HomeMy WebLinkAboutMINUTES - 03112003 - C57 e-57 TO: BOARD OF SUPERVISORS CONTRA y * FROM: GEORGE ROEMER _ ' COSTA 'tt Senior Deputy County Administrator COUNTY DATE: MARCH 11, 2003 SUBJECT: JUVENILE HALL EXPANSION PROJECT SPECIFIC REQUEST(S)OR RECOMMENDATION(S)AND BACKGROUND AND JUSTIFICATION RECOMMENDATIONS): 1. ACKNOWLEDGE receipt of Report from the County Construction Administrator regarding construction status at the Juvenile Hall Expansion project. BACKGROUND: At its September 19, 2002 meeting, the California State Board of Corrections granted Contra Costa County a nine month time extension for completion of the Juvenile Hall Expansion. The current Grant completion deadline is March 31, 2004. This extension was conditioned on Contra Costa County submitting written progress reports to the State Board on a quarterly basis and attending each subsequent State Board meeting until construction completion. The attached report provides the information requested by the State Board's staff. Additionally, this report responds to the Contra Costa County Grand Jury Report#0104 wherein the Grand Jury recommends that the County Construction Administrator provide written quarterly progress reports to the Board of Supervisors and the Probation Department. Continued on Attachment: Yes Signature: Recommendation of County Administrator Recommendation of Board Committee Approve Other s Signature(s)"', t Action of qaon: MARCH 11, 2003 Approved as Recommended: xx Other VOTE OF SUPERVISORS _X;< UNANIMOUS 1 HEREBY CERTIFY THAT THIS IS A (ABSENT none ) TRUE AND CORRECT COPY OF AN AYES: NOES: ABSENT: ABSTAIN: ACTION TAKEN AND ENTERED DISTRICT III SEAT VACANT ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. Contact: George Roemer(925-335-1055) Attested: MARCH 11, 2003 cc: John Sweeten, County Administrator John Sweeten, Clerk of URS the Board of Supervisors Steve Bautista, County Probation Officer and County Administrator By: r'�' , Deputy Contra Costa County Juvenile Hall Expansion Progress Report for the State Board of Corrections March 2003 Prepared by URS Construction Managers Project Status The project is divided into three phases. Phase one includes the relocation of the police and public entrances to the existing hall along with all site work required to construct the new parking areas for the facility. Phase two includes the construction of the Administration, Intake, Sallyport, Kitchen/Laundry, (A, B, C, & S) and Housing units (D, E, F, &G)(see attached Juvenile Hall Expansion area diagram). Phase three includes finalizing work to the existing facility to meet building code requirements for occupancy. The contractor substantially completed phase one and continues to work on phase two. Phase Two Progress Administration, Intake,Kitchen/Laundry, and Sallyport Areas (A, E,C, and S) As of February 28, 2403, construction of the Juvenile Hall Expansion is approximately 55% complete. The roof is installed over the Administration, Intake, Kitchen/Laundry and Sallyport. The entire first floor of the Administration wing is painted. Second floor steel stud and gypsum board walls for the classrooms and the Health Services Department are complete. Glazing was installed along the exterior window frames and the Exterior Insulation Finish System (EIFS) is complete. Horsing Units (D, E, F, and G) The first floor cells and first floor tiers are complete in areas "D" and "E"of the Housing Units. Additionally, the second floor columns and concrete block cells are in place. The underground utilities, footings, slabs on grade, first floor cells, and tier slabs are complete in areas "F" and "G". Framing for the second floor slabs in this area is under way. The electrical switchgear and the transformer are installed and still await PG&E hook-up. The Construction Manager continues to monitor the Contractor's Storm Water Pollution Prevention Plan(SWPPP) and this monitoring continues through the end of March. Contra Costa County Juvenile Hall 2 of 8 Schedule Activity Actual/Estimated Date Grant Award May 20, 1999 Notice to Proceed May 8, 2001 Building Completion January 2004 Grant Deadline March 2004 After absorbing a four to six month delay during the first year of construction, the contractor continues to construct the improvements in accordance with the updated master schedule. This schedule indicates a substantial completion before the grant deadline of March 2004. The attached site photographs demonstrate progress as of February 2003. Grant and Match Cash Flow Period Estimated Actual 9/30/02 to 12/30/02 $3,078,785 $2,435,828 Billings for the quarter are slightly below estimated values. This results from down time due to the winter period. The next reporting period will include the agreed upon percentages for the month of January reflecting a higher than expected estimate by approximately 2%. This is attributed to a dryer than normal January. Attached: Juvenile Hall Expansion Area Diagram Site Photos Contra Costa County Juvenile Hall 3 of 8 fld d r VIA fg w UO Awn I — n r y ' f Contra Costa County Juvenile Hall 4 of 8 Juvenile Hall Expansion Photos 2/24103 Interior painted gypsum board in section "A" 1 Interior painted gypsum board in section "A" Contra Costa County Juvenile Hall 5 of 8 a. ,t Housing Units "D" and "E" second floor slab { Housing Unit"D" second floor slab Contra Costa County Juvenile Hall 6 of 8 Interior framing and gypsum board at Second Floor Classrooms 1 Housing Units "F" and "G" Contra Costa County Juvenile Hall 7 of 8 Administration Wing yP, Entry and Sallyport Contra Costa County Juvenile Hall 8 of