HomeMy WebLinkAboutMINUTES - 04202004 - C2 TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: April 20, 2004 SUBJECT: Approve Project Contingency Fund Increase for the 3rd Street Enhancement Project, Project No. 0662-6R4320-03, Richmond area. District I Specific Request(s)or Recommendation(s)&Background&Justification I. Recommended Action: APPROVE project contingency fund increase of$20,000 for a new total of$119,204 effective April 20, 2004 in order to compensate the contractor, Ghilotti Construction Company, Inc. ,for unforseen drainage and utility conflict work. Il. Financial impact: The project contingency funds are currently insufficient to cover the increased cost. The increase in contingency funds will be funded by 51% Redevelopment Agency,46% Metropolitan Transportation Commission and 3% Local Road Funds. Continued on attachment: X yes SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: , 2VU4 APPROVED AS RECOMMENDED xx OTHER VOTE OF SUPERVISORS xx UNANIMOUS(ABSENT done) I hereby certify that this is a true and correct copy of an AYES: NOES: action taken and entered on the minutes of the Board of ABSENT: ABSTAIN: Supervisors on the date shown. Contact: Mike Carlson,(925)313-2320 APRIL 20 2004 cc: County Administrator ATTESTED:Div,: PW{Construction} JOHN SWEETEN, Clerk of the Board of Supervisors and cc: Auditor-Controller County Administrator Public Works Construction,P.Edwards - Design Transportation Engineering By Deputy Contractor PEab GAGRPDATAICONSnBOQ0044APPROVE CONTINGENCY 3RD STREET.DOC SUBJECT: APPROVE PROJECT CONTINGENCY FUND INCREASE FOR THE 3"° STREET ENHANCEMENT PROJECT, PROJECT NO. 0662-684320«03, RICHMOND AREA. DISTRICT I DATE: APRIL 20, 2004 PAGE 2 OF 2 111. Reasons for Recommendations and Background: Additional funding is needed to pay the contractor for increases and changes in the contract work.. The additional work was needed to modify the drainage system to avoid existing utility conflicts. Additional work was also needed due to grade differences and for subdrains in the planting areas. Other additional work that was required included modifications to the photoelectric streetlight controls,striping removal,welding anchor bolts to prevent bench and trash enclosure theft,and the modification (credit) of the irrigation and planting systems. The additional work costs exceed the project contingency fund. Approval of the project contingency fund is required to compensate the contractor for the additional work. 1V. Consequences of Negative Action: The lack of approval would prevent successful completion of this contract and preclude payment to the contractor for required work.