FROM: MAUiRICE:.M. SHIU, PUBLIC WORKS DIRECTOR Costa
a.
DATE: March 26, 2002 r -
t; County
SUBJECT.
APPROVE and AUTHORIZE the Public Works Director to execute a
contract amendment with Cal Engineering and Geology, effective March
26, 2002, to increase the payment limit by $16,000 to a new payment limit
of $44,200, to provide road stability studies on Wildcat Canyon Road,
between San Pablo Dam Road and Inspiration Point, for the 'Wildcat
Canyon Shoulder Repair Project,>>Orinda Area. (Read Funds) (District I)
Project No.:0672-6R6387-02
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDATION:
APPROVE' and ;AUTHORIZE the Public Works Director to execute a contract
amendment with Cal Engineering and Geology, effective March 26, 2002, to
increase the payment' limit by $16,000 to a new;, payment limit of $44,200, to
provide read stability studies on Wildcat Canyon Road, between San Pablo Dam
Road and Inspiration Point, for the Wildcat Canyon Shoulder Repair Project,
Orinda Area. (Road Funds)
CONTINUED ON ATTACHMENT: X YES SIGNATU� -
RRE WOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION ARD` MMITTEE
PROVE OTHER
SIGNATURES)
ACTION OF BOAR N March 26 -2002 APPROVE AS RECOMMENDED XX. OTHER
VOTE OF SUPE ISORS I HEREBY CERTIFY THAT THIS IS A TRUE
AND CORRECT COPY OF AN ACTION TAKEN'
XX UNANIMOUS(ABSENT IV ) AND ENTERED ON THE MINUTES OF THE
BOARD OF SUPERVISORS ON THE DATE
AYES: NOES: SHOWN.
ABSENT: ABSTAIN:
CM:MP:kd ATTESTED :, March .26, 2002'
G:\MalntNKimkBO\BO3-26 JOHN SWEETEN,CLERK OF THE BOARD OF
Orig.Div.Public Warks(Design Division) SUPERVISORS AND COUNTY ADMINISTRATOR
Contacts: Neil Leary 313-2278'
Tim Jensen,313-7008
cc: E.Kuevor,CAO
Purchasing
Auditor Controller
Gal Engineering and Geology
P.W.Accounting
SUBJECT: APPROVE and AUTHORIZE the Public Works Director to execute a
contract amendment with Cal Engineering and Geology, effective (March 26,
2002, to increase the payment limit by $16,000 to a new payment limit of
$44,200, to provide road stability studies on Wildcat Canyon Road.``
BATE March 26, 2002
PAGE: 2
11. FINACIAL IMPACT: >
This contract amendment' allows for an additional $16,000 above the
previously approved contract limit of $28,200, funded by Road Funds
(100%).
Ill. REASONS FOR RECOMMENDATION AND BACKGROUND:
On January 14, 2002, the County executed a Consulting Services
Agreement with CalEngineering and Geology to provide consulting
engineering services for repair of a landslide located on Wildcat Canyon
Road, approximately 0.5 miles west of San Pablo;Darn Road'in the Orinda
area consisting of three phases of work. 1) Field Reconnaissance and
Engineering Analysis; 2) Construction Support; and 3) On-call services for
other sites on Wildcat Canyon Road and possibly other nearby roads. The
additional amount of $16,000 is necessary to provide a detailed
assessment of road embankment stability risks along Wildcat Canyon Road
outside the landslide' project limits. Portions of this 'road ;,between San
Pablo Dam Road and Inspiration Point are exhibiting cracking that is
symptomatic of roadway instability. The geotechnical survey will identify,
characterize, and categorize areas that are currently distressed or may be
subject to existing and future stability problems.
IV. CONSEQUENCES OF NEGATIVE ACTION`;'
If the amendment is not approved, potential embankment and roadway
failures may not be`identified, ;potentially 'exposing the public to traffic
delays and resulting in increased construction repair costs to the County.