Loading...
HomeMy WebLinkAboutMINUTES - 06192001 - C.65 TOT BOARD OF SUPERVISORS l, ;� Contra Costa FROM: Dennis M. Barry, AICP `r Count Community Development Director T'(l'(rUNr DATE: June 19, 2001 SUBJECT: Execution of Required Legal Documents for the Phoenix Programs East County Homeless Shelter Rehabilitation Project SPECIFIC REQUEST(S) OR RECOMMENDATIONS(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS AUTHORIZE the Deputy Director, Redevelopment or his designee to (1) enter into Community Development Block Grant (CDBG) Project Agreement 00-11-HSG with Phoenix Programs, Inc. to provide $10,000 in FY 2000/01 CDBG funds for the East County Homeless Shelter Rehabilitation Project in Antioch, and (2) execute the required legal documents for this purpose. FISCAL IMPACT No General Fund impact. Funds for this project will come from FY 2 000/0 1 CDBG funds. CDBG funds are provided to the County on a formula allocation basis, through the U.S. Department of Housing and Urban Development (HUD). BACKGROUND/REASONS FOR RECOMMENDATIONS On April 25, 2000, the Board of Supervisors approved the allocation of$10,000 in FY 2000/01 CDBG funds to Phoenix Programs, Inc. for the East County Homeless Shelter Rehabilitation Project. The purpose of this project is to rehabilitate an existing 20-bed shelter for homeless mentally ill adults. CONTINUED ON ATTACHMENT: X YES SIGNATURE: _ COMMENDATION OF COUNTY ADMINISTRATOR RE OMME DATION OF OARD COMMITTEE _L,<CPPROVE _OTHER J SIGNATURE(S): . ACTION OF BOARD ON �� o� �D(APPROVED AS RECOMMENDED OTHER_ VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A Y�UNANIMOUS (ABSENT ' ) TRUE AND CORRECT COPY OF AN AYES: NOES: ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. Contact: Kara Douglas, 335-1253 ATTESTED WV_L 3 M) 1 Orig: Community Development JOHN SWEE N, CLERK cc: County Administrator OF THE BOARD OF SUPERVISORS County Counsel AND C UNTY ADMINISTRATOR Auditor-Controller BY / DEPUTY C .. COBG funds will be used for permits and fees and construction costs to assist in the rehabilitation of the homeless shelter. Required work includes the following: removing and replacing damaged floors in the bathrooms, kitchen, dining, and laundry rooms; and repairing plumbing leaks, water damaged sheetrock, rain gutters, outside wood trim, bathroom grout and caulking. A new heating, ventilation and air condition system will also be installed. CDBG funds will be provided as a loan with the following terms: 3 percent simple interest, deferred for 30- years. Phoenix will maintain the facility as emergency housing for mentally ill homeless adults for a minimum of 30-years. Legal documents, including, but not limited to a regulatory agreement and loan agreement, will be executed to memorialize the terms of this agreement. The total cost of this project is $58,507, which includes the following: Permits and fees $950 Construction 57,557 $58,507 Sources of funds in addition to CDBG include the City of Antioch, local community foundations, and Phoenix Programs. KD WAkdouglas\New\Board Orders\2001\Phoenix.doc