Loading...
HomeMy WebLinkAboutMINUTES - 06222004 - C.147 THE BOARD OF SUPERVISORS CONTRA COSTA COUNTY,CALIFORNIA Adopted this Order of June 22, 2004,by the following vote: AYES: SUPERVISORS UILKEMA, DESAULNIER AND GREENBERG NOES: NONE ABSENT: SUPERVISORS GIOIA AND GLOVER ABSTAIN: NONE SUBJECT: Approve Plans and Specifications for the Installation of Two Fre-Treatment Sewage Grinders at the Martinez Detention Facility, 1000 Ward Street, Martinez for the Sheriff- Coroner Department (CP#04-14) Budget Line Item No. 4411-4245 Authorization No. 0928-WH245B WHEREAS plans and specifications for the Installation of Two Pre-Treatment Sewage Grinders at the Martinez Detention Facility, 1000 Ward Street, Martinez for the Sheriff-Coroner Department, have been filed with the Board this day by the Director of General Services; and WHEREAS plans and specifications were prepared by the General Services Department; and WHEREAS the cost estimate for the initial construction contract is $170,000; and WHEREAS the Board has obtained the general prevailing rates of wages, which shall be the minimum rates paid on this project; and WHEREAS the Board hereby DETERMINES that the project is a California Environmental Quality Act (CEQA) Class l(a) Categorical Exemption; DIRECTS the Director of Community Development, or designee, to file a Notice of Exemption with the County Clerk; and DIRECTS the Director of General Services, or designee, to arrange for payment of the $25.00 handling fee to the County Clerk for filing the Notice of Exemption and a $25.00 handling fee to Community Development for administration processing costs. IT IS BY THE BOARD ORDERED that said plans and specifications are hereby APPROVED. Bids for this work will be received on August 5, 2004 at 2:00 p.m., and the Clerk of this Board is directed to publish a Notice to Contractors in accordance with Section 22037 of the Public Contract Code, inviting bids for said work, said Notice to be published in CONTRA COSTA TIMES . The Director of General Services, or designee, is directed to mail notices to the construction trade journals specified in Section 22036 of the Public Contract Code at least 30 days before the date of opening the bids. IT IS FURTHER ORDERED that the Director of General Services, or designee, is AUTHORIZED to issue bid Addenda, as needed, for clarification of the contract bid documents, provided the involved changes do not significantly increase the cost estimate for the initial construction contract. Orig. Dept.: General Services Dept. - Capital Projects Management Division cc: General Services Department Capital Projects Management Division Accounting File: 250-0407/B.4.1 File: 250-0407/A.5 1 hereby certify that this is a true and correct Auditor-Controller copy of an action taken and entered on the Community Development minutes of the Board of Supervisors on the K. Piona date shown. Sheriff-Coroner Department (via CPM) ATTESTED: JUNE 22, 2004 Herwit Engineering(via CPM) JOHN R. SWEETEN, Clerk of the Board of Superviso JA:amc unty Administrator H:\2o04\2500407\o4Loo7olab.aoc By_____ Deputy PROOF OF PUBLICATION (2.015.5 C.C.P.) STATE OF CALIFORNIA t I County of Contra Costa .. € am a citizen of the United States and a resident of the j County aforesaid; I am over the age of eighteen years, !!!!!! and not a party to or interested in the above-entitled matter. I am the Principal Legal Clerk of the Contra Costa Times, a newspaper of general circulation, printed and published at 2540 Shadeiands Drive in the City of Walnut Creek, County of Contra Costa, 94598. And which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Contra Costa, State of California, under the date of October 22, 1934, Case Number 19764. The notice,of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates,to-wit: June 25 all in the year of 20304 1 certify (or declare) under penalty of perjury that the foregoing is true and correct. Executed.at Walnut Creek, California. On this 25 day of June, 2004' ... .................................. Signature Contra Costa Times P 0 Box 4147 Walnut Creek, CA 94596 (925) 935-2525 Proof of Publication of: (attached is a copy of the legal advertisement that published) NOTICE TO CONTRACTORS Notice Is hereby given by order of the Board of Su- pervisors of Contra Costa County, that the Director of General Services will re- ceive bids for the famish- ing of ail labor,materials, equipment,transportation and services for: INSTALLATION OF TWO PRE-TREATMENT SEWAGE GRINDERS AT THE MARTI- NEZ DETENTION FACILITY, 1000 FLINZOR T#E UMI CORONER DEPARTMENT Budget Line Item No.4411- Aut5horization No. 0928- WH245B Sid proposals shall be sealed and shall be sub- mitted to the Director of General Services, CapitalProjectsManageme ManagemenrM t OfHee Avenue,Suit! IN,Marti' rm 24553-4711,an or be- fore the Sth day Of Augustt,, 2004 at 2M pm.and will be opened Inubtic imme- diately after the time due In the Capital Projects Management Division Con- ference Room 1220 Morel- lo Avenue,Sure 100,Marti- nez,California 94553.4711. The estimated construc- tion contract cost Is $170,000. The prime contractor for this project shall hold a valid Class A Contractor license. The work includes the ex- cavation and installation of two underground sew- agegrinders In pre- formed concrete vaults with electrical control pan- els, conduit, asbestos abatement, excavation, shoring and paving for the Sheriff- Coroner Depart- ment Each bid Is to be In accord- ance with the drawings and specifications on file at the Office of the Clerk of the Board of Supervi- sors, First Floor, County Administration Building, 651 Pine Street,Martinez, California. The drawings and specifl- cations max be examined at the County Capital Proj- ects Mo ement Division office, 1220 Moreilo Ave- nue, Suite 100, Martinez, California 94553-4711. Drawings and specifica- tions(not including docu- ments included by reference) and proposal forms. may be obtained by prospective bidders at the County Capital Proj- ects Management Division office,upon pa ment of a printing a service Charge to the amount of t25.t1B(sales tax included) which amount shall not be refundable. Drawings and specif cations may be or- denid sitlpping mall and han- diin fee of SS 00. Cash ?ureases are to be for f5e exact amount only. Checks shall be made pay- able to "The County of Contra Costa"and ma be malted to the Capital Proti- ects Management Divl- slon,1220 Morefio Avenue, Suite 100,Martinez,Califor- nia 94553.4711. The Capi- ta; Projects Management Division does not guaran- tee the arrival of the draw- ings and specifications in time for bidding. Draw- nggs and specifications will not be sent overnight mail. No partial sets will be lssued. Prospective bidders may obtain copies of the Coun- hoiders oon b co to ntracwpian at http;//www.co.co,nitra- costa.ca.us/depart/gsd/ gsanhold/ lanHoldList.htm (updat- ed daily at 4:00 p.m.), or by calling the Capital Proj- ect Management Division at (9253 313-7200 or by submitting a wriften re- quest via FAX No. (925) 313.7299. Requests for copies of the plan holders fog cannot be accepted af- ter 5:00 p.m.of the day be- fore the bids are due. Technical questions re- garding shoo d nbeadirected to the Capital Projects Management Division at telephone number (925) 313-7200. Each bid shall be made on the bid form issued with the specifications, and must be accompanied by bid security in the form of cash, a certified check cashier's check, or bla bond in the amount of to percent(10%)of the base bid amount made paya- ble to"The Gtounty o con- tra Cost". The bid security shall be i�Iven as a guarantee that the bldder will writer Into a contract If awarded the work,and will be forfeited by the bidder and re- tined by1±the County if the successful bidder refuses, neglects or falls to enter Into said contract or to fur- nish the necessary bonds and Insurance certificates after being requested to do so by the County. Bidders are hereby noti- fied that securities may be substituted for any monies withheld by the County of Contra Costa to ensure performance un- der the construction con- tract, in accordance with Public Contract code sec- tion 22300 and the General Conditions of the Con- tract. Such securities shall be valued by the County Treasurer-Tax Col- lector, whose decision shall be final. Also,types of securities which are not listed in Government Code Section 16430 or Public Contract Code Section 27300 must be approved as eligible for Investment under Public Contract Code Section 22300 by the County Treasurer-Tax Col- lector before bid opening. Unless such securltiws are prequailfied before bid opening,they shall not be accepted by the County as security. The successful bidder will be required to furnish a Payment Bond In an amount equal to one hun- dred percent (1006) of the Contract price and a Faithful Performance Bond in an amount equal to one hundred percent (100%) of the Contract price,said bonds to be se- cured from an admitted surety insurer authorised by the Insurance Commis- sioner to transact bust- ness of Insurance in the State of California. Each bond shalt be Issued on the form set forth In the spec!f!catlons. Bidders are hereby noti- fied that pursuant to the Statutes of the State of California or local law ap Blicabte thereto, the said oard has obtained the general prevailing rate of Fer diem wages and rates or legal holidays and overtime work In the local- ity in which this work is to be performed for each type of worker or mechan- ic required to execute the contract which will be awarded to the successful bidder. The prevalting rate of per diem wages is on file with the Clerk of the Board of Supervisors. The Contra Costa County Board of Supervisors en• courages op ortunities to develo a V support M!- noritiyy Business£raterppris- es (MBEs), Women 9us1- ness Enterprises (WSEs), Small Business Enterpris- es(SBEs),Local Business Enterprises iLBEs), and Disabled Veterans Busi- ness Enter pprises (DVBEs) by providin opfJortuni- ties for participation In the performance of con. struction contracts fl- nanced In whole or in part with County funds. MBE, WBE, SBE,LBE,and DVBE definitions and detailed in- formation are included In Division E of the Specifica- tions.wt_ prhrbid coniar encs 1 be eon ld Jniy 14, 2004, at 2200 p.m, In the Contra Gotta County Capita; Nolects Manory Ment tl;vww"office,t Morello Avenue,Suite 100, Martinez,Calitonfia. Dis- cussion will cover recom- mended outreach efforts, resources and any other subjects of Interest to attendees. Because of the restrictive nature of the facility,the tate will only be open for inspection by bidders on Julsr 23,2004 and July 26 2004. Inspection tours will be conducted on these dates by a representative of the County's Capital Projects Management Divi- Sian.Attendance at a site visit for the facility Is man- datory. Tours will boon promptly-at 10:00 am, starting at the sally-point entrance located on the west side of the Detention Center on Court Street. The said Board reserves the right to reject any and ail bids or arty portion of any bid and/or waive any Irregularity in any bid re- ceived. Bds may not be withdrawn for a period of biz days after the date set for opening thereof. BY ORDER Of THE BOARD Of SUPERVISORS Of CONTRA COSTA COUNTY JOHN SWEETEN, Clerk of the Board of Supervisors and County Administrator By:EMY L.SHARP,Deputy Dated:JUNE 2Z 2004 legal CCT 0 $ Pu6fl45 sh June 25,2004