HomeMy WebLinkAboutMINUTES - 07102001 - C.5 (2) TO: BOARD OF SUPERVISORS
FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR
DATE: July 24, 2001
SUBJECT: APPROVE the Curb Ramps Program (Countywide)-Citizen Requested project and DETERMINE
that the project is a California Environmental Quality Act Class lc Categorical Exemption, arid
AUTHORIZE the Public Works Director to ADVERTISE the projects at his discretion,Countywide
area. [CDD-CP #01-28] Project No. 0662-6U4057
Specific Request(s) or Recommendation(s) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Curb Ramps Program (Countywide)-Citizen Requested project, and
DETERMINE that the project is a California Environmental Quality Act (CEQA) Class lc Categorical
Exemption, and
AUTHORIZE the Public Works Director to ADVERTISE the project at his discretion, and
DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk.
Continued on Attachment: X SIGNATUREZsf-
RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JULY 249 2001 APPROVED AS RECOMMENDED XXOTIIER
VOTE OF SUPERVISORS I V I hereby certify that this is a true and correct copy of an
UNANIMOUS(ABSENT )
AYES: NOES: action taken and entered on the minutes of the Board of
ABSENT: ABSTAIN: Supervisors on the date shown.
Gsd
G:\GrpData\SpDist\Board Orders\Environmental\ ATTESTED: JULY 24 , 2001
Curb Ramps Program-Cit-Req-Countywide-Cat Ex(07-24-01).doc JOHN SWEETEN, Clerk of the Board of Supervisors
Orig.Div: Public Works(Engineering Services Division) and County Administrator
Contact: L. Chavez (925)313-2366
cc: Administrator-Attn: E. Kuevor
Auditor-Controller By
Community Development—K. Piona Deputy
Public Works: Accounting
Construction-R. Bruno
Design- B. Fernandez
Engineering Services -T.Torres,Enviro.
Transp. Eng.-A. Schaal
SUBJECT: APPROVE the Curb Ramps Program (Countywide)-Citizen Requested project and DETERMINE
that the project is a California Environmental Quality Act Class lc Categorical Exemption, and
AUTHORIZE the Public Works Director to ADVERTISE the projects at his discretion,Countywide
area. [CDD-CP #01-28] Project No. 0662-6U4057
DATE: July 24, 2001
PAGE: 2
RECOMMENDED ACTION (continued):
AUTHORIZE the Public Works Director to arrange for payment of a S25 fee to Community Development
for processing, and a S25 fee to the County Clerk for filing the Notice of Exemption.
11. FINANCIAL IMPACT:
The estimated project cost for the Curb Ramps Program (Countywide)-Citizen Requested will not exceed
550,000.00 annually, funded by Road Funds (100%).
i11. REASONS FOR RECOMMENDATION/BACKGROUND:
The purpose of this project is to install ADA (Americans with Disabilities Act) curb ramps, .so that the
mobility impaired can have access to facilities such as bus stops, stores, schools, and the neighborhood in
general. This is a continuous countywide program to enable Contra Costa County to respond to the mobility
impaired citizen requests, as needed. This program will be implemented in unincorporated portions of the
county and will not require permits from any of the cities within Contra Costa County.
The project consists of removing existing curb, gutter, and sidewalk at various intersection confers within
the county and replacing them with up to four ADA curb ramps at each intersection, per citizen request
(Fig.2). Individual locations may require the installation of retaining walls,however,no retaining walls in
excess of 3 feet will be installed. No road widening is required for this program. Activities may impact the
root systems of some trees. In order to minimize darnage to any of the affected trees, any roots exposed
during excavation will be cut cleanly. If necessary,tree branches will be trimmed cleanly. No native trees
greater than 6-inch DBH will be removed. No stands of trees will be affected (Native nor non-native). In
addition, any oak tree root systems greater than 6-inch in diameter (DBH) that are exposed during
excavation shall be wrapped with wet burlap to minimize shock. Some utilities and storm drain inlets may
need to be adjusted, but no additional storm drains will be installed and no additional right of way will be
needed. Street signs and stop signs may need to removed and replaced at various intersections. Minor
traffic control will be implemented at some locations; however, one lane will be open in each direction.
The project has been determined to be in compliance with the General Plan and is exempt from CEQA.The
project involves the minor alteration of existing public facilities involving no expansion of use beyond
previously existing. The project will not result in the removal of any scenic resource.
IV. CONSEQUENCES OF NEGATIVE ACTION:
Delay in approving the project will result in a delay of design and construction and may jeopardize funding.
CONTRA PUBLIC WORKS DEPARTMENT
OSTA INITIAL STUDY
COUNTY OF ENVIRONMENTAL SIGNIFICANCE
PROJECT #0662-6U4057
CP# 01-28
PROJECT NAME: Curb Ramps Program (Countywide)-Citizen Requested
PREPARED BY: Trina Torres � 'r/✓ DATE: May17, 2001
APPROVED BY: ( DATE: 5—(/O-r77� v,
RECOMMENDATIONS:
(4) Categorical Exemption (Class Ic) Negative Declaration
( ) Environmental Impact Report Required ( ) Conditional Negative Declaration
The project will not have a significant effect on the environment. The recommendation is based on the
following: The project involves the minor alteration of existing public facilities involving no expansion of use beyond previously
existing.This project is consistent with CEQA Guidelines §15301.
What changes to the project would mitigate the identified impacts
USGS Quad Sheet Petaluma Point,Mare Island,Benicia, Vine Hill,, Honker Bay,Antioch North,Antioch South,
Jersey Island, Bouldin Island, SanQuentin, Richmond,Briones Valley, I$'alsuit Creek, Clayton,Brentwood, 1voodivard
Island, Oakland East,Las Trampas Ridge, Diablo, Tassa,j�ra, Byron Hot Sp�in�.r, Clifton CouttForebay, Hayward,
Dublin, and Livermore . Base Map Sheet# C-8 lhrorrgh Z 78 Parcel #lei/A
GENERAL CONSIDERATIONS:
1. Location:
The project is located throughout unincorporated portions of Contra Costa County. (Fig. 1)
2. Project Description:
The purpose of this project is to install ADA(Americans with Disabilities Act)curb ramps,so that the mobility
impaired can have access to facilities such as bus stops,stores, schools,and the neighborhood in general.
This is a continuous countywide program to enable Contra Costa County to respond to the mobility
impaired citizen requests, as needed. This program will be implemented in unincorporated portions of the
county and will not require permits from any of the cities within Contra Costa County.
The project consists of removing existing curb, gutter, and sidewalk at various intersection corners within
the county and replacing them with up to four ADA curb ramps at each intersection, per citizen request(Fig.
2). Individual locations may require the installation of retaining walls, however, no retaining walls in eXCeSS
of 3 feet will be installed. No road widening is required for this program. Activities may impact the root
systems of some trees. In order to minimize damage to any of the affected trees,any roots exposed during
excavation will be cut cleanly. If necessary,tree branches will be trimmed cleanly. No native trees greater
than 6-inch DBH will be removed. No stands of trees will be affected (Native nor non-native). In addition,
any oak tree root systems greater than 6-inch in diameter(DBH)that are exposed during excavation shall
be wrapped with wet burlap to minimize shock. Some utilities and storm drain inlets may need to be
adjusted, but no additional storm drains will be installed and no additional right of way will be needed.
Street signs and stop signs may need to removed and replaced at various intersections. Minor traffic control
will be implemented at some locations, however, one lane will be open in each direction.
3. Does it appear that any feature of the project will generate significant public concern?
[] yes [4] no [] maybe (Nature of concern):
4. Will the project require approval or permits by other than a County agency? [] yes [4] no Agency
Name(s)
5. Is the project within the Sphere of Influence of any city? Yes; Antioch, Brentwood, Clayton, Concord,
Danville, El Cerrito, Hercules,Lafayette, lllartine-Aforaga, Onnda, .Pinole, Pittsburx, Pleasant Hill, Richmond,
San Pablo, San Ramon, Walnut Creek,
tt
\\PWS4\SHARDATA\GrpData\EngSvc\ENVIRO\2001 projects\CEQA only\
Cat.EACurb Ramps Program-Citizen Req-Countywide.doc
�-
°- o
r" 00
CIO
v
Q
r'
l
Q
� o
t1 rn°
tf`�
v
tiQ
v
�xz
z m Irri
o
moi f
-n rri
rzt,
C-)
m� 1
Nz v c
n Z 70M
D c
01) v OC
=--------------- Q fTl
D r-
D X
------- i--- C7 ------- ---------
_ m o N -------- ---------
m ------------------ _{ m ------------------
CD
-A r-
.
v �
m
0
CD
� z
c
0
D D
� m
(!1
O
G7
�] ------------------ ------------------
D ------------------ / ------------=-----
-----------------
-----------------
------------------ „
CD
N `
4
PROOF OF PUBLICATION "
(2015.5 C.C.P.) PuPublic works"�
Department D
255Glacier rive .
STATE OF CALIFORNIA Martinez,Californla
County of Contra Costa 94St33'4e97
NOTICE TO .
I am a citizen of the United States and a resident of the CONTRACTORS
County aforesaid; I am over the age of eighteen years, and The Public Works Director
not a party to or interested in the above-entitled matter. will receive sealed bids at
the Public Works Depart-
am the Principal Legal Clerk of the Contra Costa Times, a ment C.C. Rich Building,
P 9 255(;lacier Drive,Martinez
newspaper of general circulation, printed and published at California 94553-4897,until OFhe general prevailingrate
2640 Shadelands Drive in the City of Walnut Creek, County 2 o'cbcKp m.,on Septem- of wages applicable o this
Of Contra Costa,94598. I bar 10 2002,at which time work.The prevailing rate of
the
will be publicly opened, with the Clerkgof the Board
and read,tor.2002 WEST of Supervisors, and is in-
And which newspaper has been adjudged a newspaper of courm CURB RAMP corporated herein by refer-
general circulation by the Superior Court of the County of PROJECT ence thereto,the same as
Contra Costa, State of California, under the date of October General work description: If set forth In full herein.For
22, 1934.Case Number 19764. The project consists of re- eluded In the lis,thnot ini-
movingexistinngg curb, gut- mum wage shall be the
ter and side wlx and con- g rA revalling rate for
The notice, of which the annexed is a printed copy (set in structing curb ramps and Corttr costacounty
type not smaller than nonpareil),has been published in each Installing a drainage Inlet Pursuant to Section 1773 of
the Labor Code,the gener-
regular and entire issue of said newspaper and not in anyIneer's cost estimate: al prevailing wage rates in
supplement thereof on the following dates,to-wit: $36.5 the county,or counties, in
which the work Is to be
A pprebid meeting will be done hbbayyve been deter-
AuquSt 9 heftl on Monday AUGUST the mined
Ile
26, 2002,at 9:00 a.m., at of Industrial Relations.
all in the year Of 2002 the Public Works Depart- These wage rates are set
Y ment to cover the pro act
construction. Prospective lbrth in the General Prevail-
bidders attendance is res- Ing Wage Rates for this
project available at the
I certify (or declare) under penalty of perjury that the ommended by not manda- above address and avall-
fore oin is true and correct. tory paablletfrom the California De-
g g Contract Documents, In- tions' intemetdwebasitte lat
Executed at Walnut Creek,California. cluding plans and speclfl- nttp:l/wwev.dir.ca.gov. Fu-
1 cations, may be viewed ture effective general pre-
On thi;y9 day pf August, 2 and/or obtalned at the Pub- vailing wages which have
g
f/ kc Works Department, C. are onn fpredeterminedith ifornla
C. Rich.Building, 255 Gla-
��, _ i7 De ant o f us a
�� _ cier Drive Martinez Callfor- Re
are refuerenced
=1 •• .•"•••"... ••••• nla 9455 -4897, Monday- t not print in a gen-
SI nature v Thursday, �7 00 a.m. - 72 eral prevailing wage rates.
noon and 1:00 p.m.-5:00
p.m.1 (Closed Fridays). To
CO B Costa Times tions service cand hargeisre- The bid o ning date may
P O BOX 4147 be extend d by addendum
Walnut Creek,CA 94596 gulred In the amount of Issued by the Public Works
817.32(sales tax included). Department no later than
(925)935-2525 Plans and speclflcations September 6, 2001, In
may be ordered by mail for which case any bids sub-
an of Publication of: addnitioashipping and miffed for the original bid
g of b3.00. opening will be returned
(attached is a copy of the legal advertisement that published) Checks shall be made pay- unopened and sealed bid
Able to The County ofproposals for the extended
Contra Costa" and be bid opening shall be sub-
mailed to the above ed- miffed on or before Sep-
00
mailed
The Public Works [ember 24, 2002, at opened,
Department
Department does not guar- read and will be opened,
antee the arrival of the read and recorded at ithe
ed
Flans and specifications In same Place specified
for bidding.Plans and alcove. All proposals re-
specifications will not be calved late will be returned
.unopened.
sent overnight mall. .
This project is to be ad- The said Board reserves
vertised pursuant to Public the right to reject any.and
Contract Code 22037. all bids or any portion,of
any bid and/or waive any tr-
This contracts subject to I-ri:y in any Sid Te-
state contract nondiscrimi-. ceded.
nation and compliance re-
9ulrements pursuant to For questions re ardin the
Government Code,Section den, DesigtnCDiviision,at
the (925)313-2248.
.The Contractor shall pos-
sess a Class A or Class C-8 By order of the Board of
License at the time the Supervisors of Contra Cos-
Contract.Is awarded.. ta County
Bids must cover the entire ,john Sweeten
project, and neither partial Clerk of the
nor contingent bids will be Board of Supervisors
considered. and County Administrator I
[n'id'
successful bidder shall By 181 E.Sharp l
�a performance bond tl Dated August 6,2002 l
Legal CCT-5600
e Board has ascertalned, Puallsh August 9,2002
[A
Z..
LEGAL PUBLICATION REQUISTION U •
" A A Contra Costa County 7 D
From: Clerk of the Board To: Contra Costa Times
651 Pine St., Room 106 PO Box 5124
Martinez, CA 94553 Walnut Creek, CA'94596
Requested by: . >29 4 <JXg-� Date: w
Phone No:- Reference No:
Org: !2 Sub Object: Task: Activity: _
Publication Date (s): fwa u-sT
040 »e. -�
V No. o Pages: 0
LEGAL PUBLICATION- . 0&0 XZ
ti
**"Immediately upon expiration otpublication,0600_. -- —
send in one affidavit for each publication in
order that the auditor may be authorized to pay your bill.
Authorized Signature: X4X"1_
Please confirm date of publication & receipt of this fax.
P oject N 2 WEST COUNTY CURB RAM JQ ECT
Project Numb 62-6U408 - 2��
Contra Costa County
Public Works Department
255 Glacier Drive, Martinez, California 94553-4897
NOTICE TO CONTRACTORS
The Public Works Director will receive sealed bids at the Public Works Department, C.C. Rich
Building, 255 Glacier Drive, Martinez, California 94553-4897,until 2 o'clock p.m., on September 10,
2002, at which time they will be publicly opened and read, for: 2002 WEST COUNTY CURB RAMP
PROJECT.
General work description: The project consists of removing existing curb, gutter, and sidewalk, and
constructing curb ramps and installing a drainage inlet.
Engineer's cost estimate: $ 36,500
A pre-bid meeting will be held on Monday, August 26, 2002 at 9:00 a.m. at the Public Works
Department to cover the project construction. Prospective bidders attendance is recommended but not
mandatory.
Contract Documents, including plans and specifications, may be viewed and/or obtained at the; Public
Works Department, C.C. Rich Building, 255 Glacier Drive, Martinez, California 94553-4897, Monday -
Thursday (7:00 a.m. - 12 Noon and 1:00 p.m. - 5:00 p.m.) (closed Fridays). To obtain plans and
specifications a service charge is required in the amount of $17.32 (sales tax included). Plans and
specifications may be ordered by mail for an additional shipping and handlin11 fee of$3.00. Checks
shall be made payable to 'The County of Contra Costa' and be mailed to the above address. The Public
Works Department does not guarantee the arrival of the plans and specifications in time for bidding. Plans
and specifications will not be sent overnight mail.
This project is to be advertised pursuant to Public Contract Code 22037.
This contract is subject to state contract nondiscrimination and compliance requirements pursuant to
Government Code, Section 12990.
The Contractor shall possess a Class A or Class CC=8 License at the time the Contract is awarded.
Bids must cover the entire project, and neither partial nor contingent bids will be considered.
The successful bidder shall furnish a payment bond and a performance bond.
The Board has ascertained the general prevailing rate of wages applicable to this work. The prevailing,
rate of per diem wages is on file with the Clerk of the Board of Supervisors, and is incorporated herein by
reference thereto, the same as if set forth in full herein. For any classification not included in the list, the!
minimum wage shall be the general prevailing rate for Contra Costa County.
The bid opening date may be extended by addendum issued by the Public Works Department no later
than September 6, 2002, in which case any bids submitted for the original bid opening will be returned.
unopened and sealed bid proposals for the extended bid opening shall be submitted on or before September
24, 2002, at 2:00 p.m., and will be opened, read and recorded at the same place specified above. All
proposals received late will be returned unopened.
The said Board reserves the right to reject any and all bids or any portion of any bid and/or waive any
irregularity in any bid received.
For questions regarding the project contact Pete Warden, Design Division, at(925) 313-2248.
By order of the Board of Supervisors of Contra Costa County
John Sweeten
Clerk of the Board of Supervisors and County Administrator
By �—
Deputy
Dated:
Publication dates:
CONTRA COSTA COUNTYPUBLIC WORKS DEPARTMENT
255 GRACIER DRIVE, MARTINEZ, CALIFORNIA
DATE:
TO: Clerk of the Board of Supervisors
'9.- 12 02
FROM: Michael Hollingsworth, Assistant Public Works Director, Construction
SUBJECT: Authorization to Advertise" c'l6op-
This is your Authorization to advertise the attached Notice to Contractors for the
" "project and publish the Notice to Contractors under Public Contract
Code: 22037 moo a- (,r/�j f �ur�t�if, ed v 6 4 , ./ .0;e� -
The attached Board Order authorization the Public Works Director to advertise this
project at his discretion was approved on: u(v ;Z
r
The bid due date for this project is: 060*At bo:- e
Project No:
Wrap
March 29,2001
GAGrpData\Design\FORMS\Drawer#2\D-7.doc
Attachments
TO: BOARD OF SUPERVISORS
WONI: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR
DATE: July 24, 2001
SUBJECT: APPROVE the Curb Ramps .Program (Countywide)-Citizen Requested project and DETERM NE
that the project is a California Environmental Quality Act Class lc Categorical Exemption, and
AUTHORIZE the Public Works Director to ADVERTISE the projects at his discretion,Countywide
area. [CDD-CP #01-28] Project No. 0662-6U4057
Specific Request(s) or Recommendations) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Curb Ramps Program (Countywide)-Citizen Requested project, and
DETERMINE that the project is a California Environmental Quality Act (CEQA) Class lc Categorical
Exemption, and
AUTHORIZE the Public Works Director to ADVERTISE the project at his discretion, and
DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk:.
Continued on Attachment: X SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JULY 247 2001 APPROVED AS RECOMMENDED XXOTHER
VOTE OF SUPERVISORS
UNANIMOUS(ABSENT - I V ) I hereby certify that this is a true and correct copy of an
AYES: NOES: action taken and entered on the minutes of the Board of
ABSENT: ABSTAIN: Supervisors on the date shown.
G:\GrpData\SpDist\Board Orders•.Environmental\ AT TESTED: JULY 24� L001
Curb Ramps Program-Cit-Req-Countywide-Cat Ex (07-21-01).doc JOHN SWEETEN, Clerk of the Board of Supervisors
Orig.Div: Public Works(Engineering Services Division) and County Administrator
Contact: L. Chavez (.925)313-2366
Administrator-Attn: E. Kuevor /
Auditor-Controller By
Cy �E
Community Development -K. Piona Deputy
Public Works: Accounting
Construction-R. Bruno
Design- B. Fernandez.
Engineering Services -T. Torres, Enviro.
Transp. Eng.-A. Schaal �✓
SUBJECT: APPROVE the Curb Ramps Program (Countywide)-Citizen.Requested project and DETERMINE
that the project is a California Environmental Quality Act Class lc Categorical Exemption, and
AUTHORIZE the Public Works Director to ADVERTISE the projects at his discretion,Countywide
area. [CDD-CP ,t'01-'-?S] Project No. 0662-6U4057
DATE: July 24, 2001
PAGE: 2
RECOMMENDED ACTION (continued):
AUTHORIZE the Public Works Director to arrange for payment of a$25 fee to Community Development
for processing, and a $25 fee to the County Clerk for filing the Notice of Exemption.
1I. FINANCIAL IMPACT:
The estimated project cost for the Curb Ramps Program (Countywide)-Citizen Requested will not exceed
$50,000.00 annually, funded by Road Funds (100%). j
I
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The purpose of this project is to install ADA (Americans with Disabilities Act) curb ramps, so that the
mobility impaired can have access to facilities such as bus stops, stores, schools, and the neighborhood in
general. This is a continuous countywide program to enable Contra Costa County to respond to the mobilihi
impaired citizen requests, as needed. This program will be implemented in unincorporated portions of the
county and will not require permits from any of the cities within Contra Costa County.
The project consists of removing existing curb, gutter, and sidewalk at various intersection corners within
the county and replacing them with up to four ADA curb ramps at each intersection, per citizen request
(Fig.2). Individual locations may require the installation of retaining walls,however,no retaining walls ire
excess of 3 feet will be installed. No road widening is required for this program. Activities may impact the
root systems of some trees. In order to minimize damage to any of the affected trees, any roots exposed
during excavation will be cut cleanly. .Ifnecessary,tree branches will be trimmed cleanly: No native trees
greater than 6-inch DBH will be removed. No stands of trees will be affected (Native nor non-native). In
addition, any oak tree root systems greater than 6-inch in diameter.(DBH) that are exposed during;
excavation shall be wrapped with vet burlap to minimize shock. Some utilities and storm drain inlets may
need to be adjusted,but no additional storm drains will be installed and no additional right of way will be
needed. Street signs and stop signs may need to removed and replaced at various intersections. Minor
traffic control will be implemented at some locations; however, one lane will be open in each direction.
The project has been determined to be in compliance with the General Plan and is exempt from CEQA.The:
project involves the minor alteration of existing public facilities .involving no expansion of use beyond
previously existing. The project will not result in the removal of any scenic resource.
IV. CONSEQUENCES OF NEGATIVE :ACTION:
Delay in approving the project will result in a delay of design and constriction and may jeopardize funding..
tra Costa'and be mailed to possible bid rigging,bidder
the above address. The collusion, or otthher fraudu-
Public Works Department lent activities should use
does not guarantee the ar- the "hotline" to report
rival of the plans and speci- these activities.The "hot-
fications in time for bidding. line" is part of the DOTS
Plansand specifications will continuing effort to Identify
not be sent overnight mail. and Investigate.highway
construction contract fraud
This project is to be adver- and abuse and is operated
This
to Public under the direction of the
tised Contract Cade 22 o DOT Inspector General.All
Information will be treated
This contract is subject to confidentially and caller an-
state contract nondiscriml- onymity will be respected.
nation and compliance re- The bid opening date may
99uirements pursuant to be extended by addendum
Govemment Code,Section Issued by the Public Works
12990. Department no later.than
The Contractor shall pos- MARCH 28 2003,In which
sess a Class A or Class C-8 case any bids submitted
Contractor's License at the for the original bid opening
time the Contract is award- will be returned unopened
ed. and sealed bid proposals
Bids must cover the entire for.the extended bid open-
Bids
m and neither mireartial Ing shall be submitted on or
project,
contingent bids will be before APRIL n will ' at
be
considered. ofe d,re and will. ed
The successful bidder shall opened,read and recorded
furnish a payment bond at the same place specs
and a performance bond. fled above. All proposals
Pursuant to Section 1773 of received late will be re-
fumed unopened.
the Labor Code,the gener- The said Board reserves
al prevailing wage rates In the right to reject any and
the county in which the all bids or any portion of
work Is to be done have any bid and/or waive any ir-
been determined by the Di- regularlty .In any bid re-
rector of the California De- ceTNv(ad. .
partment of Industrial Fels- For questions r arding the.
tions.These wages are set project
e jest contactesign Pete riN
We
In the General Prevail- (925)313-2248.
ing Wage Rates for this
project, available at the By order of the Board of
above address and avail- Supervisors of Contra Los-
able from the California De- to County
partment of Industrial Fels- John Sweeten
tions' Internet web site at Clerk of the Board of
Contra Costs County http:/Nvww.dir.ca.gov. Fu- Supervisors and County
Public Works lure effective general pre- Administrator
pepartrnent vailing wage rates which BY/s/E.L.Sharp
255 Glacier Drive have been predetermined Deputy
Martinez Californ a and are on file with the Cal- ated:Februa
945513-4897 ifomla Department of In- Dry
dustrlal Relations are refer- Legal CCT.696 18,2003
1
NOTICE TO: enced but not printed in the Publish February 21,2003
CONTRACTORS general prevailing wage
rates.
The Public Works Director The Federal minimum
will receive sealed bids at wage rates for this pproject
the Public Works Depart- as predetermined by the
ment..C.C. Rich Building, United States Secretary of
255 diacier Drive,Martinez Labor are set forth in the
California 94553�897,.until PROPOSAL and CON-
2 o'clock p.m., on April 1 TRACT book. If there is a
2003, at which.time they difference between the
will be publlcIy o ned and minimum wage rates pre-
read for..BAYO VISTA AR- determined.by the Secre-
EA.dtURB RAMP,PROJECT. toryry of Labor and the pre-
' vafling wage rates
General work description: determined by the Director
The project consists or re- of the California Depart-
moving.exlstlnp curb.gut- ment of Industrial Relations
ter,and sidewalk,andcon- for similar classifications of
structing new curb;gutter; labor, the Contractor and
sidewalk and curb ramps his subcontractors shall
In compliance with the pay not less than the higher
Americans with Disabilities wage. The County of Con-
Act.. tra Costa will not accept
lower State wage rates not
Engineer's cost estimate: specifically included in the
$90,000 Federal minimumwage
determinations. This in-
Apre=bid meetingg.will be cludes "helper" (or other
held on Monday,.March 17, classifications based on
2003 at 9:00 a.m. at the hours of experience)or any
Public Works Department other classification not ap-
to cover DBE requirements. pearing in the Federal
Prospective bidders atten- wage determinations.
dance is recommended Where Federal wage deter-
but not mandatory. Con- minations do not contain
tract Documents,including the State wage rate deter-
plans and specifications, mination otherwise avail-
may be viewed and/or ob- able for use by the Con-
tained at the Public.Works tractor and subcontractors,
Deppartment G.C. Rich the Contractor and sub-
BMIng,25�Glacier Drive, contractors shall pay not
Martinez, California less than the Federal mini-
94553-4897 Monday - mum wage rate which
Thursday (Y:00 a.m. - 12 most closely approximates
Noon and 1:00 pp m.-5:00 the duties of the employ-;
p.m.) (closed Fn'days). To ees in question.
obtain plans and spec ca
- The U.S. Department of
tions a service charge Is re- Transportation (DOT) pro-
qulred in the amount of vides a toll-free "hotline"
$19.48(sales tax Included). service to report bid rigging
PLANS AND SPECIFICA- activities.Bid rigging activi-
TIONS MAY BE ORDERED ties can be reported Mon-
i BY MAIL FOR AN ADDI- days through Fridays, be-
`TIONAL SHIPPING ANA tween 9:00 a.m. and 5:00
HANDLING FEE OF$3.( p.m., eastern time Tele-
Checks shall be made Pay- phone no.1-800-424-9071.
able to The County of Con- Anyone with knowledge of
"Anashia Lloyd" To: EShar@cob.co.contra-costa.ca.us
<alloyd@cctimes.com> . Subject: Re: Bayo Vista Area Curb Ramp Project
02/18/2003 12:12 PM
Legal #6961 with reference 817 to publish in CCT on 02/21. Amount: $191.53
EShar@cob.co.contra-costa.ca.us wrote:
> Dear Anashia,
> Please publish the above project "Bayo Vista Area Curb Ramp Project on
> February 21, 2003 under Ref. No. 817. I'll be faxing you the hard copy but
> please avoid duplication.
> Thanks for your attention
> (See attached file: BayoVista.doc)
> Emelda L. Sharp
> Clerk of the Board
> -------------------------------------------------------------------------
> Name: BayoVista.doc
> BayoVista.doc Type: WINWORD File (application/msword)
> Encoding: base64
> Download Status: Not downloaded with message
LEGAL PUBLICATION REQUISTION �•
Contra Costa County
sr+cov
From: Clerk of the Board To: Contra .Costa Times
651 Pine St., Room 106 PO Box 5124
Martinez, CA 94553 Walnut Creek,-CA'94596
Requested by: EMY L. SHARP Date: FEBRUARY 18, 2003
Phone No: 925-335-1903 Reference No: 817
Org: 0662 Sub Object: 2190 Task: SAS Activity: 6R4150-03
Publication Date : FEBRUARY 21, 2003/..
No. of Pages. (3)
LEGAL PUBLICATION- "BAYO VISTA AREA CURB RAMP PROJECT"
*"*"Immediately upon expiration of publication,"*"*
send in one affidavit for each publication in
order that the auditor may be authorized to pay your bill.
Authorized Signature:
•
e-mail
Please confirm date of publication & receipt of this fax. By telephone /please .
fxojectNam : YO.VISTPA RA PRO �1
�i �// Prd�ec Nu r: . 62 684150- 3
�. ,
Contra Costa County
Public Works Department
255 Glacier Drive,Martinez,California 945534897
NOTICE TO CONTRACTORS
The Public Works Director will receive sealed bids at the Public Works Department,C.C.Rich Building,255
Glacier Drive,Martinez,California 94553-4897,until 2 o'clock p.m.,on April 12003,at which time they will
be publicly opened and read,for:BAYO VISTA AREA CURB RAMP PROJECT.
General work description: The project consists or removing existing curb,gutter,and sidewalk,and
constructing new curb,gutter, sidewalk,and curb ramps in compliance with the Americans with
Disabilities Act.
Engineer's cost estimate:$90,000
A pre-bid meeting will be held on Monday,March 17,2003 at 9:00 a.m.at the Public Works Department to
cover DBE requirements. Prospective bidders attendance is recommended but not mandatory.
Contract Documents,including plans and specifications,may be viewed and/or obtained at the Public Works
Department,C.C.Rich Building,255 Glacier Drive,Martinez,California 94553-4897,Monday-Thursday
(7:00 a.m. - 12 Noon and 1:00 p.m.-5:00 p.m.)(closed Fridays).To obtain plans and specifications a service
charge is required in the amount of$19.48(sales tax included). Plans and specifications may be ordered by
mail for an additional shipping and handling fee of$3.00. Checks shall be made payable to'The County of
Contra Costa'and be mailed to the above address. The Public Works Department does not guarantee the arrival
of the plans and specifications in time for bidding. Plans and specifications will not be sent overnight mail.
This project is to be advertised pursuant to Public Contract Code 22037.
This contract is subject to state contract nondiscrimination and compliance requirements pursuant to
Government Code,Section 12990.
The Contractor shall possess a Class A or Class C-8 Contractor's License at the time the Contract is
awarded.
Bids must cover the entire project,and neither partial nor contingent bids will be considered.
The successful bidder shall furnish a payment bond and a performance bond.
Pursuant to Section 1773 of the Labor Code,the general prevailing wage rates in the county in which the work
is to be done have been determined by the Director of the California Department of Industrial Relations. These
wages are set forth in the General Prevailing Wage Rates for this project,available at the above address and
available from the California Department of Industrial Relations'Internet web site at http://www.dir.ca.gov.
Future effective general prevailing wage rates which have been predetermined and are on file with the
California Department of Industrial Relations are referenced but not printed in the general prevailing wage
rates.
The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are
set forth in the PROPOSAL and CONTRACT book. If there is a difference between the minimum wage rates
predetermined by the Secretary of Labor and the prevailing wage rates determined by the Director of the
California Department of Industrial Relations for similar classifications of labor,the Contractor and his
subcontractors shall pay not less than the higher wage. The County of Contra Costa will not accept lower State
wage rates not specifically included in the Federal minimum wage determinations. This includes"helper"(or
other classifications based on hours of experience)or any other classification not appearing in the Federal wage
determinations. Where Federal wage determinations do not contain the State wage rate determination
otherwise available for use by the Contractor and subcontractors,the Contractor and subcontractors shall pay
not less than the Federal minimum wage rate which most closely approximates the duties of the employees in
question
The U.S.Department of Transportation(DOT)provides a toll-free"hotline"service to report bid rigging
activities. laid rigging activities can be reported Mondays through Fridays,between 9:00 a.m.and 5:00 p.m.,
eastern time,Telephone no. 1-800-424-9071. Anyone with knowledge of possible bid rigging,bidder
collusion,or other fraudulent activities should use the"hotline"to report these activities. The"hotline"is part
of the DOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is
operated under the direction of the DOT Inspector General. All information will be treated confidentially and
caller anonymity will be respected..
The bid opening date may be extended by addendum issued by the Public Works Department no later than
March 28,2003,in which case any bids submitted for the original bid opening will be returned unopened and
sealed bid proposals for the extended bid opening shall be submitted on or before April 15,2003,at 2:00 p.m.,
and will be opened,read and recorded at the same place specified above. All proposals received late will be
returned unopened.
The said Board reserves the right to reject any and all bids or any portion of any bid and/or waive any
irregularity in any bid received.
For questions regarding the project contact Pete Warden,Design Division,at(925)313-2248.
By order of the Board of Supervisors of Contra Costa County
John Sweeten
Clerk of the Board of Supervisors and County Administrator
By E.L. SHARP
Deputy
Dated: FEBRUARY 18, 2003
Publication dates:
FEBRUARY 21, 2003
BF:m}y �.
February63 200 j.' n
G:\CjrpD2ta\DeOgn\FO S awe{(#2\ Tdo�,.
At'tachtn,e ' `'
TO: BOARD OF SUPERVISORS
FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR
DATE: July 24, 2001
SUBJECT: APPROVE the Curb Ramps Program (Countywide)-Citizen Requested project and DETERMINE
that the project is a California Environmental Quality Act Class lc Categorical Exemption, and
AUTHORIZE the Public Works Director to ADVERTISE the projects at his discretion,Countywide
area. [CDD-CP #01-28] Project No. 0662-6U4057
Specific Request(s) or Recommendation(s) & Background &Justification
I. RECOMMENDED ACTION:
APPROVE the Curb Ramps Program (Countywide)-Citizen Requested project, and
DETERMINE that the project is a California Environmental Quality Act (CEQA) Class lc Categorical
Exemption, and
AUTHORIZE the Public Works Director to ADVERTISE the project at his discretion, and
DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk.
•
40,
Continued on Attachment: X SIGNATURE•
RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JULY 24, 2001 APPROVED AS RECOMMENDED XXOTHER
VOTE OF SUPERVISORS _ I V I hereby certify that this is a true and correct copy of an
UNANIMOUS(ABSENT )
AYES: NOES: action taken and entered on the minutes of the Board of
ABSENT: ABSTAIN: Supervisors on the date shown.
TT:sd
G:\GrpData\SpDist\Board Orders\Environmental\ ATTESTED: JULY 2 4 2 001
Curb Ramps Program-Cit-Req-Countywide-Cat Ex(07-24-01).doc JOHN SWEETEN,Clerk of the Board of Supervisors
Orig.Div: Public Works(Engineering Services Division) and County Administrator
Contact: L. Chavez (925)313-2366
cc: Administrator-Attn: E.Kuevor
Auditor-Controller By
Community Development—K.Piona
Public Works: Accounting Deputy _
Construction-R.Bruno
Design- B.Fernandez
Engineering Services -T.Torres,Enviro.
Transp.Eng.-A.Schaal
SUBJECT: APPROVE the Curb Ramps Program (Countywide)-Citizen Requested project and DETERMINE
that the project is a California Environmental Quality Act Class lc Categorical Exemption, and
AUTHORIZE the Public Works Director to ADVERTISE the projects at his discretion,Countywide
area. [CDD-CP #01-28] Project No. 0662-6U4057
DATE: July 24, 2001
PAGE: 2
RECOMMENDED ACTION (continued):
AUTHORIZE the Public Works Director to arrange for payment of a$25 fee to Community Development
for processing, and a$25 fee to the County Clerk for filing the Notice of Exemption.
II. FINANCIAL IMPACT:
The estimated project cost for the Curb Ramps Program (Countywide)-Citizen Requested will not exceed
$50,000.00 annually, funded by Road Funds (100%).
III. REASONS FOR RECOMMENDATIONBACKGROUND:
The purpose of this project is to install ADA (Americans with Disabilities Act) curb ramps, so that the
mobility impaired can have access to facilities such as bus stops, stores, schools, and the neighborhood in
general.This is a continuous countywide program to enable Contra Costa County to respond to the mobility
impaired citizen requests, as needed. This program will be implemented in unincorporated portions of the
county and will not require permits from any of the cities within Contra Costa County.
The project consists of removing existing curb,gutter,and sidewalk at various intersection corners within
the county and replacing them with up to four ADA curb ramps at each intersection,per citizen request
(Fig.2). Individual locations may require the installation of retaining walls,however,no retaining walls in
excess of 3 feet will be installed.No road widening is required for this program. Activities may impact the
root systems of some trees. In order to minimize damage to any of the affected trees, any roots exposed
during excavation will be cut cleanly. If necessary,tree branches will be trimmed cleanly. No native trees
greater than 6-inch DBH will be removed. No stands of trees will be affected (Native nor non-native). In
addition, any oak tree root systems greater than 6-inch in diameter (DBH) that are exposed during
excavation shall be wrapped with wet burlap to minimize shock. Some utilities and storm drain inlets may
need to be adjusted,but no additional storm drains will be installed and no additional right of way will be
needed. Street signs and stop signs may need to removed and replaced at various intersections. Minor
traffic control will be implemented at some locations; however, one lane will be open in each direction.
The project has been determined to be in compliance with the General Plan and is exempt from CEQA.The
project involves the minor alteration of existing public facilities involving no expansion of use beyond
previously existing. The project will not result in the removal of any scenic resource.
IV. CONSEQUENCES OF NEGATIVE ACTION:
Delay in approving the project will result in a delay of design and construction and may jeopardize funding.
CONTRA COSTA COUNTYPUBLIC WORKS DEPARTMENT
255 GLACIER DRIVE, MARTINEZ, CALIFORNIA
DATE: FEBRUARY 13, 2003
TO: GINA MARTIN, Chief, Clerk of the Board
Attn: Emy Sharp, Deputy Clerk, Clerk of the Board
eshargcob.co.contra-costa.ca.us
FROM: Michael Hollingsworth, Assistant Public Works Director
313-2231
SUBJECT: Authorization to Advertise"Bayo Vista Area Curb Ramp Project"
This is your Authorization to advertise the attached Notice to Contractors for the "Bayo
Vista Area Curb Ramp" project and publish the Notice to Contractors under Public
Contract Code: 22037 in the Contra Costa Times
The attached Board Order authorizing the Public Works Director to advertise this project
was approved on: July 24, 2001 - e,.
The bid due date for this project is: April 1, 2003
Project No: 0662-6R4150-03