HomeMy WebLinkAboutMINUTES - 06122001 - C.9 TO: REDEVELOPMENT AGENCY
Contra
FROM: DENNIS M. BARRY, AICP
Costa
COMMUNITY DEVELOPMENT DIRECTOR i County
DATE: JUNE 12, 2001
SUBJECT: BAY POINT REDEVELOPMENT AREA DESIGN GUIDELINES
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS: As the Governing Board of the Contra Costa County
Redevelopment Agency, APPROVE and AUTHORIZE the Deputy Director -
Redevelopment to execute a contract with Cannon Design Group in the amount not to
exceed $21,000 for the preparation of Design Guidelines for the Bay Point
Redevelopment Area.
FISCAL IMPACT: No General Fund money will be used on this project. The project
costs are included in the 2000/2001 Bay Point Redevelopment Agency budget.
BACKGROUND/REASONS FOR RECOMMENDATIONS: The Community
Development Depart has initiated an area-wide rezoning for the Bay Point
Redevelopment Area. The Design Guidelines are an important component of the
proposed Planned-District Rezoning program.
CONTINUED ON ATTACHMENT: YES SIGNATURE
RECOMMENDATION OF EXECUTIVE DIRECTOR
RECOMMENDATION OF AGENCY COMMITTEE
✓APPROVE OTHER 7
SIGNATURE (S):
ACTION OF AGENCY June 12� 2001 APPROVED AS RECOMMENDED �_OTHER_
VOTE OF COMMISSIONERS I HEREBY CERTIFY THAT THIS IS A TRUE AND
X UNANIMOUS(ABSENT none ) CORRECT COPY OF AN ACTION TAKEN AND
AYES: NOES: ENTERED ON THE MINUTES OF THE
ABSENT: ABSTAIN: REDEVELOPMENT AGENCY ON THE DATE SHOWN
Contact: Maureen Toms, Community Development-335-1250 ATTESTED Jame 12, 2001
JOHN SWEETEN, AGENCY SECRETARY
cc: County Administrator
Auditor/Controller -
BY DEPUTY
U WAT\BayPoint\P-I\Board Order 6-12-01.doc
BAY POINT REDEVELOPMENT AREA
DESIGN GUIDELINES
Work Scope
The following work scope will be utilized in preparing a comprehensive design guidelines document for the Bay
Point Redevelopment Project Area to address site planning, site development and architectural design decisions for
mixed use, residential, industrial, and commercial uses. The document will incorporate the relevant guidelines
already prepared as a part of the Pittsburg/Bay Point BART Station Area Specific Plan.
Task 1: Site Reconnaissance
Consultant will conduct a physical reconnaissance of the area to identify existing building patterns, scale and site
development elements such as landscaping and fencing. Photographs will be taken and inventoried to describe
typical and important conditions.
Task 2: Regulations Review
Consultant will review relevant sections of the County General Plan and Zoning Ordinance that relate to
development within the Redevelopment Project Area.
Task 3: Staff Consultation
Consultant will meet with staff to review current conditions, anticipated changes and special concerns in the
Redevelopment Project Area that should be addressed in the design guidelines.
Task 4: Preliminary Guidelines
Consultant will development preliminary planning and design principles and guidelines for each use to be addressed
in the design guidelines document. These elements will be supported by diagrams, drawings and photographs, as
appropriate,to clearly convey the intent and substance of the principles and guidelines.These materials will serve as
the basis for discussing potential guidelines with staff, the subcommittee of the Redevelopment Project Area
Committee and others, as may be appropriate. Residential design guidelines will focus on infill projects, significant
horizontal or vertical additions, and site development elements that have an impact on the character of
neighborhoods(e.g., landscaping and fencing).
In addition, Consultant will suggest public sector improvements to provide a more positive link between use nodes
within the Project Area(e.g.,Willow Pass Road and the Marina).
Task 5: Preliminary Guidelines Review
Consultant will meet with staff and with the appropriate subcommittee of the Redevelopment Project Area
Committee and others,as may be appropriate,to discuss the Project Area design conditions and issues and to review
the Preliminary Design Guidelines. Up to three meetings will be included in this task.
Task 6: Draft Design Guidelines
Consultant will prepare an Administrative Draft of the guidelines document for staff review.The document contents
and format will be established jointly by the Consultant and staff. For planning and budgeting purposes, it is
assumed that the document will contain an Introduction and individual sections on the following:
1
` • General Guidelines
• Commercial Guidelines
• Mixed Use Guidelines
• Single Family Residential Guidelines
• Single Family Residential Guidelines
Each section will include site planning, building design, site development and signage guidelines and summaries of
intent.
Consultant will supply five bound and one camera-ready copy of the document prepared in PageMaker 6.5 format.
Following staff review, a Draft Bay Point Redevelopment Project Area Design Guidelines will be prepared to
incorporate changes and clarifications.
One bound copy for format and binding direction and one camera-ready copy of the document will be supplied.
Consultant,as an optional/additional task,will participate in one or more meetings with the Project Area Committee,
if requested,during review of the draft document.
Task 7: Final Document
Consultant will modify the document to incorporate changes and clarifications requested by the County. One
camera-ready and a digital file of the document will be provided.
Schedule
A mutually agreeable work schedule,not to exceed ninety(90)days,will be developed by the Consultant and staff.
Compensation
All work will be carried out by Larry L. Cannon, President of the Cannon Design Group. Consultant will be
compensated for actual hours devoted to the work scope based on Consultant's standard hourly rate of One hundred
and twenty dollars($120.00)per hour.
Direct expenses incurred to complete the scope of work will be billed at actual cost plus fifteen percent(15%).
Total compensation will not exceed twenty-one thousand dollars ($21,000), including all direct expenses, without
prior written authorization.
Detailed invoices will be submitted monthly for personnel time and expenses.
2
1
BAY POINT REDEVELOPMENT PROJECT AREA
DESIGN GUIDELINES
BUDGET
The following schedule represents an estimate of compensation for each work task.
This is for monitoring purposes only.
Actual time and expenses may vary from this estimate
so long as the total compensation does not exceed$21,000.
TASK COMPENSATION
Task 1: Site Reconnaissance $2,000
Task 2: Regulations Review $300
Task 3: Staff Consultation $500
Task 4: Preliminary Guidelines $3,200
Task 5: Preliminary Guidelines Review $1,500
Task 6: Draft Design Guidelines $12,500
Task 7: Final Document $1,000
TOTAL $21,000
Optional/Additional Meetings $600 per meeting