HomeMy WebLinkAboutMINUTES - 03092004 - C.101 THE BOARDOF SUPERVISORS
CONTRA COSTA COUNTY,CALIFORNIA
Adopted this Order of March 9, 2004,by the following vote:
NOES- Isom
ABSENT: y �scrs Gioia mad DeSaulnier
ABSTAIN y
SUBJECT: Approve Plans and Specifications for the project,
'U grade USS Systern, 30 Douglas Drive,
Martinez for the Department of 1rafor .atior
`technology
(Cp4€13-68)
Budget Line Item.No. 4405-4330
%mthorization No. 0928-WE-133011
WHEREAS plians and spec5ficatio;ns for the project, :upgrade UPS System, 30 Douglas
Drive, Martinez for the Depa-ft en t of Thform ation Teel :logy, have been filed with the Board
this day by the Director of General Services; aid
WHEREAS pars and specifications were prepared by Zeiger Engineers, Inc.; and
WHEREAS the cost estimate for the initial construction contract is 211,700s and
WHEREAS the Board has obtained the general prevailing rates of wages. which shall be
the minimum rates paid on this project; and
WHEREAS the Board hereby DETE II S that the project is a California
Environmental: Quality Act (CEQA) Class I a Categorical Exe: ptio ; DIRECTS the Director of
Community Development, or designee, to file a Notice of Exemption with the County Clerk; and
D C"rS the Director of General Services, or designee, to arrange for payment of the $25.00
h. dling fee to the %_ - ty Cle for filing the Notice of Exemption and a$25.00 handling fee to
Community Development for administration processing assts.
IT IS BY THE BOARD ORDERED that said plans and specifications are hereby
APPROVED. Bids for this work wr11 be received on April 15, 2004 at 2:00 p.m., and the Clerk
of< is Board s directed to publish a Notice to Contractors in accordance Frith Section 22€337 of
the Public 6ortract Code, inviting bids for said work, said Mortice to be nublished in
r-ra The Director of General Services, or
designee, ;s directed to imail notices to the construction trade journals specified in See -on, 22 336
of the dub is Contract Code at least 30 days before the date of opening the bids.
IT IS FURTHER ORDERED that the Director of -e-neral e-�nrices, or designee, is
AUTHORIZED to issue 'yid Addenda, as needed, for clarification of the contract bid
documents. provided the involved changes do not significantly increase the asst estimate for the
initial co structio contract.
`•'Ue and car?ecl
ye '�C µ � �
E< c%,i ,' es r, and cantered`� n' the
data-
rg H,N,1 S £'+E ET E N C'
s of
Boa,
d
Adt''�,�9str or
6:� ���,.rij S'� r.7 w. ,oma 'a+✓.l.S ea� C . �a✓.
Orifi Dept General Services Dept, a Capital Projects Manage rpt b3;vis or
✓ro
/"d ey
Cc: General services Departrnen;y
Capital Projects Managernent Division rE
Accou rating
Vise: 250-,0414/A,5
250=0414/B.4.1
Aud-itor®Controller
Community Develop en
K. Piona
Department of Information Technology(via CPM)
Zeiger Engineers, ne. (via CPM)
:2004\25,0414»4,:,f 40',;'a.aor
ot;ce €s hereby given by order of the Board of S-,peTv€sops of Contra Costa County, that the
Director of General Services will receive bids fir the funnishing of all labor, €materials,
e € p e?t, transpwrtat€or;.and services for.
UPGRADE UPS SYSTEMS, 30 DOUGLAS DRIVE, INEZ FOR THE
DEPARTMENT OF INFORMATION TECHNOLOGY
Budget Line lte ``o, 4405-4330
Authorizationo. 0928-VF 330
€d gregosals shall be scaled and shall be submitted to the Director of General Services
LCR€tal Protects Management Division Of eem 1220 Morello Avenue Suite 100 Martinez
ez
4 p47f f r before the 15th day of A —
Aril, 2004 at 2 02.m., and will be opened
pub"He €n red€ately after the time due i-n the Capital prgjeets Management Division Conference
Room, 1220 Morello avenue, Site 100, Martinez, California 94553-4711,
The estimated const etion contract cost is $211,700.
The prin€e -contractor for this project shall hold a valid Mass B General Building Contractor
lice,
The =moek- ineludl es expansion of an interior room in an existing warehouse space and installing
an uninterruptible power system, associated electrical, mechanical and general building work for
the never space in conjimetion witli the existing facility.
Each. yid is to be in accordance with the drawings and specifications on file at the Off-cc of the
"er< of the Board of Supervisors, First Floor, Cosnty administration Building, 651 Pine Street,
Martinez, California.
The drawings and specifications may be examined at the County Capital Projects Management
ivis€ f€ee, j 2 0 Morellos Avenue, Suite 100, Matilnez, California 94553-47:.1. Dravai�gs
and specifications (not inchddin2 doeurnents included by reference) and proposal forms, may be
obtained by prospective bidders at the C vnty Capital Projects Management Division office,
upon payer t of a printing and service charge in the amount of$25.00 (sales tax included)
which amount shall not be refundable. Drawings and specifications may be ordered by €€all for
an additional shipping and handling fee of $5.00Cash purchases are to be fbr the exact
amount only. Checks shall he made payable to "The Co,,Inty of Contra Costa`' and may be
mailed to the Capital Projects Mo—nagernent,Division, 1220 Morello Avenue, Site 100, Martinez,
Calif-r-nia 94553-4711. The Cap€tal Projects Management Division doses not guarantee the,
w:rival of tide drawings and specifications ir. tirne for bidding. Drawings and spec f€ea ions will,
€ of be sent overnight mail. No partial vets will be issued.
Prospective bidders may obtain copies of the County's log of contractor plan polders on the web
at . . 4ed/ lan1-1oldL1st ht€ pdated Baily at 4:00
p.€ €. r y calling tape capitalrjects aage €ent vision at ( 25) 313-7200, or by
s € itti€sg a written req€est via € . 25;a 313-7299. Requests for copies of the plan
ho lig caret - accepted after 5;�3 p. . ft1 e day before the lids are due.
Technical €uestions regarding the contract documents should be directed to the Capital Projects
? anage-n ent Division at telephone =nger(925) 313-7200.
Each bid shall be made or,the bid form issued w.th the specifications, and mist be accorr J&-hied
try bid security in the fora of cash, a certified check, cashier's check, or bid bond in the ainount
often percent Ju of the base bid amount,nt, rade payable to "f heo ntI ; o� "�ssI
The bid security shall be given as a guarantee that the bidder will enter into a contract if awarded
the work, xid will be forfeited by the bidder and retained by the County if the successful bidder
refi ses, neglects or fails to eater into sa=d contact or to f1rnish the necessary bonds and
Insurance certificates after being reou-sted to do so by the Board of Supervisors of Co,tra. Costa
County.
Bidders are hereby notified that securities niay be substituted for any nionies withheld by the
County o-;" Contra Costa to erasure oerfo. ance under the construction contract, in accordance
with Public, Contract Code Section 22300 and the General Conditions of fne Contract, Such
securities shall be valued by the County Treasurer-Tai. Collector, whose decision shall be fnal.
Also, types of secimties which are not listed ir. Government Node Section 16430 or Public
Contract Code Section: 22300 rest be approved as eligible for investmentn- der Public Contract
code Section 22300 by the Courity Treasa°er-Tax Collector before bid opening- Unless such
securities are prequalified before bid opening, they shat' not be accepted by the County as
secraty,
The successful bidder will be required to fainish a Paynent Bond in ars arnount equal to on-,
h—dred percent `100%) of the Contract price and a Fait. Per-fFonnance Bond in ars arnount
eoual to one hundred percent (100%) of the Contract price, said bonds to be secured nom- an
admitted surety insurer authorized by the hisur^sacs Commissioner to transact business of
i sura ce it the State of California. Each bond shall be issued on the form set forth it the
spocis catior<s.
Bidders are hereby notified that p€rsi ant to the Statutes of the State of Californ=ia, or lova: law
appaicable thereto, the said Board has obtained the general prevailing rate of per die wades and
rates for legal holidays and overtime work in else locality in which this work is to be performed
for each type of worker or mechanic required to execute the contract which will be awarded to
the successPai bidder, The prevailing rate of per dem wages is on file with the Cler`� of the
Board of Su;3ervisor&
The Contra Costa Co-unty Board of Supervisors ene-ourages opportunitiesto develop and support
minority Business Enterprises (MBEs), Women Business Enterprises ('WBEs), Striall Business
Enterprises (SBEs), Luca_ Business Ente orrises (:.,BEs), ars.: Disabled Veterans Business
Ente rises (DVBEs) by providing opportunitie `fts for pacapation in the oerforma ce of
constriction contracts financed in whole or in pard with. County fU ds, E, VE, SBE, LLE
and DVBE definitio-ns and detailed information are included in Division E of the Specification s.
A pre-bid conference will be held on March 24, 2004, at 2.00 pari., in the Contra Costa
County Capital Projects Management Division office, 1 220 Morello Avenue, Suite 100,
€€art , a fo aA sc ss o w l ^ewer reco ended outreach efforts, resources aro any
other s .biects of interest to attendees,
Because of the restrictive nature of the faciiity, the site wills be open for inspection by
bidders on Tuesday April 6, 2004, inspection tours will be conducted on this date by a
representative of the County's Capital Projects Management Division, Tours will begin
promptly at -00 a.m., starting at the first floor entry lob'oy at the 30 Douglas Drive, Martinez,
The said Board reserves the right to refect any and all bids or any portion of any bid and/or waive
any irregularity in anv bid received. Bids may not be withdrawn for a period of 60 days after the
date set for opening thereof
BY ORDER OF THE BOARD OFUTPER ISORS
O+''F. CONTRA COSTS COQ aY
JA.%� 4.:-YY ETENI 3
Clea k of the Board ofpervisors
&qd C -nty Adrnimistremr
eput y
mar&h 2OC4