HomeMy WebLinkAboutMINUTES - 03262002 - C2 10 BOARD OF SUPERVISORS - 4 •. , Contra FROM: MAUiRICE:.M. SHIU, PUBLIC WORKS DIRECTOR Costa a. DATE: March 26, 2002 r - t; County SUBJECT. APPROVE and AUTHORIZE the Public Works Director to execute a contract amendment with Cal Engineering and Geology, effective March 26, 2002, to increase the payment limit by $16,000 to a new payment limit of $44,200, to provide road stability studies on Wildcat Canyon Road, between San Pablo Dam Road and Inspiration Point, for the 'Wildcat Canyon Shoulder Repair Project,>>Orinda Area. (Read Funds) (District I) Project No.:0672-6R6387-02 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDATION: APPROVE' and ;AUTHORIZE the Public Works Director to execute a contract amendment with Cal Engineering and Geology, effective March 26, 2002, to increase the payment' limit by $16,000 to a new;, payment limit of $44,200, to provide read stability studies on Wildcat Canyon Road, between San Pablo Dam Road and Inspiration Point, for the Wildcat Canyon Shoulder Repair Project, Orinda Area. (Road Funds) CONTINUED ON ATTACHMENT: X YES SIGNATU� - RRE WOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION ARD` MMITTEE PROVE OTHER SIGNATURES) ACTION OF BOAR N March 26 -2002 APPROVE AS RECOMMENDED XX. OTHER VOTE OF SUPE ISORS I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN' XX UNANIMOUS(ABSENT IV ) AND ENTERED ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE AYES: NOES: SHOWN. ABSENT: ABSTAIN: CM:MP:kd ATTESTED :, March .26, 2002' G:\MalntNKimkBO\BO3-26 JOHN SWEETEN,CLERK OF THE BOARD OF Orig.Div.Public Warks(Design Division) SUPERVISORS AND COUNTY ADMINISTRATOR Contacts: Neil Leary 313-2278' Tim Jensen,313-7008 cc: E.Kuevor,CAO Purchasing Auditor Controller Gal Engineering and Geology P.W.Accounting SUBJECT: APPROVE and AUTHORIZE the Public Works Director to execute a contract amendment with Cal Engineering and Geology, effective (March 26, 2002, to increase the payment limit by $16,000 to a new payment limit of $44,200, to provide road stability studies on Wildcat Canyon Road.`` BATE March 26, 2002 PAGE: 2 11. FINACIAL IMPACT: > This contract amendment' allows for an additional $16,000 above the previously approved contract limit of $28,200, funded by Road Funds (100%). Ill. REASONS FOR RECOMMENDATION AND BACKGROUND: On January 14, 2002, the County executed a Consulting Services Agreement with CalEngineering and Geology to provide consulting engineering services for repair of a landslide located on Wildcat Canyon Road, approximately 0.5 miles west of San Pablo;Darn Road'in the Orinda area consisting of three phases of work. 1) Field Reconnaissance and Engineering Analysis; 2) Construction Support; and 3) On-call services for other sites on Wildcat Canyon Road and possibly other nearby roads. The additional amount of $16,000 is necessary to provide a detailed assessment of road embankment stability risks along Wildcat Canyon Road outside the landslide' project limits. Portions of this 'road ;,between San Pablo Dam Road and Inspiration Point are exhibiting cracking that is symptomatic of roadway instability. The geotechnical survey will identify, characterize, and categorize areas that are currently distressed or may be subject to existing and future stability problems. IV. CONSEQUENCES OF NEGATIVE ACTION`;' If the amendment is not approved, potential embankment and roadway failures may not be`identified, ;potentially 'exposing the public to traffic delays and resulting in increased construction repair costs to the County.