Loading...
HomeMy WebLinkAboutMINUTES - 04032001 - C.1 rr N� A ' TO: BOARD OF SUPERVISORS FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR DATE: APRIL 3, 2001 SUBJECT: APPROVE AMENDMENT NUMBER 1 TO THE JOINT EXERCISE OF POWERS AGREEMENT WITH EBMUD FOR RELOCATION OF THE WATER MAIN CROSSING OF THE CUMMINGS SKYWAY EXTENSION PROJECT, CROCKETT AREA. PROJECT NUMBER: 0662-6R4062 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUNU AND JUSTIFICATION I. Recommended Action: AUTHORIZE the County Administrator, or their designee, to execute Amendment Number 1 to the Joint Exercise of Powers Agreement between Contra Costa County Public Works Department and East Bay Municipal Utility'District in the amount of $112,500 for a new payment total of $162,500. II. Financiallmpact: There will be not impact on the County General Fund. The $112,500 increase will be paid for by Rodeo/Crockett Mitigation Fund (50%) and State Funds (50%). Continued on Attachment: X SIGNATURE: _ RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON Apri 1 3 , 2001 APPROVED AS RECOMMENDED x OTHER VOTE OF SUPERVISORS X UNANIMOUS (ABSENT_ ) I hereby certify that this is a true and correct AYES: NOES: copy of an action taken and entered on the ABSENT: ABSTAIN: minutes of the Board of Supervisors on the date Maki g:\const\bo\2001\4-april\14-cse-jepaebmud.doc Shown Contact: Mike Carlson,(925)313-2321 Orig.Div: Public Works(Construction Division) cc: Auditor Controller County Administrator,Attn:E.Kuevor County Counsel,D.Schmidt PW- Accountin Construct g ATTESTED: April 3 , 2001 EBMUD Flood Coon ntrol JOHN SWEETEN, Clerk of the Board of Supervisors and County Administrator By : - De ut:y l SUBJECT: Approve Amendment Number 1 Joint Exercise of Powers Agreement with for the Cummings Skyway Extension Project, Crockett Area BOARD DATE: April 3, 2001 Page 2 of 2 III. Reasons for Recommendations and Background: The original agreement, effective October 14, 1997, required the County to pay for all costs incurred during the protection of East Bay Municipal Utility District's .24" water main into the roadway embankment built during the construction of the Cummings Skyway Extension Project. This amendment increases the maximum amount of actual costs payable to EBMUD. The Public Works Department constructed the Cummings Skyway Extension Project from Interstate 80 to San Pablo Avenue in the Crockett Area. As a result, approximately sixty feet of fill was placed over an existing 24" water main, owned by EBMUD. EBMUD agreed to allow the County to protect the 24" water main during the construction of the roadway embankment. The costs associated with the protection of this water main are the responsibility of the Public Works Department. During construction of the embankment, a leak was discovered in the 24" water main. Due to the service area of this water main, this situation was declared an emergency. EBMUD took immediate actions to correct the leak. Since the water main already had fill placed over it, it was determined the most efficient method to repair the leak was to construct a bypass water main instead of re-excavating the original water main. Per the County's original agreement, the County was responsible for all cost associated with the water main. Due to the nature of the situation, an amendment was not processed before or during this event. This amendment will reimburse all actual costs incurred by EBIMUD. The County has been negotiating with EBMUD since the completion of the project (December 15, 1998) and is pleased to reach an agreement that will pay EBMUD all actual costs pursuant to this agreement and shall release the County from any further obligation for reimbursement or payment claimed by EBMUD in connection with the project. IV. Consequences of Negative Action: A negative action would prohibit EBMUD from being paid for construction costs that they incurred.