HomeMy WebLinkAboutMINUTES - 06242003 - C.8 IIII1 IIS I SII II III
Wi
1111 II ��IIII I II II��II
CONTRA COSTA Cc Recorder Office
Recorded at the request ob STEPHEN L, IJE'IR, Clerk•Recorder
Contra Costa County DOC— 2@03-•03003 44-00
Hoard of Supervisors Wldtl+t�d�
Return to: 4Y, AIN 25, 2003 10:05:19
Public Works Department F1 $0.X00 ,r nay
Engineering Services Division !4l Pd $0,00 (�i r•ilV� ��
Records Sections
1rC/R9/I-I
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adapted this Resolution on June 24, 2003 by the following vote:
AYES: SUPERVISORS GIOIA, UILKEMA, AND DESAULNIER
NOES: NONE
ABSENT: SUPERVISOR FEDERAL GLOVER
ABSTAIN: NONE
DISTRICT III SEAT VACANT RESOLUTION NO.2003/413
SUBJECT: Approving Deferred Improvement Agreement along Danville Boulevard for Minor
Subdivision 18-01,(APN 197070-007), Alamo area(District III).
The Public Works Director has recommended that he be.authorized to execute a Deferred
Improvement Agreement with Clyde Miles Construction Company, Inc., as required by the
Conditions of Approval for Minor Subdivision 18901. This agreement would permit the deferment
of construction ofperrnanent improvements along Danville Boulevard which is located in the Alamo
area.
IT IS BY THE BOARD RESOLVED that the recommendation of the Public'Works.Director
is APPROVED.
G:\GrpData\FngSvciBO\2003\6-24-03\MS I8-01 B0-12.doc I hereby certify that this is a true and correct copy of an actin
BY= taken and entered on the minutes of the Board of Supervisors
Originator: Public Works(ES) on the date shown
Contact: Teri Ric(313-2363)
cc: Recorder(via Clerk)then PWRecords ATTESTED: JUNE 24,_ _2003
Current Planning,Community Development JOHN SWEETEN, Clerk of the Board of Supervisors and.
County Administrator
By yam' ,Deputy
RESOLUTION NO.2003/ 413
Recorded at the request of:
Contra Costa County
Public Works Department
Engineering services Division
Return to:
Public Works Department
Engineering services Division
Records Section
Area: Alamo
Road: Danville Boulevard
Co.Road No:5301A
Subdivision: MSOI0018
APN: 197-070-007
DEFERRED IMPROVEMENT AGREEMENT
(Subdivision: MS010018)
THESE SIGNATURES ATTEST TO THE PARTIES'AGREEMENT HERETO:
CONTRA COSTA COUNTY OWNER: (See note below)
Maurice M. Shiu, Public Works Director Clyde Miles Construction Co., Inc.
2241 Harbor Street, Suite E
Pittsburg, CA 94565
BY: f1 �.. B
Clyde E. Miles, Sole Owner
RECOMMENDED FOR APPROVAL:
By:
e ing Services Division
F RM APPROVED: Victor J. Westman, County Counsel
(NOTE: This document is to be acknowledged with signatures as they
appear on deed of title. If Owner is incorporated, signatures must
conform with the designated representative groups pursuant to
Corporations Code¢313.)
(see attached notary) j
1. PARTIES. Effective on k __ (, '; the County of Contra Costa, hereinafter referred to as
"County"and Clyde Miles Construction Co.,Inc.hereinafter referred to as"Owner"mutually agree and promise as follows:
2. PURPOSE. Owner desires to develop the property described in Exhibit"A"attached hereto and wishes to defer construction of permanent
improvements,and County agrees to such deferment if Owner constructs improvements as herein promised.
3. AGREEMENT BINDING ON SUCCESSORS IN INTEREST. This agreement is an instrument affecting the title or possession of the real
property described in Exhibit"A." All the terms,covenants and conditions herein imposed are for the benefit of County and the real property or interest
therein which constitutes the County road and highway system and shall be binding upon and inure to the benefit of the land described in Exhibit"A"and
the successors in interest of Owner. Upon sale or division of the property described in Exhibit"A",the terms of this agreement shall apply separately to
each parcel,and the owner of each parcel shall succeed to the obligations imposed on Owner by this agreement. Upon annexation to any city,Owner,or
those who succeed him as owner of the property described in Exhibit"A,"shall fulfill all the terms of this agreement upon demand by such city as though
Owner had contract with such city originally. Any annexing city shall have all rights of a third party beneficiary.
4. STREET AND DRAINAGE IMPROVEMENTS:
A. The improvements set forth in this section may be deferred by Owner and shall be constructed when required in the manner
set forth in this agreement. The deferred improvements required by County Department of Public Works are generally described on Exhibit°B"attached
hereto. Each of said improvements relate to the use,repair,maintenance or improvement of,or payment of taxes,special assessments or fees on,the
property described in Exhibit"A."
B. When County Public Works Director determines that there is no further reason to defer construction of the improvements
because their construction is necessary for the public health,welfare and safety and/or is necessary to the orderly development of the surrounding area,he
shall notify Owner in writing to commence their installation and construction. The notice shall be mailed to the current owner or owners of the property
as shown on the latest adopted County assessment roll. The notice shall describe the work to be done by Owner,the time within which the work shall
commence and the time within which the work shall be completed. All or any portion of said improvements may be required at a specified time. Each
Owner shall participate on a pro rata basis in the cost of the improvements to be installed. If Owner is obligated to pay a pro rata share of a cost of a
facility provided by others,the notice shall include the amount to be paid and the time when payments must be made.
5. PERFORMANCE OF THE WORK. Owner shall perform the work and make the payments required by County as set forth herein or as
modified by the Board of Supervisors. Owner shall cause plans and specifications for the improvements to be prepared by competent persons legally
qualified to do the work and shall submit said improvement plans and specifications for approval prior to commencement of the work described in the
notice and to pay County inspection fees. The work shall be done in accordance with County standards in effect at the time improvement plans are
submitted for approval. Owner agrees to commence and complete the work within the time specified in the notice given by the Director of Public Works
and to notify the County at least 48 hours prior to start of work. In the event Owner or his successor(s) in interest fails to construct any of the
improvements required under this agreement,County may,at its option,do the work. A lien is hereby created on all property described in Exhibit"A"for
the cost of such work. If County sues to compel performance of this agreement,to recover the cost of completing the improvements or to enforce the
aforementioned lien,Owner shall pay all reasonable attorney's fees,costs of suit and all other expenses of litigation incurred by County in connection
therewith,and said attorney's fees,costs and other expenses shall also become a lien on the property described in Exhibit"A". If the property described in
Exhibit"A" is subdivided at the time said liens are imposed,the amount of said liens shall be divided proportionately among the various parcels.
Permission to enter onto the property of Owner is granted to County or its contractor as may be necessary to construct the improvements covered by this
agreement.
6. JOINT COOPERATIVE PLAN. Upon notice by County,Owner agrees to cooperate with other property owners,the County,and other public
agencies to provide the improvements set forth herein under ajoint cooperative plan including the formation of a local improvement district, if this
method is feasible to secure the installation and construction of the improvements.
7. REVIEW OF REQUIREMENTS. If Owner disagrees with the requirements set forth in any notice to commence installation of improvements,
he shall,within 30 days of the date the notice was mailed,request a review of the requirements by the Board of Supervisors of County. The decision of
this Board shall be binding upon both County and Owner.
8. ACCEPTANCE OF IMPROVEMENTS. County agrees to accept those improvements specified in Exhibit"B"which are constructed and
completed in accordance with County standards and requirements and are installed within rights of way or easements dedicated and accepted by resolution
of the Board of Supervisors. Owner agrees to provide any necessary temporary drainage facilities,access road or other required improvements,to assume
responsibility for the proper functioning thereof, to submit plans to the appropriate County agency for review, if required, and to maintain said
improvements and facilities in a manner which will preclude any hazard to life or health or damage to adjoining property.
9. BONDS. Prior to County approval of improvement plans,Owner may be required to execute and deliver to the County a faithful performance
bond and a payment bond in an amount and form acceptable to County to be released by the Board of Supervisors in whole or in part upon completion of
the work required and payment of all persons furnishing labor and materials in the performance of the work.
10. INSURANCE. Owner shall maintain, or shall require any contractor engaged to perform the work to maintain, at all times during the
performance of the work called for herein a separate policy of insurance in a form and amount acceptable to County.
II. INDEMNITY. Owner shall defend,indemnify and save harmless the County,it's officers,agents and employees,from every expense,liability
or payment by reason of injury(including death)to persons or damage to property suffered through any act or omission,including passive negligence or
act of negligence,or both,of Owner,his developer,contractors,subcontractors,employees,agents,or anyone directly or indirectly employed by any of
them,or arising in any way from work called for by this agreement,on any part of the premises,including those matters arising out of the deferment of
permanent drainage facilities or the adequacy,safety,use or non-use of temporary drainage facilities,or the performance or nonperformance of the work.
This provision shall not be deemed to require the Owner to indemnify the County against the liability for damage arising from the sole negligence or
willful misconduct of the County or its agents,servants,or independent contractors who are directly responsible to the County.
Subdivision: MS010018
Danville Boulevard—Deferred Improvement Agreement
EXHIBIT "A"
All that real property situated in the County of Contra Costa, State of California, described as follows:
All of Parcels A,B,and C designated as shown on the parcel map of Subdivision MS010018,on file at the
County Recorder's Office as follows:
Mate:
Soak:
Page:
Subdivision: MS010018
Danville Boulevard—Deferred Improvement Agreement
EXHIBIT "B"
IMPROVEMENTS
Improvements required by Contra Costa County Community Development Department and the County Ordinance
Code as a condition of approval for the above-referenced development are located along Danville Boulevard for
Parcels A, B, and C, described in Exhibit "A":
1. Approximately 185 linear feet of curb, face of curb located 10feet from the ultimate right of way line.
2. Approximately 185 linear feet of 4-foot 6-inch(1.5 meter)sidewalk,width measured from curb face,built
monolithic with the curb.
3. Approximately 1,670 square feet of street paving to pave between the existing pavement and the lip of
gutter.
4. Necessary longitudinal and transverse drainage.
5. Necessary street lights. The final number and location of the lights will be determined by the County Public
Works Department.
6. Temporary conforms for paving and drainage as may be necessary at the time of construction.
7. Submit,improvement plans to the Public Works Department,Engineering Services Division,for review;pay
an inspection and plan review fee and applicable lighting fee.
CONSTRUCTION
Any necessary relocation of utility facilities shall be the responsibility of the owner or his agent.
The construction of the above deferred improvements shall begin as outlined in Item 4B of the agreement or when
either of the following occurs:
I. Danville Boulevard is constructed to its ultimate planned width by the County or by an assessment district.
2. Frontage improvements are constructed adjacent to the subject property.
It is the intent at this time that the"pro rata basis"of costs,as specified in Item 4B of the agreement,shall mean that