Loading...
HomeMy WebLinkAboutMINUTES - 06052001 - C.10 v TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: JUNE 5, 2001 i SUBJECT: APPROVE THE AGREEMENT BETWEEN CONTRA COSTA COUNTY,-AND THE SAN RAMON UNIFIED SCHOOL DISTRICT FOR THE CONSTRUCTION OF A RIGHT TURN ' LANE ON HEMME AVENUE AT THE RANCHO.ROMERO ELEMENTARY SCHOOL, ! ALAMO AREA. PROJECT NO.: 0662-6U4168 1 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE the agreement between Contra Costa County and the San Ramon Unified School District for the construction of a right turn lane on Hemme Avenue at! the Rancho Romero Elementary School, Alamo area. i AUTHORIZE the Chair of the Board of Supervisors to execute the Agreement. i J Continued on Attachment: X SIGNATURE: — 1 J J _RECOMMENDATION OF COUNTY ADMI IST ATOR _RECOMMENDATION OF BOARD COMMI APPROVE OTHER 1 SIGNATURE(S): ACTION OF BOARD ON June 5 , 2001 APPROVED AS RECOMMENDED xx OTHER hereby certify that/this is a true and correct copy of an action taken and entered on the minutes of the Board VOTE OF SUPERVISORS of Supervisors on the date shown. xx UNANIMOUS (ABSENT None ) AYES: NOES: ABSENT: ABSTAIN: ATTESTED: T11nP 5 1 90()]SK:je JOHN SWEETEN, Clerk of the Board of Supervisors G:\GrpData\TransEng\2001\Bo-TE\Rancho Romero Board Order.doc and County Administrator Orig.Div: Public Works(TE) Contact: Stephen Kowalewski(313-2225) c: M.Shiu, Public Works Director By `Sf Deputy Auditor/Controller i Public Works Accounting i J i I' / SUBJECT: APPROVE THE AGREEMENT BETWEEN CONTRA COSTA COUNTY AND THE SAN RAMON UNIFIED SCHOOL DISTRICT FOR THE CONSTRUCTION OF ARIGHT TURN LANE ON HEMME AVENUE AT THE RANCHO ROMERO ELEMENTARY SCHOOL, ALAMO AREA. PROJECT NO.: 0662-604168 DATE: JUNE 5, 2001 PAGE 2 OF 2 II. Financiallmpact: There will be no impact to the General Fund. The estimated cost of the project is $80,000. The project is funded 100% with County Road Funds. III. Reasons for Recommendations and Background: Hemme Avenue is a two lane narrow roadway in the Alamo area of Contra Costa County. Rancho Romero Elementary School is located on Hemme Avenue between Danville Boulevard and La Sonoma Drive. The number of parents driving their children to school has increased over the years. The increased vehicle volume has created a backup at the school that;extends onto Hemme Avenue. Through vehicles on Hemme Avenue must either wait for the line of vehicles to clear or pass on the left against oncoming traffic. To relieve this situation, the school has proposed a number of changes to their parking lot and drop-off area. These improvements will help alleviate the circulation problem at the school. In conjunction with the school's project, the County proposes to construct a right turn pocket into the school and re-stripe Hemme Avenue to provide an exclusive right turn lane and a through/right lane, thereby increasing the capacity and safety of the area. It is mutually agreed that merging the work into one design and construction contract administered by the School District should result in lower contract administration costs and a shorter delivery time. The purpose of the Agreement is to provide for the apportionment of duties and costs between the School District and the County for the inclusion of planned County work into the School District's design and construction contract. IV. Consequences of Negative Action: Failure to approve the agreement will result in the right turn lane not being constructed. I I i JOINT EXERCISE OF POWERS AGREEMENT BETWEEN CONTRA COSTA COUNTY AND THE SAN RAMON VALLEY UNIFIED SCHOOL DISTRICT FOR STREET IMPROVEMENTS ON HEMME AVENUE (County Project No.: 0662-6U4168) This AGREEMENT is entered into on the 5th day of June , 2001, between San Ramon Valley Unified School District, a California School District, hereinafter DISTRICT, and County of Contra Costa, a political subdivision of the State of California, hereinafter COUNTY, pursuant to Government Code section 6500, and following. The parties to this AGREEMENT mutually agree and promise as follows: 1. Purpose and Scope of Work. COUNTY desires to improve Hemme Avenue along the frontage of Rancho Romero Elementary School. DISTRICT plans to design and build parking lots and other landscape and park improvements to Rancho Romero Elementary School. It is mutually agreed that merging said work into one design and construction contract administered by DISTRICT should result in lower contract administration costs and a shorter project delivery time. The purpose of this AGREEMENT is to provide for the apportionment of duties and costs between DISTRICT and COUNTY for the inclusion of planned COUNTY work into DISTRICT'S design and construction contract. As used in this AGREEMENT, the term "PROJECT" shall refer only to COUNTY work on Hemme Avenue to provide a right turn pocket (described in further detail in Exhibit B) into Rancho Romero Elementary School. The PROJECT is contingent upon the simultaneous construction of the DISTRICT'S entire Rancho Romero Elementary School improvements. 2. Responsibilities of DISTRICT and COUNTY. A. DISTRICT shall be responsible for the following: (1) Act as lead agency. (2) Convey the necessary road right-of-way for PROJECT. (3) Obtain the necessary environmental clearance under the California Environmental Quality Act. (4) Develop the plans, specifications, and cost estimates for PROJECT based on County street standards. (5) Advertise and award the contract for PROJECT. (6) Obtain a no-fee encroachment permit from COUNTY to construct PROJECT. (7) Perform construction inspection, contract administration, and materials testing for PROJECT. (8) Approve and accept PROJECT as complete after approval by COUNTY. (9) Pay contractor for completed PROJECT work from COUNTY funds on deposit. 1 B. COUNTY shall be responsible for the following: (1) Provide DISTRICT with County design standards for PROJECT. (2) Review and approve the initial plans, specifications, and cost estimate and review again at 90%, and final design stages. (3) Approve PROJECT prior to acceptance by DISTRICT. (4) Provide a total maximum of $80,000 for design, construction engineering, construction contingencies, right of way engineering, real property dedication, environmental clearance, materials and testing, and construction of PROJECT. (5) Deposit engineer's initial cost estimate of PROJECT as identified in attached EXHIBIT A and A-2, with DISTRICT fourteen (14) days prior to DISTRICT advertising PROJECT. 3. Financial Responsibility. A. DISTRICT and COUNTY acknowledge and agree that all actual costs for design, construction engineering, construction contract plus 10% contingency, right of way engineering, real property dedication, environmental clearance, and materials testing for PROJECT as shown in attached EXHIBIT A and A-2, which is incorporated herein, shall be paid by COUNTY. The total of these costs shall not exceed $80,000. The DISTRICT will fund any costs for PROJECT including any change orders exceeding $80,000. B. COUNTY shall deposit $80,000 with DISTRICT to cover the PROJECT construction contract cost, 10% contingency, design, construction engineering, right of way engineering, environmental clearance, and materials testing costs as identified in EXHIBIT A and A-2, with DISTRICT fourteen (14) days prior to DISTRICT advertising PROJECT. C. DISTRICT shall prepare and deliver a report of PROJECT expenditures to COUNTY within one hundred twenty (120) days of the last DISTRICT construction contract payment. If PROJECT costs are less than the deposit paid by COUNTY, the excess shall be refunded to COUNTY within one hundred twenty (120) days of the last DISTRICT construction contract payment. D. Simple interest generated by COUNTY funds on deposit .with DISTRICT shall be credited to COUNTY'S account. E. DISTRICT may terminate this AGREEMENT (1) for COUNTY non- compliance of AGREEMENT or (2) should COUNTY approval of PROJECT delay advertising of DISTRICT construction contract. COUNTY may terminate this AGREEMENT for DISTRICT non-compliance of AGREEMENT. COUNTY shall still be obligated to pay DISTRICT for design engineering and any other DISTRICT costs associated with the elimination of PROJECT from the DISTRICT'S Rancho Romero Elementary School Improvements construction contract. 2 4. Change Orders. Change orders for PROJECT resulting in a design change from the original plans approved by COUNTY shall be reviewed and approved by COUNTY. COUNTY shall review the change order and submit any comments to DISTRICT within three (3) working days of receiving the change order from DISTRICT. 5. Insurance and Hold Harmless. A. The contract documents for PROJECT shall include provisions requiring the successful bidder to: (1) Secure and maintain in full force and effect during construction of PROJECT worker, s compensation and public liability and property damage insurance in forms and limits of liability satisfactory to DISTRICT and COUNTY, naming DISTRICT and COUNTY, their governing bodies, officers, agents, and employees as additional insureds. (2) Promise to hold harmless and indemnify COUNTY, its governing body, officers, agents, and employees from liability to the same extent as promised to DISTRICT. The aforementioned policy shall contain a provision that the insurance afforded thereby to the additional insureds shall be primary insurance to the full limits of the policy and that, if any of the additional insureds has other insurance or self-insurance against a loss covered by such policy, such insurance or self-insurance shall be excess insurance only. Before beginning construction of PROJECT, the contractor shall submit to DISTRICT and COUNTY a certificate of insurance evidencing the required coverage and requiring the carrier to give at least thirty (30) days written notice to DISTRICT and COUNTY of any cancellation, non-renewal, or material modification of the policy. DISTRICT shall be responsible for ensuring that this requirement has been met before allowing construction work to proceed. B. Neither DISTRICT, nor any officer, agent, or employee thereof, shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by COUNTY or in connection with any work delegated to COUNTY under this AGREEMENT, and COUNTY shall defend, indemnify, save, and hold harmless DISTRICT, its governing body, officers, agents, and employees, from the same. C. Neither COUNTY, nor any officer, agent, or employee thereof, shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by DISTRICT or in connection with any work delegated to DISTRICT under this AGREEMENT, and DISTRICT shall defend, indemnify, save, and hold harmless COUNTY, its governing body, officers, agents, and employees, from the same, except as provided otherwise in Section 7 below. 3 D. Nothing in this AGREEMENT is intended or shall be construed to effect the legal liability of either party to third parties by imposing any standard of care greater than that imposed by law. 6. Acceptance. Upon completion of PROJECT, COUNTY and DISTRICT shall conduct a final joint inspection. After COUNTY has determined that the work performed by the contractor has been completed to COUNTY's satisfaction, DISTRICT shall accept PROJECT as complete for itself and for COUNTY. COUNTY shall not unreasonably withhold or delay its determination of PROJECT completion. 7. Maintenance. After PROJECT is formally accepted by DISTRICT, COUNTY shall own PROJECT and assume total responsibility for maintenance of the PROJECT and shall defend, indemnify, save, and hold harmless DISTRICT, its governing body, officers, agents, and employees, against all claims, suits, actions, or liability that arises relating to the use, operation, or maintenance of PROJECT. 8. Restrictions. Pursuant to Government Code Section 6509, the powers of the parties under this AGREEMENT shall be subject to the restrictions on such powers applicable to DISTRICT. 9. Accountability. As required by Government Code Section 6505, both parties to this AGREEMENT shall provide a report providing strict accountability of all funds received and disbursed for PROJECT. 10. Agreement Modification. This AGREEMENT shall be subject to modification only with the written consent of the legislative bodies of both parties. Neither party shall unreasonably withhold its consent to modification for the implementation and accomplishment of the overall purpose for which this AGREEMENT is made. 11. Agreement Termination. In accordance with Section 3E, COUNTY upon payment to DISTRICT of all costs may terminate this AGREEMENT except for the provisions of Sections 513, 5C, and 7 above, which shall survive termination of this AGREEMENT. 12. Agreement Expiration. Except for the provisions of Sections 513, 5C and 7 above, this AGREEMENT shall expire upon delivery of the report of final costs or reimbursement of unspent funds deposited by COUNTY with DISTRICT. 13. Entire Agreement. This AGREEMENT contains the entire understanding of the parties relating to the subject matter of this AGREEMENT. Any representation or promise of the parties relating to the work shall not be enforceable unless it is contained in this AGREEMENT or in a subsequent written modification of this AGREEMENT executed by the legislative bodies of both parties. 4 CONTRA COSTA OUNTY By Cha' an, Boa�rd-oP50ervisors ATTEST: John Sweeten, Clerk of the Board of Supervisors and County Administrator By eputlr Recommend for Approval: Maurice M. Shiu, Public Works Director By Form Approved: Silvano B. Marchesi Bunt County S 09, Deput S�Zz/�I See continuation of signatures on page 6 5 SAN RAMON VALLEY SCHOOL DISTRICT By Superintendent of Schools Recommend for Approval: By Form Approved: DISTRICT Attorney By SK:je g:\GrpDala\TransEng\show\Project Development\Rancho Romero JEPA1-REVISED 5-8-01.doc January17,2001 6 EXHIBIT A SCOPE OF WORK FOR CONTRA COSTA COUNTY HEMME AVENUE RIGHT TURN LANE IMPROVEMENTS The following scope of work is intended to cover the items of work DISTRICT will do in order to complete the design and construction for the right turn improvements on Hemme Avenue adjacent to the Rancho Romero Elementary School. DISTRICT will add PROJECT to the DISTRICT'S Rancho Romero site improvement plans to encourage better bid prices and expediting the delivery time of PROJECT. DESIGN (Preliminary Engineering) 1. There will be two meetings with DISTRICT and COUNTY staff — a preliminary and final design field review of PROJECT. 2. COUNTY will supply DISTRICT with road geometry and traffic index. 3. DISTRICT will prepare plans, specifications, and engineer's estimate (PS&E). 4. COUNTY will review initial PS&E and again at 90%, and final completion and return comments to DISTRICT within seven days for each review. 5. DISTRICT will work with COUNTY to determine acceptable traffic control alternatives. 6. DISTRICT will advertise, award, and administer the construction contract. 7. DISTRICT will make changes to plans and send COUNTY two sets of record drawings (as-built plans) when PROJECT is complete. REAL PROPERTY DEDICATION 1. DISTRICT will convey to COUNTY the necessary road right of way for PROJECT. 2. DISTRICT will prepare all necessary legal descriptions and maps to convey road right of way for PROJECT. ENVIRONMENTAL 1. DISTRICT will process the necessary California Environmental Quality Act documents for environmental clearance for PROJECT. CONSTRUCTION ENGINEERING 1. DISTRICT will supply resident engineer, inspectors, and lab technicians and do all materials testing and plant inspections on project. COST ESTIMATE Design (EXHIBIT A-2) $10,000 Construction Inspection (EXHIBIT A-2) $10,000 Materials Testing (EXHIBIT A-2) $1,000 RW Engineering (EXHIBIT A-2) $1,500 Real Property Dedication (EXHIBIT A-2) $5,000 Environmental (EXHIBIT A-2) $2,000 Construction Contract (EXHIBIT A-2) $45,000 Contingency (EXHIBIT A-21 5 500 $80,000 7 EXHIBIT A-2 Transportation • -- Preliminary Cost Estimate Contra Costa County Department of Public Worts Project Name: 1 Icnmr Avenue Right Tum Widening Project location: Adjacent to Rancho Romero Clem School,Danville Project length: 65 M (Add 1211 x 205 It.Traffic[cute) Date of Estimate: 1/12/00 Revision No. 2 Revision bate 4/5/01 Prepared by: Warren I ai No. Description Quantity Units Unit Cost Total 1 Construction Area Signing 4 CA $150.00 $600.00 2 Clear and Grub 1 LS $1,200.00 $1,200.00 3 Traffic Control 1 I S $2,000.00 $2,000.00 4 Road Excavation 106 M3 $50.00 $5,300.00 5 Aggregate Base Class 2(300 nun) 172 TONTNE $50.00 $8,600.00 6 AsphaltConcrcte (150nmi) 88 TONNE $125.(X) $1 1,M).00 7 Minor Concrete,Club&Gutter 65 M $40.00 $2,600.00 8 Minor Concrete,Sidewalk(1.2 m wide) 78 M2 $45.00 $3.510.00 9 Striping 1 LS $1,500.00 $1,500.(X) 10 Signing 6 LS $150.00 $900.()0 11 Relocate Chain Link Fence 65 M $50.00 $3.250.00 12 Relocate[rain Inlet I EA $2,000.00 $2,0(X).00 13 450 nim RCII 10 M $175.00 $1,750.00 OTFIF.R COSTS: Preliminary Engineering(15%of Contract or$10k,Michever is>) $10.000.00 SUBTOTAL $44.210.(X) Construction Engineering(15%of Contract or$10k,whichever is>) $10,(M.00 O`[7-IER COSTS $29,500.00 RW Engineering $1,500.00 SUBTOTAL $73,710.00 Real Property CONTINGENCY* $5,421.00 Real Prop",Dedication $5,000.00 TOTAL $79,131.00 F'.nvirommntal $2400.00 Materials and Testing $1.000.00 Total OTHER COSTS $29,500.00 i> ROUNDEDTOTAL $80,000 111 *CONTfNGENCY is 10°o of(SUB I OTAL PILLS ConstntCtion Engineering) 8 EXHIBIT B DESCRIPTION Hemme Avenue Right Turn Lane Improvements Hemme Avenue is a two lane narrow roadway in the Alamo area of Contra Costa County. Rancho Romero Elementary School is located on Hemme Avenue between Danville Boulevard and La Sonoma Drive. The number of parents driving their children to school has increased over the years. The increased vehicle volume has created a backup at the school that extends onto Hemme Avenue. Through vehicles on Hemme Avenue must either wait for the line of vehicles to clear or pass on the left against oncoming traffic. To relieve this situation, the school has proposed a number of changes to their parking lot and drop-off area. These improvements will help alleviate the circulation problem at the school. In conjunction with the school's project, the County proposes to construct a right turn pocket into the school and re-stripe Hemme Avenue to provide an exclusive right turn lane and a through/right lane, thereby increasing the capacity and safety of the area. The PROJECT consists of furnishing all labor, materials, tools, equipment, and incidentals for installing, clearing and grubbing, traffic control, road excavation, placing aggregate base and asphalt concrete, constructing curb and gutter, constructing sidewalk, placing striping and signing, fence relocation, inlet relocation, and placement of reinforced concrete pipe, complete in place, including all work necessary to complete the PROJECT. 9