Loading...
HomeMy WebLinkAboutMINUTES - 03232004 - C79 TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: March 23, 2004 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on August 5, 2003 regarding the construction of the Asbury Graphite Wastewater System as recommended by the Public Works Director, Hercules area. [SCH No. 95043029] (Contra Costa Transportation Authority Funds, 100%) (District 11) Project No.: 4660-8X4152. SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION 1. recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on August 5, 2003, pursuant to Public Contract Code Sections 22035 and 22050,to construct a wastewater system for Asbury Graphite, Hercules area. Continued on Attachment: X SIGNATURE: ,..-#ECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE --APPROVE OTHER SIGNATURE(S): r ACTION OF BOA r ON March 23, 2004 APPROVED AS RECOMMENDED X OTHER I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board VOTE OF SUPERVISORS of Supervisors on the date shown. X UNANIMOUS(ABSENT none } AYES: NOES: ABSENT: ABSTAIN: ATTESTED: March 23, 2004 MH:JP:j JOHN SWEETEN, Clerk of the Board of Supervisors G:1GrpData\Design\BOARD ORDERS\2004\Asbury Emergency5.docand County Administrator Orig.Div: Public Works(Design) Contact: J.Pulliam 313-2165 c: M.Hollingsworth,Design y. K.Laws,Real Property By Deputy SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on August 5, 2003 regarding the construction of the Asbury Graphite Wastewater System as recommended by the Public Works Director, Hercules area. [SCH No. 95043020] (Contra Costa Transportation Authority Funds, 100%) (District 11) Project No.: 4600-6X4152. DATE: March 23, 2004 PAGE: 2 II. Fiscal impact: The total estimated contract cost is$400,000,which is 100% reimbursable from the Contra Costa Transportation Authority. 111. Reasons for Recommendations and Background: A. On August 5, 2003, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to construct the Asbury Graphite Wastewater System. B. Repair status: Construction of Phase 1 by Sebastopol Construction is completed. The design for the final phase, Phase 2, is currently being reviewed and prepared for advertising. Advertising is scheduled for April 2004. IV. Consequences of Negative Action: Non-concurrence of the above recommendation will delay replacement of the wastewater system until the later half of 2004 resulting in the increased potential for the failure of the existing system, which would cause effluent contamination of the surrounding area and off-hauling up to 750 gallons per day of effluent to an appropriate disposal facility.