Loading...
HomeMy WebLinkAboutMINUTES - 05232006 - C.78 TO: BOARD OF SUPERVISORS _� SEL Contra FROM: MAURICE M. SHIU, PUBLIC WORKS g �� ;4��.w, ;.^ 4 Costa DIRECTOR �- 17 . OO T9 COO 'cAv` DATE: May 23, 2006 s ------ County SUBJECT: Continue the emergency action originally taken by the Board of Supervisors on March 21, 2006, regarding the repair of storm damage to roads and channels, Countywide. SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: CONTINUE the emergency action originally taken by the Board of Supervisors on March 21, 2006, pursuant to Public Contract Code Sections 22035 and 22050, to repair storm damage to roads and channels, Countywide. CONTINUED ON ATTACHMENT: ❑x SIGNA RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF RD COMMITTEE APPROVE OTHER SIGNATURE(S): J� ACTION OF BOA D N ,�?:Z�j PPROVED AS RECOMMENDED VOTE OF SUPERVISORS: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED UNANIMOUS(ABSENT ) ON MINUTES OF THE BOARD OF SUPERVISORS ON THE AYES: NOES: DATE SHOWN. ABSENT: ABSTAIN: JY: C:\Documents and Settingsywaters\Local Settings\Temporary Internet ATTESTED Files\OLK10D\BO 04-25-06 Continue Emergency-Storm Damage(2).doc HN CUL CLERK OF THE BOARD OF SUPERVISORS Contact: Joe Yee(313-7002) Orig.Dept.: Public Works Dept. cc: P.McNamee,Public Works Deputy Director M.Hollingsworth,Design BY: DEPUTY SUBJECT: Continue the emergency action originally taken by the Board of Supervisors on March 21, 2006, regarding the repair of storm damage to roads and channels, Countywide. DATE: May 23, 2006 PAGE: 2 of 2 FISCAL IMPACT: No impact on the General Fund. The repair projects will be covered by County road funds and Federal Highway Administration funding. REASONS FOR RECOMMENDATIONS AND BACKGROUND: As a result of a strong storm on December 31, 2005 and heavy storm runoff, severe erosion has occurred in channels and banks. Along Alhambra Valley Road at guardrails #10 and 11, storm-caused erosion has already started to undercut the lane of pavement closest to the adjacent creek. To protect public safety at both locations, the road was closed down to one lane and concrete barriers installed. CONSEQUENCES OF NEGATIVE ACTION: If the request is not approved, the necessary repairs would likely be delayed, potentially compromising public safety, interfering with public traffic, and resulting in more extensive damage and increased repair cost. sE_L TO: BOARD OF SUPERVISORS Contra��'-- �_-=��' `fes FROM: MAURICE M. SHIU, PUBLIC WORKS Costa DIRECTOR .oa titin DATE: May 23, 2006 sra cooN`t'{ County SUBJECT: Continue the emergency action originally taken by the Board of Supervisors on March 21, 2006, regarding the repair of storm damage to roads and channels, Countywide. SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: CONTINUE the emergency action originally taken by the Board of Supervisors on March 21, 2006, pursuant to Public Contract Code Sections 22035 and 22050, to repair storm damage to roads and channels, Countywide. 1 L 4d CONTINUED ON ATTACHMENT: 0 SIGNATU /L RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF faRD COMMITTEE APPROVE OTHER SI GNATURE(S): ACTION OF BOARD ON -2ex�< APPROVED AS RECOMMENDED _�_op+ER— VOTE OF SUPERVISORS: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED UNANIMOUS(ABSENT ) ON MINUTES OF THE BOARD OF SUPERVISORS ON THE AYES: NOES: DATE SHOWN. ABSENT: ABSTAIN: JY: C:\Documents and Settings\waters\Local Settings\Temporary Internet ATTESTED '-2a i Files\OLK10D\BO 04-25-06 Continue Emergency-Storm Damage(2).doc JOHN C ,CLERK OF THE BOARD OF SUPERVI Contact: Joe Yee(313-7002) Orig.Dept.: Public Works Dept. cc: P.McNamee,Public Works Deputy Director M.Hollingsworth,Design BY: DEPUTY