Loading...
HomeMy WebLinkAboutMINUTES - 03192002 - C2 *el, TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: March 19, 2002 SUBJECT: APPROVE and AUTHORIZE the Public Works Director to execute a contract amendment with Sanders and Associates Geostructural Engineering, Inc.to increase the payment limit by$9,000 to a new payment limit of$46,500, to provide additional design services for the Christie Repair Project, effective February 4, 2002,.'Hercules Area. (District 11) Project No.:0672-686351-98 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)8 BACKGROUND AND JUSTIFICATION I. RecomMended Action. APPROVE and AUTHORIZE the Public.,Works Director to execute a contract amendment with Sanders and Associates Geostructural Engineering, Inc. to increase the payment limit by$9,000 to a new payment lirnit of$46,50€I, to provide additional design services for the Christie Repair Project, effective February 4, 2002, Hercules Area. {Federal Emergency Management Agency Funds (75%), Local Road Funds (25%)) nn r Caujiutip-d go mp-nf 4111 ,,,k_,RECOMMENDATION OF COUNTY ADMINISTRATOR _ RE - "MENDATION OF BOARD COMMITTEE APPROVE OTHER. SIGNATURES : ACTION OF BOA ON�.�re/r /I ,deo Z- APPROVED AS RECOMMENDEO OTHER I hereby certify that this is a true and correct copyof an action taken and entered on the minutes ofthe Beard of Supervisors on the date shown. V TE OF SUPERVISORS UNANIMOUS{ABSENT .,4 e,e ) AYES: NOES: A13SENT': ABSTAIN: ATTESTED:. CMMP GAGrpData%Design%oard OrdersiBO 2002thistie Rd Erosion Repeir.doo John Sweeten, Clerk of the Board f Supervisors and County Administrator 069Dh: Publtoftrt (Design Division) Contact Keit Leary 31;3-2279 ae: E,Kuavor CAf7 % AJdi3cs'-CGnt++ftlar ,s''' Communk}D's"topment ' fhLN Aoconnthg / Corstn3dion By Deputy E SUBJECT: APPROVE and AUTHORIZE the Publicl orks Directorto execute a contract amendment With Sanders and Associates Geostructural Engineering,Inc.to increase the payment limit by$9,040 to a new payment limit of$46,5010, to provide additional design services for the Christie Repair Project, effective February 4,2002, Hercules.Area. (District I I) Project No.:0672-6R6351-98 DATE: March 19, 2002 PAGE 2 Il. Financlallmpact. This contract amendment allows for an additional $9,004 above the previously approved contract for$37,500,funded by Federal Emergency Management Agency Funds:(76%), Road Funds (25%). Ill. Reasons for Recom mendabLons and Background: On June 5, 2001; the County executed a Consulting Service Agreement with Sanders and Associates Geostructural Engineering,Inc. (SAGE)to provide design and construction related services for repair of erosion along Christie 'Road' approximately 1.1 mile south of Highway 4. Subsequently, on January 15, 2002, the Amendment No. 1 was approved to increase the payment limit for additional design analysis and construction support. In January of 2002, a topographical' survey was taken of the project area to verify the feasibility of the proposed design (i.e., a soil nail retaining wall)'. After a review of the survey, the design of the soil nail wall will, need to be adjusted to accommodate the change in topography. The additional amount of $9,000 is necessary to incorporate and accommodate the current conditions in the design plans, The accurate design will allow the County to limit any change orders that would have been necessary during construction. The project is scheduled to be advertised for bids on April 2, 2002. Construction i scheduled to begin in July 2002. IV. Consequences of Negal�ve'Action: If the amendment is not approved,the project design may not be sufficient enough to make the required improvements and would require the County to address the topography;change during the construction phase at an increased cost.