulations
Title 25,Chapters 1,2,2.2,3,4 and 5.5 Page 19
EH, MP,SOP, FBH, MH and OL
10
Chapter 2.2. Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2017.
§2017.Technical Service Fee.
(a) Fees for technical services provided by the enforcement agency shall be:
(1) one hundred ninety-six dollars ($196) provided the technical service does not exceed one hour.
When the technical service exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty (30)minutes, or fractional part thereof: forty-one dollars ($41).
NOTE: Authority cited: Sections 18865 and 18870.3,Health and Safety Code. Reference: Sections 18870.3 and
18870.4, Health and Safety Code.
Final Regulations
Title 25, Chapters 1, 2,2.2, 3,4 and 5.5 Page 20
EH, MP, SOP,FBH, MH and OL
o .
Chapter 2.2. Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2020.4.
§2020.4. Fees for Accessory Structure Permits with a Standard Plan Approval:
(a)The following permit fees shall apply for accessory structures that have a standard plan approval;
(1) Inspection Fee: One hundred ninety-six dollars ($196) provided the inspection does not exceed
one hour. When the inspection exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours eighty-two dollars ($82).
(B) Each thirty(30) minutes, or fractional part thereof:forty-one dollars ($41).
(2) Reinspection Fee: One hundred seventy-eight dollars ($178) provided the reinspection does not
exceed one hour. When the reinspection exceeds one hour,the following fees shall apply:
.(A) Second and subsequent whole hours:, eighty-two dollars ($82).
(B) Each thirty (30) minutes, or fractional part thereof:forty-one dollars($41).
(b) Fees for accessory structures that do not have the department's standard plan approval issued in
accordance with Section 2020.9 of this article shall be determined using the valuation table contained in
Section 2020.7 of this article.
(c) Electrical, mechanical,and plumbing permit fees for installations in accessory structures shall not
exceed those contained in this chapter.
(d) Plan check fees shall not be required for accessory structures for which a standard plan approval
has been obtained from the department.
NOTE: Authority cited: Section 18865,18870.3 and 18871.3,Health and Safety Code. Reference: Sections 18865,
18870;18870.2,18870.3, 18870.4 and 18871.3,Health and Safety Code.
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 21
EH, MP,SOP, FBH, MH and OL
Chapter 2.2. Special Occupancy Parks
Article 1. Administration and Enforcement
Amend Section 2020.7.
§2020.7. Permit Fees,for Park Construction or Alteration.
(a)Any person submitting an application for a permit to construct with plans not having a department
standard plan approval shall pay the following fees,as applicable:
(1) Permit Fee. For the purpose of determining fees, the enforcement agency may establish the
permit fee in accordance with subsection (f) or(g)of this section as appropriate. However, the
minimum permit fee shall be one hundred ninety-six dollars ($196) provided the initial related
inspection associated with this permit does not exceed one hour. When the related inspection exceeds
one hour,the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30),minutes, or fractional part thereof: forty-one dollars ($41).
(2) Plan Check Fee. One-half(1/2) of the combined total of construction, mechanical, plumbing, and
electrical permit fees. However,the minimum fee shall be ten dollars ($10).
(b) Reinspection Fee: ,One hundred seventy-eight dollars ($178) provided the reinspection does not
exceed one hour. When the reinspection exceeds one hour,the following fees shall apply:
(1) Second and subsequent whole hours: eighty-two dollars ($82).
(2) Each thirty(30) minutes, or fractional part thereof:forty-one dollars ($41).
(c) When any person files applications simultaneously to construct two (2) or more permanent
buildings, or accessory buildings or structures which are identical and are within the same park,only one
(1) plan check fee shall be required.
(d) Electrical, mechanical, and plumbing permit fees shall not exceed those contained in this chapter.
(e)When plans and specifications fail to comply with the requirements of this chapter,the enforcement
agency shall notify the applicant in writing, stating in what respects the plans do not comply. The
applicant shall correct the plans and/or specifications and resubmit them to the enforcement agency.
The following fees are required for each resubmission of plans or specifications subsequent to the initial
plan check:
(1) Plan Check Fee. Two hundred three dollars ($203) provided the plan check does not exceed on
hour. When the plan check exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty (30) minutes, or fractional part thereof: forty-six dollars ($46).
(f) Fees for construction or alteration of facilities and installations on lots and within parks shall be the
sum of the following categories comprising the proposed work subject to the minimum amounts specified
in subsection (a)(1):
(1) For each lot.....................................................................................7........................ 5.75
(2) Electrical Permit Fees.
Each park electrical service 14.00
Each unit substation or,secondary distribution transformer................................................10.50
Each alteration or replacement of a service or a transformer..............................................10.50
Each park lot electrical service equipment.....................
•-------.... ----7:00
. ........... ------------------
Each alteration, repair, or replacement of a park lot electrical service equipment.................7.00
Each street light including circuit conductors and control equipment...................................3.00
(3) Plumbing Permit Fees.
Final Regulations
Title 25,Chapters 1, 2, 2.2, 3,4 and 5.5 Page 22
EH, MP,SOP, FBH, MH and OL
o
Each park sewage drainage system14.00
_,- ____:
Each private sewage disposal system or park water treatment installation-,.______,„,,,,,,,,,,,,,14.00
Each lot drain inlet _7.00
Each alteration or repair of drainage or vent piping______________________ _7.00
Each park water distribution system _ _ . _ _ _ ,,. , -„ ........ .-- -_7.00
---------------------- -•- ----
Each park lot water service outlet or outlets at the same location _ 4.25
Each fire hydrant or riser _,_,,,•,-,,,,•-_,_-,-,- „-__,_ , ,,,- .25 4
....................... ................................_
Each individual lot water conditioning installation __4.25
Each alteration, repair or replacement of water fixtures or equipment•_____________________________ 4.25
(4) Gas Piping Permit Fees.
Each-park gas piping system .........................•---............--•---................7.00
Each installation of a liquefied petroleum or natural
gas tank of 60 gallon capacity or more............................................................................7.00
Each gas riser outlet __,__ ...........................................4.25
Each alteration, repair, or replacement of park's gas piping system _, ,•,•,- 4.25
(5) Each installation of equipment regulated by this chapter for which no other fee is listed _ ,_- 7.00
(g) Permit fees for a permit to construct accessory buildings or structures without a standard plan
approval from the department, and foundation systems, permanent buildings,and/or electrical,
mechanical, and plumbing installations within or on permanent buildings,or accessory buildings or
structures shall be the sum of the following categories comprising the proposed work subject to the
minimum amounts specified in subsection (a)(1):
(1)Table A..Construction Permit Fees.
Total Valuation Fee
$2,000 or less. _ „,$45.00
$2,001 to$25,000. :$45.00 for the first$2,000 plus$9.00 for each
additional thousand or fraction thereof,to and including$25,000.
$25,001 to$50,000._____________________________ - - - ____ -__$252.00 for the first$25,000 plus$6.50 for each
�`
additional thousand or fraction thereof,to and including 50 000.
$50,001 to$100,000.
..............................................................$414.50 for the first$50,000 plus$4.50 for each additional thousand or fraction thereof,to and including$100,000.
$100,001 to$500,000...............................................................$639.50 for the first$100,000 plus$3.50 for each
additional thousand or fraction thereof,to and including$500,000.
$500,001 to$1,000,000.__________ - - ..........................$2,039.50 for.the first$500,000 plus$3.00 for
each additional thousand or fraction thereof,to and including$1,000,000.
$1,000,001 and up...................................................................$3,539.50 for the first$1,000,000 plus$2.00 for
each additional thousand or fraction thereof.
(2)Table B. Mechanical and Plumbing Permit Fees.
Each plumbing fixture, trap, set of fixtures on one trap, including water,
drainage piping and backflow protection therefore $3.00
Each building sewer.........................................................•---_------------......---.....-----14.00
Each private sewage disposal system....................................................................14.00
Each water heater and/or vent7.00
.....-•................•-•------....-•---........---............-••-------.--...
Each gas piping system for one to five outlets 7.00
Each gas piping system for six or more outlets, per outlet......................................................................••---.1.50
Each gas regulator........................................... 1.50
...................... ............................
Each water branch service outlet or outlets at the same location,
oreach fixture supply.................--------- ----------•---._........---.......-----........---....•----•...1.00
Each installation of water treating equipment________________ 7.00
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 23
EH, MP, SOP, FBH, MH and OIL
,
Alteration or repair of water piping or water treating equipment..................................7.00
rains a or vent piping 7.00
P 9 P P 9............................. ......... ..................
Iteration or repair of d
Each lawn sprinkler system on any one meter, including backflow
protectiondevices ........................................................... . ...............:......7.00
Vacuum breakers or backflow protective devices on
tanks,vats, etc., or for installation on unprotected
plumbing fixtures: one to five...........................................•-----........._.......................3.00
over five, each additional...............................................
.........
.................
..........•----1.00
The installation or relocation of each forced-air or
gravity-type furnace or burner, including ducts and
vents attached to such appliance, up to and including 100,000 Btu 14.00
The installation or relocation of each forced-air or gravity-type furnace or burner,
including ducts and vents attached to such appliance over 100,000 Btu....................21.00
The installation or relocation of each floor furnace, including vent...............................7.00
The installation or relocation of each suspended heater,
recessed wall heater or floor-mounted unit heater • ---•- - -- - -• --• . -• _ 7.00
The installation,relocation or replacement of each appliance
vent installed and not included in an appliance permit• •- - 7.00
The repair of, alteration;of, or addition to each heating appliance, refrigeration
unit,comfort cooling unit, absorption unit, or each comfort heating,cooling,
absorption, or evaporative cooling system, including installation of controls _ - 14.00
The installation or relocation of each boiler or compressor to and including three
horsepower or eachh aabb'
I
The installation or sorption system to and including 100,000 Btu _ 14.00
relocation of each boiler or compressor over three
horsepower or each absorption system over 100,000 Btu•- -. _ ••- •- -- -- 21.00
Each air handling unit, including ducts attached thereto --- -- - 7.00
NOTE: This fee shall not apply to an air handling unit which is a portion of a factory-assembled appliance,comfort cooling
unit,evaporative cooler or absorption unit for which a permit is required elsewhere in this chapter.
For each evaporative cooler other than portable type,...............................................7.00
For each vent fan connected to a single duct•----- ---- _ • -------------- • 3.00
For each vent ventilation system which is nota portion of any heating
or air conditioning system.authorized by a permit................................. 7.00
Each installation of equipment regulated by this chapter
for which no other fee is listed,.................................................................................7.00
(3)Table C. Electrical Permit Fees.
Each wiring outlet where current is used or controlled, except services,
sub-feeders and meter outlets-----------------•---......----•-•-----......---------------•......-----------.....35
Each fixture, socket or other lamp holding device........................................................35
Each motor of not more than 50 h,p........................................................................4.25
Each motor of more than 50 h.p.......................................................................•....10.50
Each mercury arc lamp;and equipment-- - .... ...e............................1.00
Each range,water heater or clothes dryer installation 7.00
Each space heater or infrared heat installation----------
1.50
Each stationary cooking unit, oven, or space heater 1.50
Final Regulations
Title 25, Chapters 1, 2,2.2, 3,4 and 5.5 Page 24
EH, MP, SOP, FBH, MH and OL
o
Each garbage disposer, dishwasher, or fixed motor-operated
appliance not exceeding 112 h.p. ....1.50
Working light in buildings in course of construction.......................................................
r undergoing
repairs, or where temporary lighting is to be used.....................................................3.00
Each incandescent electric sign ...............................................................1.50
Electric signs or outline lighting, luminous gas type with: 1 to 4 transformers 3.00
Additional transformers, each ...................................................................................35
Each rectifier and synchronous converter, per K.W..__;;
Each additional circuit for a mobilehome accessory building
or structure or other electrical equipment ___...1.50
Each service:
600 volts or less, not over 200-amperes _•..................•_...._...._.._.................._7.00
600 volts or less, over 200-amperes .....................................10.00
Over 600 volts ......... ...... .....................14.00
Each installation of equipment regulated by this chapter for
which no other fee is listed .-• -_•.. . ----.7,00
NOTE:Authority cited: Sections 18865,18870.3 and 18871.3, Health and Safety Code. Reference:Sections 18870.2,
18870.3 and 18870.4,Health and Safety Code.
p
Final Regulations
Title 25, Chapters 1,2,2.2, 3,4 and 5.5 Page 25
EH; MP,SOP, FBH, MH and OL
Chapter 2.2. Special Occupancy Parks
Article 1.Administration and Enforcement
Amend Section 2020.9.
§2020.9. Application and.Fee Requirements for Standard Plan Approvals.
(a)A standard plan approval is available from the department for a plan for an accessory structure
constructed and installed'pursuant to this article and Article 9 of this chapter
(b) In order to obtain a standard plan approval,the applicant shall submit to the department the
following items:
(1)A completed application for standard plan approval on the form, as defined in Section 2002 of this
chapter, designated by the department
(2)Three (3) copies of the plans,specifications, and/or installation instructions, if applicable, and two
(2)copies of the desigrn,calculations,when required, to substantiate the design. Specifications shall be
shown on the plan. Design calculations shall be submitted separately from the plan sheet.
(3)An application fee'of two hundred three dollars ($203)for each plan.
(4) Plan check fee. Two hundred three dollars ($203) provided the plan check does not exceed one
hour. When,the plan check exceeds one hour the following fees shall apply:
(A) Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30)',;minutes, or fractional part thereof:forty-six dollars ($46).
(5)Additional plan check fees shall be due and payable prior to the issuance of a plan approval or a
revised plan approval, if more than one (1)hour is required to conduct the plan check.
(6)When plans and specifications fail to comply with the requirements of this chapter,the
enforcement agency shall notify the applicant in writing, stating in what respects the plans do not
comply. The applicant shall correct the plans and/or specifications and resubmit them to the
enforcement agency or withdraw them from consideration,forfeiting all submittedfees.
(7)An Identification Label of Approval shall be provided for each accessory building or structure to be
manufactured under the standard plan approval, and each accessory building or structure shall have
an approved identification label of approval attached in a visible location.
(8)The actual identification label shall be submitted to the department for approval with the
application for a standard plan approval prior to issuance of the approval.The approved identification
label of approval shall:
(A)be not less in size than three (3) inches by one and one-half(1'/2) inches;
(B)contain the following information, as applicable;
Final Regulations
Title 25,Chapters 1,2, 2.2, 3,4 and 5.5 Page 26
EH, MP,SOP, FBH, MH and OL
o
ACCESSORY BUILDING OR STRUCTURE
f .
1. Name of Manufacturer
2. Standard Plan Approval No.
3. Designed for:
_lbs.per square foot roof live load
_lbs.per square foot horizontal wind load
_lbs.per square foot snow load
_lbs.per square foot floor live load
_lbs.per square foot wind uplift load
4. Structure(may)(may not)be enclosed.
Department of Housing and Community Development
(C) be provided by the manufacturer and be permanently imprinted with the information required by
this section;
(9)The identification label of approval shall be either Type I, II, or III as specified in this section, each
capable of a ten year life expectancy when exposed to ordinary outdoor environments. Letters and
numbers shall be bold'Gothic or similar style, varied for emphasis, as large as space permits, with the
minimum size being 5/64 inch. Wording shall be easily read and concise. Where permanent type
adhesives are used on Type I, II, or III plates, adhesives shall have a minimum thickness of.004 inches
and the plates shall be affixed to a relatively smooth surface.
(A)Type I, Rigid metal plates affixed by screws,rivets, or permanent type adhesives,
Minimum size: one and one-half(11/2 inches by three(3) inches by.020 inches thick net
dimensions (inside fastener heads).
Material: Aluminum, brass or stainless steel etched, stamped,engraved, or embossed to 0.015-
inch minimum depth differential, color anodized or enamel filled.
(B) Type II. Flexible metal plates affixed by permanent adhesives, either pressuresensitive
acrylics or solvent activated resins.
Minimum Size: .005 inch by one and one-half(11/2) inches by three (3) inches.
Material: Aluminum foil etched or stamped to.001 inches minimum depth differential with color
anodized background.
(C) Type III. Metallized Mylar(polyester), surface bonded.
Minimum Size: .003 inches by one and one-half(1'/2) inches by three (3) inches.
Material: Aluminum/vinyl surface bonded (to be used for nameplates where variable information is
required by embossing,which can be done with a conventional typewriter),
Minimum Size: .006 inches by one and one-half(1.1/2) inches by three (3) inches.
(c) Plans submitted to the department shall be on sheets of paper no smaller than eight and one-half(8
1/2) inches by eleven (11) inches, and no larger than thirty(30) inches by forty-two(42) inches.
(1) Plans shall indicate the details of connections, dimensions, footings, foundations, general notes
and method of installation necessary for the design and construction of the system.
(2) A plan shall indicate only one model or type of system.
(3) Each plan sheet shall provide a space not less than three (3) inches by three (3) inches for the
department's standard plan approval stamp and number.
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 27
EH, MP, SOP, Fl3H, MH and OL
(4)When the design of the system requires an engineering analysis of structural parts and methods
of construction,such as required for an engineered tiedown system or engineered accessory building
or structure, the plans,specifications,and calculations shall be signed by an architect or engineer.
(5) Each plan shall be identified by a model number.
(d) If an application or plans are incomplete or do not conform to this chapter,the applicant shall be
notified in writing within ten.(10) working days of the date they are received by the department. The
applicant shall resubmit a corrected application or plans within ninety (90) days of the notice, or within
ninety(90) days of any subsequent notification relating to a resubmittal, along with the fees required by
Section 2020.9 of this section.
(e) Should the applicant cancel the application for the standard plan approval prior to obtaining
department approval, all fees submitted will be retained by the department for services rendered.
(f) A standard plan approval shall expire twenty-four (24)months from the date of the department's
approval as designated on the department's stamp of approval placed on the plans.
(g)A standard pian approval may be renewed on or before the expiration date by submitting an
application,together with three (3) copies of the plan as required by subsections (b) (1)and (2), and a
renewal fee of (two hundred three dollars ($203).
(1) Renewal of a standard plan approval is permitted only when the plan submitted is identical to the
plan on file with the'department.
(2) Each plan submitted for renewal shall provide a space not less than three(3) inches by three(3)
inches for the department's standard plan approval stamp and.number.
(3) When a standard plan approval is renewed,the department-issued number shall remain the
same.
(h)An application for approval of revisions to a standard plan approval, which does not change the
structural system or method of the system's construction,and is submitted prior to the approval's
expiration date,shall be submitted with the following documentation:
(1)three(3)copies of the revised plan and specifications;
(2)two (2) copies of the revised design calculations, as required by subsection(b) (2); and(3)the
plan check fee,for the first hour,for each plan.
(i)An applicant with a revised standard plan approval shall submit the following to the department:
(1)an application for a standard plan approval as specified in subsection (b) (1)above;
(2)copies as specified in subsections(h) (1)and(2) above; and
(3)a resubmission fee,as specified in Section 2020.9 above,for each plan.
0)A revised plan submitted pursuant to Section 2020.9 above,shall be processed as provided by
subsection (h) or subsection(i), depending upon whether or not the changes to the plan are substantive.
A plan submitted after the final expiration shall be processed as a new application with appropriate fees
assessed.
(k) When amendment of applicable laws or the department's regulations requires changes to an
approved plan, the department shall:
(1)notify the applicant of the changes, and
(2)allow the applicant one hundred eighty(180) days from the date of notification to submit a revised
plan for approval or until the expiration date of the standard pian approval, whichever occurs first.
(1)Written approval shall be evidenced by the department's stamp of approval on the plans. The stamp
of approval shall include a unique department-issued standard plan approval identification number for
each approved plan, specification, or installation instruction.
(m) Standard plan approval for each accessory building or structure,foundation system, or engineered
tiedown system is contingent upon compliance with the requirements of this article. The department may
conduct inspections to determine compliance with an approved plan. Violation of any of the provisions of
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 28
EH, MP,SOP, FBH, MH and OL
this article or variations from an approved plan shall be cause for cancellation of the standard plan
approval.
(n) Reproductions of an approved plan bearing a department-issued standard plan approval for the
purpose of obtaining a permit to construct a foundation system or accessory building or structure shall be
clear and legible.
(o)When an applicant who has obtained a standard plan approval,discontinues the business, has
notified the department, or the department makes that determination,the standard plan approval shall be
canceled.
(p)The department shall be notified of any change in the name of an applicant or change in name or
ownership of an applicant's business. The department may grant a standard plan approval to the new
owner,if the new owner provides a written certification that the accessory building or structure foundation
system or engineered tiedown system will be constructed in accordance with the existing standard plan -
approval and submits the completed form designated by the department,together with a ten dollar ($10)
fee. The certification, application, and fee shall be submitted for each plan with a separate standard plan
approval.
(q)An applicant shall notify the department, in writing, within ten days of any change to their address.
The notification shall be accompanied with a ten dollar ($10) change of address fee.
(r) Plans with a standard plan approval from the department shall be accepted by the enforcement
agency as approved for the purpose of obtaining a construction permit if when the design loads and
allowable soil conditions specified in the,plans are consistent with the requirements for the locality. Local
enforcement agencies shall not require the original signature of the architect or engineer on the standard
plan approval.
NOTE:Authority cited: Sections 18865, 18870.2 and 18870.3,Health and Safety Code. Reference:Sections 18870.3,
18871.2 and 18871.3, Health and Safety Code.
Final Regulations
Title 25,Chapters 1, 2, 2.2, 3,4 and 5.5 Page 29 ,
EH, MP,SOP, FBH, MH and OL
1
Chapter 2.2.Special Occupancy Parks
Amend Title for Article 10.
Article 10.Violations,Complaints,Abatement,and Hearings
Amend Section 2611.
§2611. Notice of Violation, Complaints, and Orders to Correct.
(a)(1)Whenever the enforcement agency finds a condition that constitutes a violation of this chapter,
the Health and Safety Code, or any other applicable provision of law,the enforcement agency shall
provide a written notice to the person or entity responsible for correction of the violation.
(2)The written notice,shall state the conditions which constitute the violation including a reference to
the law or regulation being violated, and shall order its abatement or correction within five(5) days after
the date of notice or a longer period of time as allowed by the enforcement agency.
(3) If a unit is in such condition that identification numbers are not available to determine ownership,
the notice shall be given to the owner of the real property, or if located in a park,the owner or operator
of the park.
(4)Whenever the enforcement agency determines a unit,habitable accessory building or structure,
or permanent building constitutes an imminent hazard representing an immediate risk to the life, health,
or the safety of an occupant,the enforcement agency shall post a notice on the structure, declaring it
uninhabitable.The unit, habitable accessory building or structure,or permanent building shall not be
occupied until deemed safe by the enforcement agency. At the time of the posting,the enforcement
agency shall issue a notice as described in this section. A copy of the notice shall be issued to the
occupant of the unit, accessory building or structure, or permanent building, if different from the
registered owner.
NOTE:Authority cited:Sections 18865,Health and Safety Code.Reference: Sections 18866.3,18866.5,18871.10 and
18872,Health and Safety Code.
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 30
EH, MP,SOP, FBH, MH and Ot.
I O
Chapter 3. Factory-Built Housing and Mobile Homes
Subchapter 1.Factory-Built Housing
Article 4. Fees
Amend Section 3060.
§ 3060. Fees.
(a) Plan Fees.
(1) Plan Filing Fees.
(A) Sixty dollars ($60)for each new model
(B)Twenty dollars($20)for each individually submitted change to an approved plan.
(2) Plan Checking Fee Deposit.
(A)Three hundred dollars ($300) for each new model.
(B) One.hundred fifty dollars($150)for each building component model.
(C)The department may require a plan checking fee deposit not exceeding three hundred dollars
($300) for changes to approved plans.. The plan checking fee deposit less actual costs as
determined by the department shall be refundable.
(3) Plan Checking Fees.Two hundred three dollars ($203) provided the plan check does not exceed
one hour. When the plan check exceeds one hour,the following fees shall apply:
(A) Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty (30) minutes,or fractional part thereof: forty-six dollars($46).
(4) Plan Renewal Fee. Sixty dollars ($60) for plan renewal for each model.
(5) Plan Renewal Plan Checking Fees.Two hundred three dollars($203) provided the plan renewal
plan check does not exceed one hour. When the plan renewal plan check exceeds one hour, the
following fees shall apply:
(A)Second and subsequent whole hours: ninety-two dollars($92).
(B) Each thirty(30) minutes, or fractional part thereof: forty-six dollars($46).
(b) Quality Control Manual. Twenty dollars ($20)for each individually submitted change to an
approved quality control manual.
(c) Inspection and Technical Service Fees.
(1) One hundred ninety-six dollars ($196) provided the inspection, or technical service does not
exceed one hour. When the inspection, monitoring, or technical services exceeds one hour, the
following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars($82).
(B) Each thirty(30) minutes, or fractional part thereof: forty-one dollars ($41).
(d) Out-of-State Inspection and Technical Service Fees. Fees shall be in accordance with subsection
(c) plus total travel cost based on published air fare, or equivalent rate, between the point of departure
in California and the point of inspection, plus necessary supplemental surface transportation,and
reimbursement for food and lodging consistent with California State Department of Personnel
Administration.
(e) Periodic Monitoring Inspection Fees. Periodic monitoring inspection fees shall be paid for
inspection time and required travel time from the point of departure in California, in accordance with
subsection (c). If reinspections are necessary as a result of a periodic monitoring inspection,the
reinspection and travel time from the point of departure in California shall be paid in accordance with
Final Regulations
Title 25,Chapters 1, 2,2.2, 3,4 and 5.5 Page 31
EH; MP,SOP, Fl3H, MH and OL
subsection (c). Out-of-state travel costs for periodic monitoring inspections and reinspections shall be
paid in accordance with subsection (d).
(f)'Insignia Fees.
(1) Sixty-two dollars ($62)for each insignia, excepting building components.
(2) Five dollars ($5)for each individual building component.
(3) Sixty-two dollars ($62)for replacement insignia.
(g) Reciprocal Insignia Fees.
(1) Insignia fees for units manufactured in California shall be as specified in subsection (f).
(2)Two dollars ($2) for each single family dwelling unit, dwelling unit, individual dwelling room or
combination of rooms thereof, shipped from another state under reciprocal agreement.
(3)Ten cents ($.10) for each individual building component.
(h) Out-of-State Approval Fee. Initial plant inspection fee shall be in accordance with subsection (c)
and travel cost based on published air fare, or equivalent rate, between the point of departure in
California and the location,of the factory plus necessary supplemental surface transportation, and
reimbursement for food and lodging consistent with California State Department of Personnel
Administration.
(i) Change in Manufacturer Name, Ownership,or Address Fee. Sixty-two dollars ($62).
0) Certification Fee-Quality Assurance Agency. Three hundred twenty-eight dollars ($328)for each
certification application.
(k) Quality Approval Agency Renewal. Two hundred eighty-six dollars ($286)for each renewal
application.
(1) Certification fee-Quality Assurance Inspector. Eight hundred sixty-six dollars ($866)for each
person making request for certification. I
-
(m) Quality Assurance Inspector Renewal. Two hundred fifty-three dollars($253) for each renewal
application.
(n) Certification Fee-Design Approval Agency. Three hundred twenty-eight dollars ($328)for each
certification application.
(o) Design Approval Agency Renewal. Two hundred eighty-six dollars ($286)for each renewal
application.
(p) Design Approval Agency Monitoring Fee.
(1) Forty-two dollars ($42)for each approved plan or plan renewal.
(2) Nineteen dollars ($19) for each amendment to previously approved plans or manuals.
(3)Twenty dollars ($20) for each approved quality control manual.
(q)Alternate Approval. Two hundred three dollars($203) provided the plan renewal plan check does
not exceed one hour. When the plan renewal plan check exceeds one hour, the following fees shall
apply:
(1)Second and subsequent whole hours: ninety-two dollars ($92).(2) Each thirty(30) minutes, or
fractional part thereof: forty-six dollars ($46).
(r)Alternate Approval Plan Review. Two hundred three dollars ($203)for each hour.
NOTE:Authority cited: Sections,,19982 and 19990, Health and Safety Code. Reference:Sections 19982 and 19990,
Health and Safety Code.
Final Regulations
Title 25,Chapters 1,2, 2.2, 3,4 and 5.5 Page 32
EH, MP,SOP, FBH,.MH and OL .
Chapter 3. Factory-Built Housing and Mobilehomes
r"
Subchapter 2. Manufactured Homes, Mobilehomes,Multi-Unit Manufactured Housing,
Commercial Modulars,and Special Purpose Commercial Modulars
Article 1.Administration
Amend Section 4044.
§4044. Fees.
(a) Plan Fees.
(1) Plan Checking Fee. Two hundred three dollars ($203) provided the plan check does not exceed
one hour. When the plan check exceeds one hour,the following fees shall apply:
(A)Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30) minutes, or fractional part thereof: forty-six dollars ($46).
(2) Plan Resubmission Fee. Two hundred three dollars ($203)provided the plan resubmission plan
check does not exceed one hour. When the plan resubmission plan check exceeds one hour, the
following fees shall apply:
(A)Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30) minutes, or fractional part thereof: forty-six dollars ($46).
(3) Plan Supplement Fee. Two hundred three dollars ($203) provided the plan supplement plan
check does not exceed one hour. When the plan supplement plan check exceeds one hour, the
following fees shall apply:
(A) Second and subsequent whole hours: ninety-two dollars ($92).
(B) Each thirty(30) minutes, or fractional part thereof: forty-six dollars ($46).
(4) Plan Renewal Fee. Two hundred three dollars ($203) for each plan or group of plans.
(b) Quality Control Manual Filing Fee. Ten dollars($10).
(c) Inspection, Reinspection, or Monitoring Fees:
(1) Manufactured Home, Mobilehome, Multi-Unit Manufactured Housing, Commercial Modular and
Special Purpose Commercial Modular Manufacturer Monitoring. One hundred ninety-six dollars ($196)
provided the in-plant monitoring does not exceed one hour.When the in-plant monitoring exceeds one
hour, the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty (30) minutes, or fractional part thereof: forty-one dollars($41).
(2) Inspection Fees. One hundred ninety-six dollars ($196) provided the inspection or reinspection
does not exceed one hour. When the inspection or reinspection exceeds one hour,the following fees
shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30) minutes,or fractional part thereof: forty-one dollars ($41).
(d)Technical Service Fees.
(1) One hundred ninety-six dollars ($196) provided the technical service does not exceed one hour.
When the technical service exceeds one hour, the following fees shall apply:
(A) Second and subsequent whole hours: eighty-two dollars ($82).
(B) Each thirty(30) minutes, or fractional part thereof: forty-one dollars($41).
(e) Alternate Approval Fees. Two hundred three dollars ($203) forthe plan check fee for a minimum of
one hour as established in Section 4008.
(f) Administrative Handling Fees for Federal Labels.
Final Regulations
Title 25, Chapters 1,2,2.2, 3,4 and 5.5 Page 33
EH, MP,SOP, FBH, MH and OL
(1) Six dollars ($6.00)for each new manufactured home label, issued to cover the costs of postage,
handling and administration.
(g) Insignia Fees.
(1) Fifty-one dollars ($51) for each manufactured home, mobilehome, multi-unit manufactured
housing, commercial modular,or special purpose commercial modular insignia.
(2) Eighty-three dollars($83)for each department replacement insignia.
(h) Requested Out-of-State Inspection or Technical Service Fee. Total travel cost based on published
air fare, or equivalent rate, between the point of departure from California and the point of inspection,
plus necessary supplemental surface transportation, reimbursement for food and lodging consistent with
California State Department of Personnel Administration allowances and inspection or technical service
fees as specified in this section.
(i) Change in Manufacturer Name, Ownership or Address Fee. Sixty-two dollars ($62).
0) Component Label Fee. Twenty-four dollars ($24).
NOTE: Authority cited: Section 18015 and 18031, Health and Safety Code. Reference: Section 18031, Health and Safety
Code.
Final Regulations
Title 25, Chapters 1,2,2.2, 3, 4 and 5.5 Page 34
EH, MP,SOP, FBH, MH and OL
Chapter 3. Factory-Built Housing and Mobile Homes
Subchapter 2. Manufactured Homes, Mobilehomes, Multi-Unit Manufactured Housing,
Commercial Modulars,and Special Purpose Commercial Modulars
Article 5.Third-Party Approval and Enforcement
Amend Section 4884.
§4884. Fees.
(a) Application for Design Approval Agency Approval: Three hundred forty-nine dollars($349)
(b)Application for Quality Assurance Agency Approval: Three hundred forty-nine dollars ($349)
(c)Application for Quality Assurance Inspector: Two hundred ninety-five dollars'($295)
(d) Application for Design Approval Agency Approval Renewal:Three hundred two dollars($302),
(e)Application for Quality Assurance Agency Approval Renewal: Three hundred two dollars($302)
(f)Application for Quality Assurance Inspector Approval Renewal:Two hundred sixty-seven dollars
($267)
(g) Change of Third-Party Name, or Address: Sixty-two dollars ($62)
(h) Change of Quality Assurance Inspector Name or Address: Sixty-two dollars($62)
(i) Plan Approval Monitoring:
(1) for pians relating to a manufactured home, mobilehome, multi-unit manufactured housing or
commercial modular: Forty-four dollars ($44); and
(2)for plans relating to a special purpose commercial modular: Forty-four dollars ($44).
(j) Plan Approval Monitoring,for Quality Control Manuals: Forty-two dollars($42)
(k) Plan Approval Monitoring,for Amendments to Approved Plans or Manuals: Thirty dollars($30).
NOTE: Authority cited:Section 18020,Health and Safety Code.Reference:Section 18031,Health and Safety Code.
Final Regulations
Title 25, Chapters.1, 2,2.2, 3,4 and 5.5 Page 35
EH, MP, SOP, FBH, MH and OL