Loading...
HomeMy WebLinkAboutMINUTES - 05152001 - SD.3 . r s�.3 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on May 15, 2001 by the .following vote: AYES: NOES: SEE ATTACHED ADDENDUM FOR BOARD ACTION AND VOTE ABSENT: ABSTAIN: SUBJECT: GRANT permission to completely close all of Dougherty Road, for the purpose of realignment and reconstruction of a portion of Dougherty Road from the northerly San Ramon City limits to Bollinger Canyon Road, for Road Improvement Agreements RA 1103, RA 1104, and RA 1105 (XREF SUB 7984), in the Dougherty Valley area. BACKGROUND: The conditions of approval for SUB 7984 require Shapell Industries to reconstruct and realign Dougherty Road, from the northerly San Ramon City Limits to Bollinger Canyon Road. The newly aligned road will be graded for the ultimate alignment and will provide four through lanes of traffic, including left-turn lanes, medians, bike lanes, sidewalks, landscaping, and.traffic signals. The proposed improvements will also improve traffic circulation and public safety for the Coyote Creek Elementary School. To construct the ultimate roadway, approximately 250,000 cubic yards of embankment fill will need to be placed for the new Dougherty Road alignment. These embankment fills will be approximately 20-feet in height. The Public Works Department has reviewed the various construction phasing options with the applicant to determine how the improvements can be constructed most efficiently and provide the least amount of inconvenience to the traveling public and the adjacent elementary school. One of the reviewed options was to partially leave the road open to daily traffic and simultaneously place roadway fill adjacent to the traffic lanes. Each new phase would require grading, interim paving or surfacing, and the placement of interim striping and signs. This type of construction phasing could extend the construction schedule up to a year. Additionally, the public would be traveling through an active construction zone and would be subject to delays. We would also expect much of the traffic to divert to other routes during this time period. GAGrpData\BngSvc\B0\200f\BO 5-15-01.doc TR:lap 1 hereby certify that this is a true and correct copy of an action Originator:Public Works(:\PC) taken and entered on the minutes of the Board of Supervisors Contact: Teri Ric(313==2363) on the date shown. cc: Maurice Shiu,Director Julie Bucren,Administration Rob Tavenier,Traffic ATTESTED: May 15, 2001 Bob Hendry,APC JOEIN SWEETEN, Clerk of the Board of Supervisors and Mike Carlson,Construction Stan Matsumoto,Maintenance County Administrator Current Placating,Community Development C1-H, Sheriff-Patrol Div.Commander By , Deputy Mike Mentik,San Ramon Fire District Superindentent,San Ramon Unified School District John Dillon,Transportation Director,City of San Ramon Brian Welch,Transportation Director,Town of Danville Ray Kuzbari,Traffic Engineer,City of Dublin Chris Truebridge,Shape]]Industries SUBJECT: GRANT permission to completely close all of Dougherty Road, for the purpose of realignment and reconstruction of a portion of Dougherty Road from the northerly San Ramon City limits to Bollinger Canyon Road, for road Improvement Agreements RA 1103, RA 1104, and RA 1105 (XREF SUB 7984), in the Dougherty Valley area. DATE: May 15, 2001 PAGE: 2 The other alternative is to allow the applicant to completely close Dougherty Road to complete all the grading, most of the paving, and the installation of underground utilities during the summer months. It should be noted a major gas line providing service to the Danville/Blawkhawk area will need to be installed in this section of Dougherty Road and be operational by September 1, 2001. Once the pavement and underground utilities are installed,Dougherty Road could be safely reopened to traffic while the remainder of the work is completed. The complete closure of Dougherty Road, while the San Ramon Unified School District is out of session during the summer, is the reconunended alternative. IT IS BY THE BOARD ORDERED that permission is granted to Shapell Industries of Northern California to completely close Dougherty Road, from the northerly San Ramon City limits to the southerly San Ramon City limits, from June 18, 2001 through August 24, 2001, for a period of 24 hours a day, subject to the following conditions: 1. Shapell Industries shall obtain a road closure permit for the Dougherty Road closure and shall obtain an encroaclunent pen-nit for all work within the existing public right of way. 2. All work shall comply with road improvement plans: RA 1103 (Dougherty Road); RA 1104 (N. Gale Ridge Road); and .RA 1105 (Bollinger Canyon Road). 3. Traffic will be detoured via Interstate 680 and Interstate 580. 4. All signing to be in accordance with the State of California Manual of Traffic Controls. 5. Shapell Industries of Northern California shall comply with the requirements of the Ordinance Code of Contra Costa County. 6. Have on file with the County a Certificate of Insurance in the amount of$1,000,000 for Comprehensive General Public Liability, which names the County as an additional insured. 7. Obtain approval for the closure from the Sheriff's Department, the California Highway Patrol and the Fire District. 8. Liquidated damages will apply if the road closure extends beyond August 24, 2001. 9. Progress reports and construction schedules shall be submitted by the applicant to the Public Works Director every two weeks during the road closure. 10. The Public Works Director shall notify Supervisor Gerber one week in advance should staff believe the applicant cannot meet the August 24, 2001 deadline. ADDENDUM TO ITEM SD.3 May 1.5, 2001 On this day, the Board of Supervisors considered granting permission to Shapell Industries to completely close Dougherty Road, from June 18, 2001, to August 24, 2001, for the period of 24 hours a day, for the purpose of realignment and reconstruction of Dougherty Road from the northerly San Ramon city limits to Bollinger Canyon Road, in the Dougherty Valley area. Maurice Shiu, Public Works Director, presented the staff report. The Board discussed the matter, the public hearing was opened, and the following persons appeared to speak: Steve Savage, Project Manager, Shapell Industries; Herb Moniz, City of San Ramon, 2222 Camino Ramon, San Ramon; Peter Muller, 7 Bel Air, Orinda. All those desiring to speak having been heard, the Board continued their discussions. Supervisor Uilkema inquired if the Dougherty Valley Oversight Committee had voted for closure. Supervisor Gerber responded the committee had not voted. She informed the Board this closure was the least impact for the shortest time. Supervisor Gerber moved staffs recommendations and included direction that the Public Works Director notify her one week in advance should staff believe the project could be completed by the August 24, 2001, deadline. Supervisor Glover seconded the motion. The vote on the motion was as follows: AYES: SUPERVISORS GIOIA, GERBER, DeSAULNIER, GLOVER and UILKEMA NOES: NONE ABSENT: NONE ABSTAIN: NONE REQUEST TO SPEAR FORM % t (THREE (3) MINUTE LIMIT) Complete this form and place it in the box near the speakers' rostrum before addressing the Board. Name: Ci Phone: 7 �� Address: City: I am speaking for myself or organization: 5 vil.� Y/eS (name of organization) CHECK ONE: I wish to speak on Agenda Item # Date: My comments will be: general for against I wish to speak on the subject of I do not wish to speak but leave these comments for the Board to consider: REQUEST TO SPEAR FORM (THREE (3) MINUTE LIMIT) Complete this form and place it in the box near the speakers' rostrum before addressing the Board. Name: 1� t" i o JPhone: ��3 2 1� 3 ? Address:. 2222 C/1��' Jo r-+� City: QSC� I am speaking for myself or organization: C14 0-� S-a, � -�-► (name of organization) CHECK ONE: I wish to speak on Agenda Item # ��� Date: My comments will be: general against I wish to speak on the subject of I do not wish to speak but leave these comments for the Board to consider: REQUEST TO SPEAR FORM �. (THREE (3) MINUTE LIMIT) Complete this form and place it in the box near the speakers' rostrum be re addressing the Board. Name: Phone: Address: L� 0 1 City: I am speaking for myself or organization: (name of organization) CHECK ONE: I wish to speak on Agenda Item # Date: My comments will be: general 1/ for against I wish to speak on the subject of I do not wish to speak but leave these comments for the Board to consider: