HomeMy WebLinkAboutMINUTES - 03092004 - C.14 TO: BOARD OF SUPERVISORS AS THE BOARD OF DIRECTORS, BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT CHAD / FROM: MAURICE SHIU,PUBLIC WORKS DIRECTOR DATE: March 2, 2004 SUBJECT: ACCEPT and APPROVE the Blackhawk Geologic Hazard Abatement Districts Reserve Study,Danville, California. (WO 5147), SPECIFIC RF-QUEST(S)OR RECOMMENDATION(S)k BACKGROUT AND JUSTIFICATION I. Recommended Action: ACCEPT and APPROVE the Blackhawk Geologic Hazard Abatement Districts Reserve Study, II Financial Impact: There is no impact on the County General Fund. The Blackhawk GHAD is funded through revenues generated by County Service Area M-23 (CSA M-23). 111. Reasons for Recommendation and Background: The CHAD expenditures are subject to periodic fluctuations based on weather conditions and resultant landsliding. Therefore, it is critical that the GHAD maintain a reserve fund in preparation for emergency situations. The reserve study provides an economic model to guide the budgeting process and assure the financial stability of the GHAD. Continued on Attachment:X SIGNATURE: `` M . RECOMMENDATION OF BOARD COMMITTEE _ .APPROVE _ATHER SIGNATURE (S): ACTION OF BOO"N MARCH 09, 2004APPROVED AS RECOMMENDED Xx OTHER I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. VOTE OF SUPERVISORS MARCH 09 2004 Xx U;NANIMOUS(ABSENT I & Its l ATTESTED: f AYES: NOES; JOHN SWEETEN,Clerk of the Board of Supervisors and County ABSENT: ABSTAIN: Administrator SE:emmB ,Deputy G:1CsrpDatnl5pDistlBoerd Ordersl20CA\0302-04 BO Reserve Siudy.doc y A. Orig.Dlv: Public Works(Special Districts) Contact: Skip Eppedy(313.2253) ec: County Administrator County Counsel Kleinfelder,Inc, SUBJECT: ACCEPT and APPROVE the Blackhawk Geologic Hazard Abatement Districts Reserve Study, Danville, California. (AVO 5147). DATE: March 2, 2004 PAGE: 2 N. Consequences of Negative Action: Without Board Approval, there is a risk that the CHAD will not make sufficient contributions to the Reserve Fund which may threaten the depletion of the fund in emergency situations. ...................... w ri'rt p i �e t f s i fk t t y BLAC=ABA� VK GEOLOGIC HAZARD EVIENT DISTRICT { k SERVESTUDY i November 18,2003 l i 3 s i { ij l I 1 i I E t 4 t i i P 1 i t {t{ r k z i i i STE.3.03 t � 4 4kLLE.Cit 94506 925.964.0825(w,) I i B LAC KHAW l GEOLOGIC HAZARD � � ; November 18,2003 ABATEMENT D i s T Rl C T Blackha wk Board of Directors , Contra Costa County Board of Supervisors c/o Skip c�xEpperly, GHAD Liaison IicHA D D. S r 1 .255 Glazier Drive # GENERAL MAxGr Martinez, CA 94553-4897 ' j KLEiNFELDE , INC. 4 I sunniCT: Budget Reserve Study Ladies and Gentlemen; In accordance with the direction of the Contra Costa County Beard of Directors the BlackhaWk Geologic Hazard Abatement District is submitting the attached Budget Reserve'Study. The purpose of this study is to povide a long term plan for building and maintaining the GRAD reserve fiord. The -eserve fund is intended to provide financing for emergency slide repairs and major slide repair projects resulting from s events not anticipated in the annual budget at..d for long term maintenance and replacement of GHAD assets. The determinatipn of the budget requirements for ,emergency repairs and subsequent major projects is based on the GHAD's history ;and published records of the frequency of l�ndsliding associated with rainfall intensitydata. The evaluation of the replacemerit of GHAD assets is based on past maintenance records and an anticipated service lie in an expansive soil environment. At best, the prediction of future rainfall events and associated landsliding is guesswork, but the attached reserve study has been based on a rational statical approach., i i IVery truly yours, # i � I iackhaWk Geologic Hazard Abatement District e ichard Short neral Manager le der, Inc. � I BsACVJiA Y PWA CIPW 5Tt.103 Ntav w,CA 94506eser ve Study � Page 2 925.964.0823 92=.964.0825(ro) # (; r f S S{ i Reserve Stutiv f k This report documents the results of a reserve Istudy performed for the Blackhawk Geologic Hazards Abatement District. The study provides an analysis of the repair and replacement requirements for the District's major asset components and the costs for emergency slope repairs and major landslid projects. The study recommends a long term funding plan to meet these obligations. The evaluation of asset r maintenance and repair costs and the frequency d magnitude of major slope repairs was performed by the GHAD staff. The fundi ig plan evaluation was prepared by John D. Beatty & Company. This study was pe formed in accordance with industry standards established by the Professional As dation of Reserve Analysts. The intent of this study is to provide the District with a plan to meet future obligations for major landslide repairs and asset maintenance. The essential elements of this study are: i 1. Identification of the major asset components that the district is obligated to maintain 2. Identification of rainfall hazards and est+ated cost of major repairs resulting from resultant landslides. 3. Current estimate of the useful life of eachIasset component 4. Current estimate of the remaining life ofh asset component 5. Current estimate of the replacement cost f each asset component 6. Current estimate of the total annual co bution necessary to maintain the major components 7. Current estimate of the amount of cash ireserves necessary to maintain the major components 8. Disclosure of the current amount of 4cumulated cash reserves actually funded 9. A general statement of methodology S } 'SCOPE This study is aligned with the district`s fiscal year and establishes July 1, 2003 through June 30, 2042 as the period of time for which reserve expenditures and reserve fund balances are projected. j !DESCRIPTION i./i` GHAD ASSETS l Y The GHAD assets include storm drain systems, A�58 drain systems, retention basins, orizontal drains, piezometers, settlement mon1tors, subdrain outlet pumps, and ebris benches.A brief description of each of the assets is presented below. I >BIACKHAWY PkAZA CIRCLE 5n,103 i Clrssltl .; A 9406 eserve StudyPage 3 925,964.0823 1 92,5>964A25 tEkX ( 1 q 3 r Storm Drain Systerm I i The Phad maintains about 200 catch basin' throughout the Blackhawk level pent. The operation of the catch basin inlets is critical for the collections of storm water runoff. Clogged inlet grates i' can I result in flooding of nearby propeOes. . .iter recent winter storms 't sevend inlet structures were modified to t enlark a the catchment volume and prevent effl DW as shown in this photo. i i B-58 Drain Systems Y _ The 58 concrete lined drainage ditches Y make up the major component of the hillsi erosion protection and storm rano collection system. The Blackhawk t >.A GHAT maintains 63,486 linear feet or over 1R miles of B-58 ditches. Because of the smelling and shrinkage of expansive soils 4nd associated slope creep ongoing r 1 V � ��a� '• �� ' '� l and replacement of 8-58 and ditches is required to keep them in operat on. i Ret�on.Basins r s g k } Y The Blackhawk development was k ,s con ted with six retention basins design d to collect and retain excessive storm runoff until the storm water drainae system has time to accommodate the full rainfall volume of a storm. Three of the ibasms are used for flood retention solely and three are integrated into the Country Club water features located on the got F course fairways. 3 5 BL1,M-RWK FL4zA CIRCA i 5'rr.103 OANWJLLE.CA 94506 Zeserve Shady Page 4 925.964.0823 925:964.0925 iigx? ? 7 _. . .............................................................. i Horizontal Drains Dut,ing the original project development ! ' grading operations and in the years afterward over 267 horizontal drains have been installed. Horizontal drains are installed in native hillsides to lower ry gro d water and increase slope sta `lity. .Annual inspection and maintenance of the outlets is necessary to �eep the drains flowing without ` f obs ruction. ` G Rezonteters j i " ti The depth to ground water has a great `#{ in#lu�nce on the stability of slopes. The 6, Gha d has installed numerous piezometers (grot nd water monitoring wells) at ` varix is locations where slides have been repai ed or are suspected. Currently, the GHAP monitors 75 active piezometers. Theaiezoeters are protected with a locke cap. ` i SeNentent Monitors Settlet6ent can occur as a result of various r causesE including fill consolidation and landsli ing. The GH ALD installs 4 r monis(ring gauges on structures so that a time re cord can be maintained to establish the rat" of settlement. 5 BIACDI WK PIA7A CIPCCE STE.103 DANMLL£,C.4 94506 teserve Study Page 5 925.964.0823 925.964.0825 fFAX) i 2 Subdrain Outlet Pumps i ' At ine location near Hole Number 1 on the'.--akes Course a subdrain is located 23 et below grade. In order to drain ih the iubdrain system an outlet pump was instilled. The CrHAD maintains the outl+' pump. j I 3 €Debris Benchers i Thro out the development debris J. bench s have been installed at the toe of F steep glopes that are located tight against privat+ property limits. Ile purpose of the debris benches is to provide a buffer zone for sion deposits to accumulate before they fl w onto private property. In some tt zes wooden wall is constructed to e the volume of the catchment area. Period ally the accumulated debris is . .K,. cleaned to restore the catchment volume. ""FALL 1L4ZARDANALYSIS i 4 The incidence of landslid%ng is directly correla i d to the seasonal amount and the `daily intensity of rainfall. Therefore, in order tc develop a model for GRAD slide repair expenditures an evaluation of the rainfall records and slide frequency was 1performed. Historical records at Blackhawk indicate that in winter seasons where the }total rainfall exceeds 1.5 times the average rain alI year the number and damaging effect of landslides increases. In a study performed by Professor Duncan at the ;University of California Berkeley in 1964 the records showed that the number of landslides in the Danville area of Contra Costa bounty increased dramatically after ;the intensity of rainfall rose above 3 inches per d4y. This data correlates closely with the experience of December 15, 2002 when over 60 slides occurred after 3.5 inches of rain occurred in an ll-hour period. <The criteria established for winter conditions tha would require expenditures above ;the normal budgeted amounts included years vith 1.5 tunes average rainfall and dears when over 3 inches of rain fell in one days The records for the last 100 years "how that the annual rainfall exceeds 1.5 time normal once every 12.5 years and 3- �inches of rain in one day occurs at a rate of once every 25 years. The expenditures 3 BLACWXWK PLAZA CIRCEF. I STE 103 Mwatf,CA 94506 �=r ve Study Page 6 925.:+64.0823 � 925.964M25(FAx) associated with these events were estimated based on recent events to be $3,000,000 for 1.5 times the normal year and$500,000 for 3-finches of rain in one day. MEMODOLOGY 1 A cash flow methodology was used to determihe the annual reserve contribution. I `The underlying premise of this reserve funding approach is to establish a contribution level that will allow the district to maintain a positive balance in the reserve fund while meeting all anticipated maintenance obligations. The cash flow method allows the district to achieve this goal without the unnecessary over funding of reserves. Also, as the interest earned on the Ireserve fund will not totally offset inflations projections were made using the carr nt inflation factor and an average interest rate on fully insured certificates of depos t. in prepaaiing this study, a comprehensive list o major components was developed ben, and information was compiled on the type, nu;1;Wage and cost of each of these components. In gathering this data, certain assumptions were made about costs, conditions; and future events and circumstances that may occur. Some assumptions inevitably will not materialize and unanticipated events and circumstances may } occur subsequent to the date of this report. The-efore, the actual replacement cosh and remaining lives may vary from this report aired the variations could be material. All life :expectancies were based on reasonable industry experience for equipment and material and, unless specifically noted, all components were in a reasonable and ordinary condition. For a component to be included in this study,theallowing criteria must be met:. 1. The maintenance of the component is the resperisibility of the district; 2. The maintenance of the component is not included in the annual operating budget; 3.The esiiinated useful life of the component is greater than one year, and 4.The estimated remaining life of the component is less than 50 year. 5. The repair of the landslide falls in the guidelines established by the Plan of a Control and the current GHAD Policy. This study is intended to reflect the estimated r`placement cost of the components and is not intended to project the actual cost f the work. when performed. This imitation is necessary, as it is virtually irnpo ble to predict with any degree of r ertainty;the myriad factors that will impact cos at a future date. Because of this 2 qualification, it is necessary for the results of th s study to be reviewed annually to reflect any meaningful changes in use or siguficant increases in labor and/or materials,costs. The funding for this study has ,a threshold goal of approximately 500,000. This means that the projected ending bilance for each fiscal year is at least 500,000, This margin can help to offset any unf reseen or out of the ordinary repair r replacement expenses. Additionally, it can be used in subsequent years as a source f funds Ifor reallocation of the life cycles shoWd the aging of any components elerate abnormally. ! 3$LACKfiAWK PLkZA CIRCLE S-m IG DArItnm CA 94506 ; serve Study Page 7 '925,964825(fu? ASSUMPTIONS The findings of this study indicate that it will be necessary to adjust the annual reserve contribution in order to meet projected expenditures and keep pace with 3 inflation.These findings are based upon the following: 1. Projected reserve fund balance as of July 1}2803 $707,076 2. Reserve contribution for fiscal year 2003/4... ` ..............................$250,000 3. Reserve contribution for fiscal year 2004/5 .... .................................$26'7,500 4.Assumed annual inflation rate ...................... ..................................... 2.0°1a 5. ,All " fter tax" interest earned on reserve fian investments will be retained in the reserve fund. 1 : CONCLUSIONS AND RECOMMENDATIONS R The results of this study as illustrated on the;following figures shows that it is feasible to meet the projected expenditures, provided that sufficient annual contributions are made to the reserve fund. Since]the predictability of future events is highly variable the reserve fund analysis should'be updated annually to account for the actual expenditures and amounts available r the reserve fund. You will note that the actual dollar amounts fro the 02/03 Fisc Year end balance differs from the study. the intent of the study is to provide a ethodology and guideline for the fund. The actual amount of contribution from e 03/04 budget will depend on the conditions of the winter months. 1 l i f f i 't i 1 d f i 3 i 7 i 7 I 7$LACKHMVK PLAZA CIRCLEi STE,103 i D vmu CA 94506 eserve Study Page 8 925 964,0823 921964:0825(Fax) x . ........ PROJECTED EXPENDITURES al+RWK PLAZA QWI-t SYt,103 am,CA 94506 Reserve Study Page 9 25.964.4823 i I } N a i r- i N N N oo i F e H} N N Ij{r 7 h fJ tV ! M !+ en O S N .�} GS iV O %n iC7 f4 W! IN � V144 t£: y erg .+ OBD N rN�e e��1 sn l N I ♦rri N '� � � � � � � i y��yi{ !�M N sma 1�t � ^� N M W •S' VY tCi t� bti ixw tit G7 .�-. t" .N- � � 7 � („� t43 P QI E eq p h3 E }4y h p p 7i7i i w ac ! 1 M In V7 �D O C7 i I!I! } { i Ntn <t M AY Wi cv w �'i ra oho" 00'. M M � t 3 1 m N iaw ams (� p � in N N rhe W rpr b V1 N N r i 1 Q Or e4 x It A. �.t 3;, � �• r.rrn � .r � �c �ir• naN� o. c> h�' cv � �M tp�q � (�j �br, [�� t i 3 i r i 1 p{# { ! f WCC E Ili C*4 00 ! ( I 1 <7 w 7Fff N t1f3 V" iN`- M .N—i t7 bio 47 Od tV N ti !1 1 � V N NN6 C} v N N v N N W 00 V' YY 4 CS C7 1`� F �]! IIi 49 67 C IA G O t^i O t11 �D N � N N N C. v7 h O h O i .0.F i ! o W J Izo ` ` � lo •� �; � �j ranlppsrv� v5 � r� oarnex � ,' N � rnaY �Q {,} gar- [��. i s { � I t � I N tV G 6 O 0, � � 1 f i ma i rn � i v j � t7. 11i N `o 4o b r e vi x N � en M �pppj Ci•C7 �. '� I V'1 Oi 7 I!I! M m f i C7 • � C4 M O ? { t s7^ W iQ fz om Lti YV! tiM M N �ew PC 83i 8, MM 1 } yy� m c a " 4k . � � � � . FLING PLAN � |� f \ | � | \ [ � �\\ atACPLAZA OPCLr S,mle � A CA 94506 Reserve Study Page R (§ 925.964.0823 { ® b vs t a 00 6 f f$ N N M 00 idG fqh O i Ef' C-t M 6 :S 00 � O CM'jT VSD W �••' � en M f f O G7 W'M 11:1 Ci tpY t,(j N N f`t 17 vMm �D j a °1 ep ( � C'� i•� u7 � `�C Cwt � � .+/7.. N u ria ° Of 0 h m a 1 +> • a a a cr rn w S i , rte•- K� r` &I v N N v-. N .-. d E t G G5 d'1 r" Clicx IWT 6 n ca � 1 1 N Yrii O M. 00 1 j 1 f 1 O C7 Chi tv7 f' l 1� I pq pg 8 O G� 4 O N i 1 v b marCNJ � { E C`• N 00 DC! ff V f tt! 1 N M f i I M� 0l 6e a � a 1 PC i it i i i f _ _........... __. _.. _ ...................................................................... .................................... O C) C7 CC �" {( N N M C CT 00 ,Q1�• j 7 i' 00 FV 00 � C9 � 3 en v N N C-4 ti 3 t { e•i tt t i y t N eNs «mss N m cis o o 1v m G7 i`� Cr N OY C> 0% t v N N O C> A M � . • I Y M DO CK Ch N C3 _M C7 t.7 C) C3 00 • I b C> Cin tV iT .... f-t � rV f � W tl0 C7 cn M � CS CY G v� v} M t i N N F N 0� �L M • v C4 N N f , Wi .� I i•- t•-•• tT c•5 niy G O G 9pf i vy In � pf +C V7 m 0 C7 C7 0 f- Ch CS CS =�^,• O 5 � i O I ti h a 1 i 3 ..-. N N R 80 h w tY4} h+ Z7 m t4 A 02 CA i I I I i # S M VN+Y I L'J O M Gf 45 d 6 o 19 N � t i M (� a, 0� 00 t3 .M.+ M 4 C3 M M m J C4 C4 r I 6i a aid vi tt 71j ! a8 In a7 C^ 00 00 ' f ! i b M Nva OLS ri { eq Lri-i ol M MfTi c7 Cy b .mow 1 i C4 �, tT j, N (VAS{ M 00 In N t�, i7rs In i In a M e4OIL i a vs i 'n a+p I i I a 77 N I Vri N F C 3 yr +nci WW of vi VY { T_ PO g t v Ln W 0G riai` W v N O Yu b tl p ( N N I CK �. t � F d M M C7 t7 Cs pp N ri w i 3 v N N 00 N N M e ol 0\ _ ri a to M VY C4 000 t ko O G v M C:a C O `� 8ri6 llq a? o c °: y h ri ri M `O M M G} C'� C vS W OC N' C3 > Inh til 11 IK fN i � I " i rev ri N r oD m f S ' 00 In { N({# ooI � V` sY ri M M "r 6 Q ri h 1 I m Vri1� N d b b N N � 06 A- ' Q6 YY M i m m O MMS O G� C tri'i N i ; N r &' M S 3 1 � � � � [•.• p9 s w cx r s i i I i �m COMPONENT QUANTIFICATION 5 BLACK€IAWK PLAZA CIRCLE STE.143 DA. ILLS.Ck 94506 Reserve Study Page 19 925,964-0823 ............................................................................... ........................................... t ACCRUED L.IABILI'TY I S BLACMA VY PLATA CIRCLE STE.103 DAN,vuu.CA 44506 Reserve Study Page 21 925.964,0823 u on coa uy' <5' c°4o a C c; ca w as rs r- 0 CA m 00 00 wl r"rn n za c r vs CIZ on +`+i cam_ m o cx es u o ra Ar, t4 do tqa 6p� p cI� m w Y7 seri x[s t�+y g e$ r4 Q.. ,.K .mow w «�+ .- CD i tts 6 s�Ty w P C� O GJ CJ O CA O tt� 3 in Yn 3 +n v� vs cs srs �• 1/5 5 , P�3 _Z c CC ` z L"«' kms Gi pt3 7 , Cx` i 1 y o � � 3 C5" tit CD o � a 88 i M i ° xx x 4 a 4 a ]o s ego g G4 NQ." M M N 0 .... .S ... w tri Ci ti+ w ��' CV Y`1 L I to N o f N C4 i � S � o coo a � 1 78 . in A z p "^+ fi4M � ECW3 �C c-� oo �icnc � cay�gr-, v ply � ws � j $# i S 4