Loading...
HomeMy WebLinkAboutMINUTES - 03142006 - C.5 se t TO: BOARD OF SUPERVISORS Contra ._,. j: ;; FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR — Costa C DATE: March 14, 2006 Count y SUBJECT: DETERMINE that the Sanitation District No. 5 Repairs and Maintenance project is a California Environmental Quality Act(CEQA), Class 1 Categorical Exemption;APPROVE and AUTHORIZE the Public Works Director,or designee,to advertise the project,Port Costa area. [CDD-CP#04-22] (District II) Project No. 7365-6X9E40 SPECIFIC RE-QUEST(S)OR RECOMMENDATION(S)&13ACKGIZOUND AND JUSTIFICATION RECOMMENDED ACTION: DETERMINE that the Sanitation District No. 5 Repairs and Maintenance project is a California Environmental Quality Act (CEQA), Class 1 Categorical Exemption, and DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk, and AUTHORIZE the Public Works Director to arrange for payment of a $25 fee to Community Development for processing, and a $25 fee to the County Clerk for filing the Notice of Exemption, and APPROVE the project and AUTHORIZE the Public Works Director, or designee, to advertise the project. Continued on Attachment: ® SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR ❑ RECOMMENDATION OF BOARD COM111irl"EE ['APPROVE ❑ OTHER SIGNATURE(S): ✓ ACTION OF BOA ON /t/dly�/ APPROVED AS R . OM MENDEDIZ OTHER ❑ VO'f.L� OF SUPERVISORS 1/ UNANIMOUS(ABSENT ) I hereby certify that this is a true and correct copy of an action AYES: NOES: taken and entered on the minutes of the Board of Supervisors on ABSENT: ABSTAIN: the date shown. "17:ms �L G:\GrpData\EngSvc"ENVIIZO\BO\2006'• ATTESTED: 0&-W4 (03-14-06)CEQA-SanDistNo-5(CE).doc JOHN CULLEN, Clerk of the Boar of Supervisors and County Orig.Div:Public Works(Environmental Section) Contact: "Irina Torres,(313-2176) Adtninistrator cc: Administrator-Attn.E.Kucvor Auditor-Controller Community Development 1-liliana Li By Deputy Public Works: Special Districts-L.Carnahan Accounting SUBJECT: DETERMINE that the Sanitation District No. 5 Repairs and Maintenance project is a California Environmental Quality Act(CEQA),Class 1 Categorical Exemption;APPROVE and AUTHORIZE the Public Works Director,or designee,to advertise the project,Port Costa area. [CDD-CP#04-22], (District H) Project No. 7365-6X9E40 DATE: March 14, 2006 PAGE: 2 of 2 .FISCAL IMPACT: ]'here is no impact to the County General Fund. The estimated project cost is $550,000, which will initially be funded through a loan and subsequently repaid via annual sewer service charges from the users of the sewer system. REASONS FOR RECOMMENDATIONS AND BACKGROUND: T11e project consists of the repair,maintenance and replacement of existing equipment at the Sanitation District No. `i wastewater treatment facility, in Port Costa. The purpose of the project is to repair two sand filtration beds and dispose of(or rejuvenate and re-utilize) ally impacted sand, as appropriate. The project also consists of removing outdated chemical feed equipment and replacing it with updated, flow-paced equipment to minimize the amount of chemicals exiting the facility. The discharge of effluent from the wastewater treatment facility is regulated by NPDES Permit No. CA0037885. The maintenance repairs and safety improvements being conducted are required by order of the San Francisco Bay Regional Water Quality Control Board. All of the maintenance work will be conducted on existing public facilities. The work will be compliant with State wastewater regulations and will be conducted in coordination with the State Water Resources Control Board and the San Francisco Bay Regional Water Quality Control Board. All of the repairs are necessary in order to restore the system to its originally designed capacity. None of the repairs nor the safety improvements will create an expansion Of use beyond the originally designed capacity of the wastewater treatment facility. It can be seen with certainty that there is no possibility that the project may have a significant adverse effect on the environment. CONSEQUENCES OF NEGATIVE ACTION: Delay in approving the project will result in a delay of design and construction and may jeopardize fLinding. CONTRA PUBLIC WORKS DEPARTMENT COSTA INITIAL STUDY COUNTY OF ENVIRONMENTAL SIGNIFICANCE PROJECT # 7365-6X9E40 C P# 04-22 PROJECT NAME: Sanitation District #5 Repairs and Maintenance PREPARED BY: Lisa Carnahan d" DATE: September 20, 2005 APPROVED BY: � DATE: jcrD6 7 RECOMMENDATIONS: (x ) Categorical Exemption (Class 1) ( ) Negative Declaration ( ) Environment Impact Report Required () Mitigated Negative Declaration :-The=project_will-not have-a-Siianificant-effect-on-the-:environment=-The-recomm_endatio.rr-is —based-on-fhe follo..wing:- The project= consists .of_-the repair; maintenance and minor = alteration of existing public facilities involving negligible or no expansion of use. The repairs are necessary in order to restore the system to its originally designed capacity. (Sec. 15301 Class 1)) What changes to the project would mitigate the identified impacts. N/A USGS Quad Sheet Benicia (B) Base Map Sheet# D-10 Parcel # 368-150-011 GENERAL CONSIDERATIONS: 1. Location: The project site is located at the end of Canyon Lake Drive in Port Costa, California. (See attached figures and Assessor's Map) 2. Project Description: The project consists of the repair, maintenance and minor alterations to the already existing equipment at the wastewater treatment facility and within the sanitation district in Port Costa. The following list details the different elements of the project: 1) Repair of two of the filter beds: Two of the four sand filtration beds will be repaired. Any impacted sand will be removed and taken to an appropriately classed landfill. The remaining sand will be temporarily removed from the beds, the concrete will be repaired and/or a liner will be placed in each bed, and the sand will be replaced. New sand will also be imported to bring the level of sand up to its intended depth. 2) Removal and replacement of sand in the remaining two filter beds: The impacted sand in the remaining two beds will be removed and taken to an appropriate landfill facility, and new sand will be imported. 3) Replacement of the chemical feed equipment and redundancy pumps: Outdated chemical feed equipment will be replaced with updated, flow-paced equipment which will minimize the G:\GrpData\SpDist\Lisa\Sanitation Districts\Port Costa\CEQA- Initial Study.doc amount of chemicals exiting the facility. Redundancy pumps will be installed to ensure a constant supply of chemicals, should one pump fail. 4) Standby emergency generator: A standby emergency generator will be wired into the system to prevent system malfunctions during power outages. This safety precaution will help prevent partially treated sewage from leaving the facility. 5) Auto-dialer alarm for equipment: The equipment will be connected to an auto-dialer system which will notify the operator of any system malfunctions. 6) Dosing structure siphons: The dosing structure siphons will be reconnected in order for the dosing structure to work in an automatic mode. 7) Replacement of piping on #3 and #4 pumps in the recirculation building: Piping will be installed to provide an alternate path for disinfection solution to the chlorine basin. In order to ensure uninterrupted sewer service to Port Costa residents, the wastewater — - -----treatment-facility ggJt9:gpqrateLdu.ring all-construction:activities:_ ::_ _:.:. The discharge of effluent from the wastewater treatment facility is regulated by NPDES Permit No. CA0037885, and the maintenance repairs and safety improvements being conducted are required by order of the California Regional Water Quality Control Board. All of the maintenance work will be conducted on existing public facilities. The work will be compliant with State wastewater regulations and will be conducted in coordination with the State Water Resources Control Board and the San Francisco Bay Regional Water Quality Control Board. All of the repairs are necessary in order to restore the system to its originally designed capacity. None of the repairs nor the safety improvements will create an expansion of use beyond the originally designed capacity of the wastewater treatment facility. A temporary railroad crossing will be obtained from the Union Pacific Railroad for this work. Real Property transactions may be necessary in support of the project. 3. Does it appear that any feature of the project will generate significant public concern? [ ] yes [✓ ] no [ ] maybe (Nature of concern): 4. Will the project require approval or permits by other than a County agency? [✓ ] yes [ ] no Agency Name(s): Regional Water Quality Control Board, Union Pacific Railroad 5. Is the project within the Sphere of Influence of any city? No. G:\GrpData\SpDist\Lisa\Sanitation Districts\Port Costa\CEQA- Initial Study.doc navoa (owe Io lop 55 Je 19 r'0 1p el • Lr I — U O Z) U S < Z) u N V r - [m0 Q Ln o N N O Q ¢ O Li m c Ll _ a \ 0 Q \ U O A X \ ` Q e �f 23 1 �e Y /tee'• ped �•i� ^7 6 IO 6� 5�.11 qz �� 0 ti ryy CN a/ cv ;�:vc � so •Ob/ �q. co rn CV W m O ♦,vy' Y. 16 C oLLJ z f 1 LLJ 1Cr�r.i " v sqAS dz ��I• .j. ( C) O .osr W z n/ 0 Q fi •002 0 - O/ N�7• 2nnlyvl: .OSI � �- caucus xao;r�so�,uv J uuvx z]xlnay) ——— E L] � �f'7 • y �f. y 1 -J J s { y 2 x CALIFORNIA ENVIRONMENTAL QUALITY ACT Notice of Exemption Contra Costa County Community Development Department 651 Pine Street, 4th Floor- North Wing, McBrien Administration Building Martinez, CA 94553-0095 Telephone: (925) 313-2191 Contact Person: Lisa Carnahan - Public Works Dept. Project Description, Common Name (if any) and Location: Contra Costa County Sanitation District #5 Wastewater Treatment Facility Repairs and Maintenance. County File CP#04-22. The project site is located at the end of Canyon Lake Drive in Port Costa, California.The project consists of the repair and minor alterations to the already existing equipment at the wastewater treatment facility and within the sanitation district in Port Costa. 1) Repair of two of the filter beds: Two of the four sand filtration beds will be repaired. Any impacted sand will be removed and taken to an appropriately classed landfill. The remaining sand will be temporarily removed from the beds, the concrete will be repaired and/or a liner will be placed in each bed, and the sand will be replaced. New sand will also be imported to bring the level of sand up to its intended depth. 2) Removal and replacement of sand in the remaining two filter beds: The impacted sand in the remaining two beds will be removed and taken to an appropriate landfill facility, and new sand will be imported. 3) Replacement of the chemical feed equipment and redundancy pumps: Outdated chemical feed equipment will be replaced with updated, flow-paced equipment which will minimize the amount of chemicals exiting the facility. Redundancy pumps will be installed to ensure a constant supply of chemicals, should one pump fail. 4) Standby emergency generator: A standby emergency generator will be wired into the system to prevent system malfunctions during power outages. This safety precaution will help prevent partially treated sewage from leaving the facility. 5) Auto-dialer alarm for equipment: The equipment will be connected to an auto-dialer system which will notify the operator of any system malfunctions. 6) Dosing structure siphons: The dosing structure siphons will be reconnected in order for the dosing structure to work in an automatic mode. 7) Replacement of piping on#3 and#4 pumps in the recirculation building: Piping will be installed to provide an alternate path for disinfection solution to the chlorine basin. In order to ensure uninterrupted sewer service to Port Costa residents, the wastewater treatment facility will continue to operate during all construction activities. The discharge of effluent from the wastewater treatment facility is regulated by NPDES Permit No. CA0037885, and the maintenance repairs and safety improvements being conducted are required by order of the California Regional Water Quality Control Board. All of the maintenance work will be conducted on existing public facilities. The work will be compliant with State wastewater regulations and will be conducted in coordination with the State Water Resources Control Board and the San Francisco Bay Regional Water Quality Control Board. All of the repairs are necessary in order to restore the system to its originally designed capacity. None of the repairs nor the safety improvements will create an expansion of use beyond the originally designed capacity of the wastewater treatment facility. A temporary railroad crossing will be obtained from the Union Pacific Railroad for this work. Real Property transactions may be necessary in support of the project. This project is exempt from CEQA as a: Ministerial Project (Sec. 15268) _ Other Statutory Exemption, Section Declared Emergency(Sec. 15269(a)) _ General Rule of Applicability[Section 15061(b)(3)] Emergency Project (Sec. 15269 (c)) X Categorical Exemption,_Class 1 for the following reason(s): The project will not have a significant effect on the environment. The project consists of the repair and maintenance of existing public facilities involving negligible or no expansion of use. (Sec. 15301 Class 1)) Date: By: Conuminity Developmcnt Department Representative AFFIDAVIT OF FILING AND POSTING I declare that on I received and posted this notice as required by California Public Resources Code Section 21152(c). Said notice will remain posted for 30 days from the filing date. Signature Title Applicant: County Public Works Department 255 Glacier Drive Martinez, CA 94553 Attn: Lisa Carnahan County Clerk Fee $50 Due I G:\C;rpl)ata\SpDist\I-isa\Sanitation Districts\Port Costa\CEQA-NOE.doc CALIFORNIA ENVIRONMENTAL QUALITY ACT Notice of Exemption Contra Costa County Community Development Department 651 Pine Street, 4th Floor- North Wing, McBrien Administration Building Martinez, CA 94553-0095 Telephone: (925) 313-2191 Contact Person: Lisa Carnahan - Public Works Dept. Project Description, Common Name (if any) and Location: Contra Costa County Sanitation District #5 Wastewater Treatment Facility Repairs and Maintenance. County File CP#04-22. The project site is located at the end of Canyon Lake Drive in Port Costa,California.The project consists of the repair and minor alterations to the already existing equipment at the wastewater treatment facility and within the sanitation district in Port Costa. 1) Repair of two of the filter beds: Two of the four sand filtration beds will be repaired. Any impacted sand will be removed and taken to an appropriately classed landfill. The remaining sand will be temporarily removed. from the beds, the concrete will be repaired and/or a liner will be placed in each bed, and the sand will be replaced. New sand will also be imported to bring the level of sand up to its intended depth. 2) Removal and replacement of sand in the remaining two filter beds: The impacted sand in the remaining two beds will be removed and taken to an appropriate landfill facility, and new sand will be imported. 3) Replacement of the chemical feed equipment and redundancy pumps:Outdated chemical feed equipment will be replaced with updated, flow-paced equipment which will minimize the amount of chemicals exiting the facility. Redundancy pumps will be installed to ensure a constant supply of chemicals, should one pump fail. 4) Standby emergency generator: A standby emergency generator will be wired into the system to prevent system malfunctions during power outages. This safety precaution will help prevent partially treated sewage from leaving the facility. 5) Auto-dialer alarm for equipment: The equipment will be connected to an auto-dialer system which will notify the operator of any system malfunctions. 6) Dosing structure siphons: The dosing structure siphons will be reconnected in order for the dosing structure to work in an automatic mode. 7) Replacement of piping on#3 and#4 pumps in the recirculation building: Piping will be installed to provide an alternate path for disinfection solution to the chlorine basin. In order to ensure uninterrupted sewer service to Port Costa residents, the wastewater treatment facility will continue to operate during all construction activities. The discharge of effluent from the wastewater treatment facility is regulated by NPDES Permit No. CA0037885, and the maintenance repairs and safety improvements being conducted are required by order of the California Regional Water Quality Control Board. All of the maintenance work will be conducted on existing public facilities. The work will be compliant with State wastewater regulations and will be conducted in coordination with the State Water Resources Control Board and the San Francisco Bay Regional Water Quality Control Board. All of the repairs are necessary in order to restore the system to its originally designed capacity. None of the repairs nor the safety improvements will create an expansion of use beyond the originally designed capacity of the wastewater treatment facility. A temporary railroad crossing will be obtained from the Union Pacific Railroad for this work. Real Property transactions may be necessary in support of the project. This project is exempt from CEQA as a: Ministerial Project (Sec. 15268) _ Other Statutory Exemption, Section Declared Emergency(Sec. 15269(a)) _ General Rule of Applicability[Section 15061(b)(3)] Emergency Project (Sec. 15269 (c)) X Categorical Exemption,_Class 1 for the following reason(s): The project will not have a significant effect on the environment. The project consists of the repair and maintenance of existing public facilities involving negligible or no expansion of use. (Sec. 15301 Class 1)) Date: By: Community Development Department Representative AFFIDAVIT OF FILING AND POSTING I declare that on I received and posted this notice as required by California Public Resources Code Section 21152(c). Said notice will remain posted for 30 days from the filing date. Signature Title Applicant: County Public Works Department 255 Glacier Drive Martinez, CA 94553 Attn: Lisa Carnahan County Clerk Fee $50 Due G:\GrpData\SpDist\I-isa\Sanitation DistrictsTort Costa\CEQA-NOE.doc -� "Contra Costa Times To: EShar@cob.cccounty.us s.. .,.. �., Legals" cc: t'w <cctlegals@cctimes.c Subject: PORT COSTA TREATMENT FACILITY UPGRADES v\} 09/14/2006 03:17 PM Please respond to cctlegals T.1-I..[S .E-MAIL CONTAINS PERTINENT INFORNI.AT..I.ON; PLEASE READ IT CAREFULLY IN ITS .ENTIRETY. Good Afternoon. If you have any questions regarding the legal notice confiniied below, please reference the LEGAL NUMBER provided. Only e-mail tocetleaals(a.cctimes.com regarding Contra Costa Times, Concord Transcript, or Contra Costa Sun legal notices. ** LEGAL SCHEDULE CONFIRMATION ** TYPE: In-Column Liner, Classified Section LEGAL NUNJBER: 6686 PO#: F05508 2010 Publication: CCT Run Date(s): 09/30, 10/06 .Legal Acct#: 200 4197 Total Amount: $512.40 FOR YOUR INFORMATION - Revisions/Cancellations: l will need a cancellation request referenchi2 the LEGAL NUMBER— or all changes attached in a final draft Microsoft Word Document —e-mailed to ectleaalsr>ectimes.com by no later than 4 PM, Thurs., 09/28. Otherwise, the wording of the legal will publish as you e-mailed. Thanks! Anashia Lloyd .Legal Advertising Coordinator (925) 943-8019 (925) 943-8359 — fax Contra Costa Times ATTN: Legal Dept. P.O. Box 4718 Walnut Creek, CA 94596 cctlegals&ctimes.com ;;. LEGAL PUBLICATION REQUISITION Contra Costa County ST'S COUT7"� FROM: Clerk of the Board TO: Contra Costa Times 651. Pine St., Room 106 P.O. Box 471.8 Pine Street, Martinez 94.553 Walnut Creek, CA 94596 FAX No. 92.5-943-8359 Requested by: EMY L. SHARP Date: SEPTEMBER 14 , 2006 Phone No.: 925-335-1903 Reference No.: 2010 Ora.: Sub Object: 2190 Task: SAS Activity: Publication Date (s) SEPTEMBER 30 , 2006 AND OCTOBER 06 , 2006 No. of Pages: 3) LEGAL PUBLICATION PORT COSTA TREATMENT FACILITY UPGRADES "FAX ONLY" xxx Immediately upon expiration of publication, Xxx send in one affidavit for each publication in order that the auditor may be authorized to pay you bill. ANASHIA, SORRY I HAVE TO FAX BECAUSE I AM WORRIED YOU MIGHT NOT GET MY E—MAIL. Authorized Sianature: Please confirm date of publication and receipt of this fax. PUBLIC WORKS DEPARTMENT 255 Glacier Drive, Martinez, California 94553-4897 NOTICE TO CONTRACTORS The Public Works Director, on behalf of Contra Costa Sanitation District No. 5, will receive sealed bids at the Public Works Department, C.C. Rich Building, 255 Glacier Drive, Martinez, California 94553-4897, until 2 o'clock p.m., on October 17, 2006, at which time they will be publicly opened and read, for: PORT COSTA TREATMENT FACILITY UPGRADES. General Work Description: Construction and removal of a temporary railroad crossing and installation of sewage treatment facility upgrades, including the following: Rehabilitation of existing filter bed system; installation of new dome supports to reattach the existing dosing structure; installation of new chemical feed equipment including dosing PUMPS, a residual chlorine analyzer and miscellaneous PVC piping; installation of a new standby electrical generator, motor control center (MCC) and electrical room; and installation of a programmable logic controller (PLC) and auto dialer alarm system. .Engineer's cost estimate: $350,000 A field meeting will be held on September 25, 2006 at 10:00 a.m. at the Port Costa Treatment Facility (Railroad Avenue, Port Costa) to view the facility and clarity proposed work. Prospective bidder's attendance is hibhl-v recommended. Contract Documents, including plans and specifications, may be viewed and/or obtained at the Public Works Department, C.C. Rich Building, 255 Glacier Drive, Martinez, California 94553- 4897, Monday - ThLn-sday (7:00 a.m. - 12 Noon and 1:00 p.m. - 5:00 p.m.) (closed Fridays). To obtain plans and specifications a service charge is required in the amount of $ 38.00 (sales tax included). Plans and specifications may be ordered by mail for an additional shippina and handlinL tee of$ 5.00 . Checks shall be made payable to The County of Contra Costa' and be mailed to the above address. The Public Works Department does not guarantee the arrival of the plans and specifications in time for bidding. Plans and specifications will not be sent overnight mail. This project is to be advertised pursuant to Public Contract Code 20783. This contract is subject to state contract nondiscrimination and compliance class requirements pursuant to Government Code, Section 12990. The Contractor shall possess a Class A License at the time the Contract is awarded. Bids must cover the entire project, and neither partial nor contingent bids will be considered. The successful bidder shall furnish a payment bond and a performance bond. The Board has ascertained the general prevailing rate of wages applicable to this work. The prevailing rate of per diem wages is on file with the Clerk of the Board of Supervisors, and is incorporated herein by reference thereto, the same as if set forth in full herein. For any classification not included in the list, the minimum wage shall be the general prevailing rate for Contra Costa County. The bid opening date may be extended by addendum issued by the Public Works Department no later than October 13, 2006, in which case any bids submitted for the original bid opening will be returned unopened and sealed bid proposals for the extended bid opening shall be submitted on or before October 31, 2006, at 2:00 p.m., and will be opened, read and recorded at the same place specified above. All proposals received late will be returned unopened. The said Board reserves the right to reject any and all bids or any portion of any bid and/or waive any irregularity in any bid received. For questions regarding the project contact Carl Romer, Design Division, at (925j 313-2213. By order of the Board of Supervisors of Contra Costa County as the governing body of Contra Costa Sanitation District No. 5 By EMY L. SHARP Deputy Dated: SEPTEMBER 14, 2006 Publication dates: SEPTEMBER 30, 2006 OCTOBER 06, 2006 1 CONTRA COSTA COUNTYPUBLIC WORKS DEPARTM SEp 255 GLACIER DRIVE, MARTINEZ, CALIFORNIA 9�oNTAq oFSUp?00 COSTA CQ V�S�9S DATE: SEPTEMBER 11, 2006 TO: Jane Pennington, Chief Clerk of the Board Attn: Emy Sharp, Deputy Clerk, Clerk of the Board eshar�cob.co.contra-costa.ca.uscosta.ca.us FROM: Michael Hollingsworth, A nt P lic rk e 313-2231 SUBJECT: Authorization to Advertise"Port Costa Treatment Facility Upgrades" This is your Authorization to advertise the attached Notice to Contractors for the "Port Costa Treatment Facility Upgrades" project and publish the Notice to Contractors under Public Contract Code: 20783 in the Contra Costa Times The attached Board Order authorizing the Public Works Director to advertise this project was approved on March 14, 2006 agenda item number C.5. The bid due date for this project is: October 17, 2006 Project No: 7380-6X9E49 "Notice to Contractors" is attached. Send two hard copies of the"Notice"to the Clerk, and e-mail this to Emy as well. Note if project name on CEQA/environmental document has been changed to a new project name. MH:kp G:\GrpData\Design\FORMS\Drawer#2\D-7.doc Attachments "Carl Roner" To: <eshar Oa cob.cc.contra-costa.ca.us> >u;<, <crone@pw.cccounty. cc: us> Subject: Authorization to Advertise "Port Costa Treatment Facility Upgrades" 09/13/2006 03:26 PM Emi: Attached is the Authorization to Advertise the Port Costa Treatment Facility Upgrades Project. I will send a hard copy over in County mail. I have also attached Public Contract Code 20783 as we don't advertise this way very often. Call me if you have questions. Carl J. Roner Associate Civil Engineer Contra Costa County Public Works Department 255 Glacier Drive Martinez, CA 94553-4825 Telephone: (925) 313-2213 Fax: (925) 313-2333 D-7 SD5.doc Public Contract Code 20783. Cal.ifomia Laws: Public Contract Code = Section 20780-20784 Page 1 of 2 Home>California_Laws>Public Contract Code>Section 20780-20784 lCauti.on) CALIFORNIA PUBLIC_CONTRACT CODE 20780. The provisions of this article shall apply to contracts by sanitation districts as provided for in the County Sanitation District Act pursuant to Division 5 (commencing with Section 4700)of the Health and Safety Code. 20782. A district may make and perform any agreement with any public or private corporation of any kind or any person for the joint construction, acquisition, disposition, or operation of any property or works of a kind which might be constructed, acquired, disposed of, or operated by the district. 20783. When work is done by the district itself by force account, the amount shall not exceed five thousand dollars ($5,000). When the expenditure required for the work exceeds thirty-five thousand dollars ($35,000), it shall be contracted for and let to the lowest responsible bidder after notice. The notice inviting bids shall set a date for the opening of bids.The first publication or posting of the notice shall be at least 10 days before the date of opening the bids. Notice shall be published at least twice, not less than five days apart, in a newspaper of general circulation, printed and published in the district, or if there is none, it shall be posted in at least three public places in the district that have been designated by the district board as the places for posting this notice. The notice shall distinctly state the work to be done. In its discretion, the district board may reject any bids presented and readvertise. If two or more bids are the same and the lowest, the district board may accept the one it chooses. If no bids are received, the district board may have the work done without further bid. If all bids are rejected, the district board, on a resolution adopted by a four-fifths vote, may declare that the work can be performed more economically by day labor, or the materials or supplies furnished at a lower price in the open market and may have the work done in a manner stated in the resolution in order to take advantage of this tower cost. If there is a present or anticipated great public calamity, including an extraordinary fire, flood, storm, or other disaster the district board may, by resolution adopted by a four-fifths vote declaring that the public interest and necessity demand immediate expenditure of public money to safeguard life, health, or property, expend any sure required in the emergency without submitting the expenditure to bid. Cost records of the work shall be kept in the manner provided in Sections 4000 to 4007, inclusive, of the Government Code. This section shall not apply to sewerage maintenance, repair work, or to any uncompleted works under construction by district forces prior to the enactment of this section, and shall not be construed to exempt any work from Part 7(commencing with Section 1720) of Division 2 of the Labor Code. 20784. ALI bids for construction work shall be presented under sealed cover and shall be accompanied by one of the following forms of bidder's security. (a) Cash. (b) A cashier's check made payable to the district. (c) A certified check made payable to the district. (d)A bidder's bond executed by an admitted surety insurer, made payable to the district. Upon an award to the Lowest bidder, the security of an unsuccessful bidder shall be returned in a reasonable period of time, but in no event shall that security be held by the district beyond 60 days from the time the award is made. http:Hwww.aroundtliecapitol.com/codee/'code.html?scc=pcc&codesectioii=20780-20784 9/13/2006 PROOF OF PUBLICATION (2015.5 C.C.P.) STATE OF CALIFORNIA County of Contra Costa C I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the above-entitled matter. I am the Principal Legal Clerk of the Contra Costa Times, a newspaper of general circulation, printed and published at 2640 Shadelands Drive in the City of Walnut Creek, County of Contra Costa, 94598. And which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Contra Costa, State of California, under the date of October 22, 1934. Case Number 19764. The notice, of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: Jan 8, all in the year of 2007 I certify (or declare) under penalty of perjury that the foregoing is true and correct. E:xecutedp Walnut CLe ek, Californ' On this Y�i day of January , 20 ............................................................ .... .............. Signature Contra Costa Times P 0 Box 4147 Walnut Creek, CA 94596 (925) 935-2525 Proof of Publication of: (attached is a copy of the legal advertisement that published) Contra Costa County Sanitation District No.S 255 Glacier Drive,Marti- nez,California 94553-4897 NOTICE TO CONTRACTORS The Public Works Direc- tor, on behalf of Sanita- tion District tt5, will re- ceive sealed bids at the Public Works Depart- ment, C.C. Rich Building, 255 Glacier Drive, Marti- nez,California 94553-4897, until 2 o'clock p.m., on January 23,2007,at which time they will be publicly opened and read,for:the PORT COSTA TREATMENT FACILITY UPGRADES. General Work Descrip- tion: Construction and re- moval of a temporary railroad crossing and in- stallation of sewage treatment facility up. grades,including the fol- lowing: Installation of new dome supports to re- attach the existing dos- inqstructure;installation of new chemical feed equipment including dos- ing pumps, a residual chlorine analyzer and miscellaneous PVC pip- ing;installation of a new standby electrical gener- ator,motor control center (MCC) and electrical room; and installation of a programmable logic controller(PLC)and auto dialer alarm system. Engineer's cost esti- mate:$250,000 A field meeting will be held on Monday,January 8, 2007, at 10:00 a.m. at the Port Costa Treatment Facility(Railroad Avenue, Port Costa) to view the facility and clarify the proposed work. Prospec- tive bidder's attendance Is highly recommended. Contract Documents,in- cluding plans and specifi- cations, may be viewed and/or obtained at the Public Works Depart- ment, C.C. Rich Building, 255 Glacier Drive, Marti- nez,California 94553-4897, Monday- Thursday (7:00 a.m. - 12 Noon and 1:00 Mid* - 5:00 p.m.) (Closed Fridays).To obtain plans and specifications a serv- ice charge is required in the amount of $ 38.00 (sales tax included). Plans and specifications may be ordered by mail for an additional shipping and handling fee of$5.00. Checks shall be made payable to'The County of Contra Costa' and be mailed to the above ad- dress. The Public Works Department does not guarantee the arrival of the plans and specifica- tions in time for bidding. Plans and specifications will not be sent overnight mail. This project is to be ad- vertised pursuant to Pub- lic Contract Code 22037. This contract is subject to state contract nondis- crimination and compli- ance class requirements pursuant t0 Government Code,Section 12990. The Contractor shall possess a Class A 0r C-30 License at the time the Contract is awarded. Bids must cover the en- tire project, and neither Enor contingent bids will be considered. The successful bidder shall furnish a payment bond and a performance bond The Board has ascer- tained the general pre- vailing rate of wages ap- plicable to this work. The prevailing rate of per diem wages is on file with the Clerk of the Board of Supervisors,and is incor- porated herein by refer- ence thereto,the same as if set forth in full herein. For any classification not included in the list, the minimum wage shall be the •general prevailing rate for Contra Costa County. The bid opening date may be extended by ad- dendum issued by the Public works Department no later than January 19, 2007, in which case any bids submitted for the original bid opening will be returned unopened and sealed bid proposals for the extended bid opening shall be submit- ted on or before February 6,2007,at 2:00 p.m. and will be opened,read and recorded at the same place specified above. All proposals received late will be returned unop- ened. The said Board re- serves theright to reject any,and all bids or any porion of any bid and/or waive any irregularity in any bid received. For questions regard- ing the project contact Carl Roner, Design Divi- sion.at(925)313-2213. By EMY L.SHARP Deputy Dated: NOVEMBER 29,2006 Legal CCT 7218 Publish January 8,2007 PROOF OF PUBLICATION (2015.5 C.C.P.) STATE OF CALIFORNIA County of Contra Costa I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the above-entitled matter. I am the Principal Legal Clerk of the Contra Costa Times, E newspaper of general circulation, printed and published eit 2640 Shadelarnds Drive in the City of Walnut Creek, County of Contra Costa, 94598. And which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Contra Costa, State of California, under the date of October 22, 1934. Case Number 19764. The notice, of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: .Jan 8, .all in the year of 2007 I certify (or declare) under penalty of perjury that the foregoing is true and correct. Executed ot Walnut QLeek, Californ' On this day of January , 20 ............................................................ .... .............. Signature Contra Costa Times P O Box 4147 Walnut Creek, CA 94596 (925) 935-2525 Proof of Publication of: (attached is a copy of the legal advertisement that published) "Contra Costa Times To: EShar@cob.cccounty.us Legals" cc: <cctlegals@cctimes.c Subject: PORT COSTA TREATMENT FACILITY UPGRADES ; om> 11/29/2006 02:37 PM Please respond to cctlegals THIS E-MAIL CONTAINS PERTINENT INFORI\1ATION; PLEASE READ .I.T CARE FCILLY I.N .ITS ENTIRETY. PLEASE NOTE: All of oui•offices will be closed Chi•istnias Dirl,-, .December 25, 2006 and Nein Year's.Da January 1, 2007. Good Afternoon. If you have any questions regarding the legal notice confirmed below, please reference the LEGAL WN.I.-BER provided. Only e-mail toectle2als(ii!ectimes.com regarding Contra Costa.Times, Concord Transcript, or Contra Costa Sun legal notices. ** .LEGAL SCI fEDUL.E CONFIRMATION TYPE: ln-Column .Liner, Classified Section .LEGAL NUMBER: 7218 PO-1t: F05508 2025 Publication: CCT Run Date(s): 01/08 Legal Acct#: 200 4197 Total Amount: $249.20 FOR YOUR INFORMATION - Revisions/Cancellations: 1. will need a cancellation request referencin<( the LEGA1. NUMBER—or all changes attached in a final draft .M.icrosoft Word Document —e-mailed to cct1e2a1s(ikctimes.com by no later than 4 PM, Thurs., 01/04. Otherwise, the ivordin6 of the legal will publish as you e-mailed. Thanks! Anashia Lloyd Legal Advertising Coordinator (925) 943-8019 (925) 943-8359 — fax Contra Costa Times ATTN: Legal Dept. P.O. Box 4718 Walnut Creek, CA 94596 cctlegals@cctimes.coni - ; ' =- LEGAL PUBLICATION RE UISITION g^ _y 404 Contra Costa County •Sj'9•COUNT FIROM: Clerk of the Board TO: Contra Costa Times 651 Pine St., Room 106 P.O. Boa 4718 Pine Street, Martinez 94553 Walnut Creek, CA 94596 E-MAIL: cctlegalsncctimes.com FAX No. 925-943-8359 Requested by: EMY L. SHARP Date: NOVEMBER 29 , 2006 Phone No.: 925-335-1903 Reference No.: Ora.: 7380 Sub Object: 2190 Task: SAS Activity: 6X9E49 Publication Date (s) JANUARY 0 , 2007 No. of Pages: (3) LEGAL PUBLICATION PORT COSTA TREATMENT FACILITY UPGRADES ** Immediately upon expiration of publication, *** send in one affidavit for each publication in order that the auditor may be authorized to pay you bill. "E-MA " 4 Authorized Signature. Please confirm date of publication and receipt of this fax. Contra Costa County Sanitation District No. 5 255 Glacier Drive, Martinez, California 94553-4897 NOTICE TO CONTRACTORS The Public Works Director, oil behalf of Sanitation District #5, will receive sealed bids at the Public Works Department, C.C. Rich Building, 255 Glacier Drive, :Martinez, California 94553- 4897, until 2 o'clock p.m., on January 23, 2007, at which time they will be publicly opened and read, for: the PORT COSTA TREATM=ENT FACILITY UPGRADES. General Work Description: Construction and removal of a temporary railroad crossing and installation of sewage treatment facility upgrades, including the following: Installation of new dome supports to reattach the existing dosing structure: installation of new chemical feed equipment including dosing puMPs, a residual chlorine analyzer and miscellaneous PVC piping; installation of a new standby electrical generator, motor control center (MCC) and electrical room; and installation of a programmable logic controller (PLC) and auto dialer alarm system. Engineer's cost estimate: $250.000 A .field meeting will be held on Monday.. January 8, 2007, at 10:00 a.m. at the Port Costa Treatment Facility (Railroad Avenue, Port Costa) to view the facility and clarify the proposed work. Prospective bidder's attendance is highly recommended. Contract Documents, including plans and specifications, may be viewed and/or obtained at the Public Works Department C.C. Rich Building, 255 Glacier Drive, Martinez, California 94553- 4897, Monday - Thursday (7:00 a.m. - 12 Noon and 1:00 p.m. - 5:00 p.m.) (closed Fridays). To obtain plans and specifications a service charge is required in the amount of $ 38.00 (sales tax included). Plans and specifications may be ordered by mail for an additional shipping and handlin-, tee of$ 5.00 . Checks shall be.made payable to 'The County of Contra Costa' and be mailed to the above address. The Public Works Department does not guarantee the an-lval of the plans and specifications in time for bidding. Plans and specifications will not be sent overnight mail. This project is to be advertised pursuant to Public Contract Code 22037. This contract is subject to state contract nondiscrimination and compliance class requirements Pursuant to Government Code, Section 12990. The Contractor shall possess a Class A or C-10 License at the time the Contract is awarded. Bids must cover the entire project, and neither partial nor contingent bids will be considered. The successful bidder shall furnish a payment bond and a performance bond The Board has ascertained the general prevailing rate of wages applicable to this work. The prevailing rate of per diem wages is on file with the Clerk of the Board of Supervisors, and is incorporated herein by reference thereto, the same as if set forth in frill herein. For any classification not included in the list, the minimum wage shall be the general prevailing rate for Contra Costa County. The bid opening date may be extended by addendum issued by the Public Works Department no later than January 19, 2007, in which case any bids submitted for the original bid opening will be returned unopened and sealed bid proposals for the extended bid opening shall be submitted on or before February 6, 2007, at 2:00 p.m., and will be opened, read and recorded at the same place specified above. All proposals received late will be returned unopened. The said Board reserves the right to reject any and all bids or any portion of any bid and/or waive any In-egularity in any bid received. For questions regarding the project contact Carl Roner, Design Division, at (925) 313-2213. By EMY L. SHARP Deputy .Dated: NOVEMBER 29, •'_006 Publication dates: JANUARY 08, 2007 CONTRA COSTA COUNTYPUBLIC WORKS DEPARTMENT 255 GLACIER DRIVE, MARTINEZ, CALIFORNIA .DATE: NOVEMBER 28, 2006 TO: Jane Pennington, Chief Clerk of the Board Attn: Emy Sharp, Deputy Clerk, Clerk of the Board eshar-a,cob co_contra-costa_ca_us .FROM.: Michael Hollingsworth, Assistant Public Works Director 313-2231 SUBJECT: Authorization to Advertise "Port Costa Treatment :Facility Upgrades" This is your Authorization to advertise the attached Notice to Contractors for the "Porn Costa Treatment Facility Upgrades" project and publish the Notice to Contractors under Public Contract Code: 22037 in the Contra Costa "Times. The attached Board Order authorizing the Public Works Director to advertise this project was approved on March 14, 2006 agenda item number C.5. The bid due date for this project is January 23, 2007 Project No: 7380-6X9E49 "Notice to Contractors" is attached. Please note that this is the second advertisement of this project, and that the scope and engineer's estimate has been reduced. Bids were allowed to expire on the previous advertisement. M1-I:kp G:`GtpData\Dcsicn\POIU1S`.Dra •cr ±=`•,U-7.doi• Attachments ,.~ "Carl Roner" To: <eshar@cob.co.contra-costa.ca.us> `:. <crone@pw.cccounty. cc: US> Subject: Updated Authorization to Advertise the "Port Costa Treatment Facility Upgrades" project 11/29/2006 08:13 AM Emy: Attached is the Authorization to Advertise the"Port Costa Treatment Facility Upgrades" project in both pdf and Word form. Please note that this is the second advertisement of this project, and that the scope and engineer's estimate has been reduced. Bids were allowed to expire on the previous advertisement. Please call me if you have any questions. Please also ignore the version of this document I sent you last night at 5:30 p.m. if you received it. Carl J. Roner Associate Civil Engineer Contra Costa County Public Works Department 255 Glacier Drive Martinez, CA 94553-4825 Telephone: (925) 313-2213 Fax: (925) 313-2333 F777L F774 LI LId D-7.pdf D-7 SD5 11-28-06.do CONTRA COSTA COUNTYPUBLIC WORKS DEPARTMENT 255 GLACIER DRIVE, MARTINEZ, CALIFORNIA DATE: NOVEMBER 28, 2006 TO: Jane Pennington, Chief Clerk of the Board Attn: Emy Sharp, Deputy Clerk, Clerk of the Board eshar(a-),cob.co.contra-costa.ca.us FROM: Michael Ho ingswortl , As s ablica Ws Director 313-2231 SUBJECT: Authorization to Advertise ""P"o"rt Costa Treatment Facility Upgrades" This is your Authorization to advertise the attached Notice to Contractors for the "Port Costa Treatment Facility Upgrades" project and publish the Notice to Contractors under Public Contract Code: 22037 in the Contra Costa Times. The attached Board Order authorizing the Public Works Director to advertise this project was approved on March 14, 2006 agenda item number C.5. The bid due date for this project is January 23, 2007 Project No: 7380-6X9E49 "Notice to Contractors" is attached. Please note that this is the second advertisement of this project, and that the scope and engineer's estimate has been reduced. Bids were allowed to expire on the previous advertisement. MH:kp G:\GrpData\Design\170RMS\Drawer#2\I)-7.doc Attachments FV � � 2006 RD OFSUP�gTRA COSTA Co. Project Name: PORT COSTA TREATMENT FACILITY UPGRADES Project Number: 7380-6X9E49 Contra Costa County Sanitation District No. 5 255 Glacier Drive, Martinez, California 94553-4897 NOTICE TO CONTRACTORS The Public Works Director, on behalf of Sanitation District #5, will receive sealed bids at the Public Works Department, C.C. Rich Building, 255 Glacier Drive, Martinez, California 94553- 4897, until 2 o'clock p.m., on January 23, 2007, at which time they will be publicly opened and read, for: the PORT COSTA TREATMENT FACILITY UPGRADES. General Work Description: Construction and removal of a temporary railroad crossing and installation of sewage treatment facility upgrades, including the following: Installation of new dome supports to reattach the existing dosing structure; installation of new chemical feed equipment including dosing pumps, a residual chlorine analyzer and miscellaneous PVC piping; installation of a new standby electrical generator, motor control center (MCC) and electrical room; and installation of a programmable logic controller(PLC) and auto dialer alarm system. Engineer's cost estimate: $250,000 A field meeting will be held on Monday, January 8, 2007, at 10:00 a.m. at the Port Costa Treatment Facility (Railroad Avenue, Port Costa) to view the facility and clarify the proposed work. Prospective bidder's attendance is highly recommended. Contract Documents, including plans and specifications, may be viewed and/or obtained at the Public Works Department, C.C. Rich Building, 255 Glacier Drive, Martinez, California 94553- 4897, Monday - Thursday (7:00 a.m. - 12 Noon and 1:00 p.m. - 5:00 p.m.) (closed Fridays). To obtain plans and specifications a service charge is required in the amount of$ 38.00 (sales tax included). Plans and specifications may be ordered by mail for an additional shippinji and handling fee of$ 5.00. Checks shall be made payable to 'The County of Contra Costa' and be mailed to the above address. The Public Works Department does not guarantee the arrival of the plans and specifications in time for bidding. Plans and specifications will not be sent overnight mail. This project is to be advertised pursuant to Public Contract Code 22037. This contract is subject to state contract nondiscrimination and compliance class requirements pursuant to Government Code, Section 12990. The Contractor shall possess a Class A or C-10 License at the time the Contract is awarded. Bids must cover the entire project, and neither partial nor contingent bids will be considered. The successful bidder shall furnish a payment bond and a performance bond. The Board has ascertained the general prevailing rate of wages applicable to this work. The prevailing rate of per diem wages is on file with the Clerk of the Board of Supervisors, and is incorporated herein by reference thereto, the same as if set forth in full herein. For any classification not included in the list, the minimum wage shall be the general prevailing rate for Contra Costa County. The bid opening date may be extended by addendum issued by the Public Works Department no later than January 19, 2007, in which case any bids submitted for the original bid opening will be returned unopened and sealed bid proposals for the extended bid opening shall be submitted on or before February 6, 2007, at 2:00 p.m., and will be opened, read and recorded at the same place specified above. All proposals received late will be returned unopened. The said Board reserves the right to reject any and all bids or any portion of any bid and/or waive any irregularity in any bid received. For questions regarding the project contact Carl Roner, Design Division, at(925) 313-2213. By order of the Board of Supervisors of Contra Costa County as the governing body of the Contra Costa Sanitation District#5. John Cullen Clerk of the Board of Supervisors and County Administrator By Deputy Dated: Publication dates: