Loading...
HomeMy WebLinkAboutMINUTES - 05092006 - C.67 TO: BOARD OF SUPERVISORS t'E—SE�L—=�� C� Contra FROM: MAURICE M. SHIU, PUBLIC WORKS Costa DIRECTOR `' DATE: May 9, 2006 '''A Ca� County oP SUBJECT: Continue the emergency action originally taken by the Board of Supervisors on March 21, 2006, regarding the repairiof storm damage to roads and channels, Countywide. SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION i RECOMMENDED ACTION: i CONTINUE the emergency action originally taken by the Board of Supervisors on March 21, 2006, pursuant to Public Contract Code Sections 22035 and 22050, to repair storm damage to roads and channels, Countywide. i I i i I CONTINUED ON ATTACHMENT: I] SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECO M ATION OF BOARD COMMITTEE APPROVE OTHER r SIGNATURE(S)::)� tJ ACTION OF BO®RONCO S/O l &U APPROVED AS RECOMMENDED X OTHER — T i —T— VOTE OF SUPERVISORS: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED UNANIMOUS(ABSENT ) ON MINUTES OF THE BOARD OF SUPERVISORS ON THE AYES: NOES: DATE SHOWN. ABSENT: ABSTAIN: JY: C:\Documents and Settingsywaters\Local Settings\Temporary Internet ATTESTED Files\OLK10D\BO 04-25-06 Continue Emergency-Storm Damage.docJOHN iJ�LLENTT,CLERK OF THE BOARD OF ,S ERVISORS Contact: Joe Yee(313-7002) 4 Orig.Dept.: Public Works Dept. cc: P.McNamee,Public Works Deputy Director M.Hollingsworth,Design BY: , UTY i I t ^' SUBJECT: Continue the emergency action originally taken by I he Board of Supervisors on March 21, 2006, regarding the repair of storm damage to roads and channels, Countywide. DATE: May 9, 2006 PAGE: 2 of 2 FISCAL IMPACT: No impact on the General Fund. The repair projects will be covered by County road funds and Federal Highway Administration funding. REASONS FOR RECOMMENDATIO IINS AND BACKGROUND: As a result of a strong storm on December 31, 2005 and heavy storm runoff, severe erosion has occurred in channels and banks. Along Alhambra Valley Road at guardrails #10 and 11, storm-caused erosion has already started to undercut the lane of pavement closest to the adjacent creek. To protect public safety at both locations, the road was closed down to one lane and concrete barriers installed. CONSEQUENCES OF NEGATIVE ACTION: If the request is not approved, the necessary repairs would likely be delayed, potentially compromising public safety, interfering with public traffic, and resulting in more extensive damage and increased repair cost. I I