HomeMy WebLinkAboutMINUTES - 04242001 - C.126 TO: BOARD OF SUPERVISORS
FROM: MAURICE M. SHIU, PUBLIC WORKS DIRECTOR
DATE: APRIL 24,2001
SUBJECT: AUTHORIZE THE PUBLIC WORKS DIRECTOR TO AMEND THE CONSULTING SERVICES AGREEMENT
WITH HARDING LAWSON ASSOCIATES (THE AMENDMENT WILL INCLUDE CHANGING THE
CONSULTANT'S NAME AND ADDRESS FROM HARDING LAWSON ASSOCIATES AT 105 DIGITAL
DRIVE, NOVATO, TO HARDING ESE AT 90 DIGITAL DRIVE, NOVATO; EXTENDING THE
COMPLETION DATE FROM JUNE 30, 2001 TO DECEMBER 31, 2001; AND INCREASING THE PAYMENT
LIMIT FROM $25,000 TO$63,700),COUNTYWIDE AREA. PROJECT NO.: VARIOUS
Specific Request(s) or Recommendation(s) & Background & Justification
1. RECOMMENDED ACTION:
AUTHORIZE the Public Works Director to AMEND the Consulting Services Agreement with Harding Lawson Associates
to provide "on-call" environmental consulting services for various projects throughout the County. The amendment will
include changing the consultant's name and address from Harding Lawson Associates at 105 Digital Drive, Novato, to
Harding ESE at 90 Digital Drive, Novato; extending the completion date from June 30, 2001 to December 31, 2001; and
increasing the payment limit from$25,000 to$63,700.
ftiltillued Attachment: X SIGNATURE:
COMMENDATION OF COUNTY ADMINISTRATOR
4ftOMMENDATION OF BOARD COMMITTEE
APPROVE —OTHER
SIGNATURE(S) ,�
�94_&
ACTION OF BO7 ON Ckf>A's oZ --10101 APPROVED AS RECOMMENDED_OTHER
VOTE OF SUPERVISORS
X UNANIMOUS(ABSENT ) I hereby certify that this is a true and correct copy of an action
AYES: NOES. taken and entered on the minutes of the Board of Supervisors on
ABSENT: ABSTAIN: the date shown.
ATTESTED: y DOO
L.C:sd
\\P W S4\SHARDA`I'A\Grp Data\EngSvc\EN V IRO\2001 JOHN SWEETEN, Clerk of the Board of Supervisors and County
Administrator
projects\ParkerAveUnderground\BOAmcndmcnt.doc
Orig. Div: Public Works(Eng. Services)
Contact: Leigh Chavez(313-2366) By , Deputy
cc: County Administrator,E. Kuevor
Auditor-Controller
PW Accounting-N.Francis
Enviro.-T.Torres
SUBJECT: AUTHORIZE THE PUBLIC WORKS DIRECTOR TO AMEND THE CONSULTING SERVICES AGREEMENT
WITH HARDING LAWSON ASSOCIATES (THE AMENDMENT WILL INCLUDE CHANGING THE
CONSULTANT'S NAME AND ADDRESS FROM HARDING LAWSON ASSOCIATES AT 105 DIGITAL
DRIVE, NOVATO, TO HARDING ESE AT 90 DIGITAL DRIVE, NOVATO; EXTENDING THE
COMPLETION DATE FROM JUNE 30, 2001 TO DECEMBER 31, 2001; AND INCREASING THE PAYMENT
LIMIT FROM $25,000 TO$63,700),COUNTYWIDE AREA. PROJECT NO.: VARIOUS
DATE: APRIL 24,2001
PAGE: 2
II. Financial Impact:
The estimated cost of the contract is $63,700 (original on-call contract amount of$25,000 + $38,700) funded by Flood
Control, Road,and Airport project funds(100%). -
III. REASONS FOR RECOMMENDATION/BACKGROUND:
Initially the expected scope of work for a project applied to the Consulting Services Agreement with Harding Lawson
Associates was relatively limited. Consulting services associated with the project were expected to cost under$25,000. The
limited scope was based on the assumption that the CEQA analysis for the project could heavily rely on the Specific Plan
EIR associated with the project. However, during the course of project definition and preliminary analysis, the consultant
determined that the previous EIR may not provide an adequate basis for the project specific CEQA document; therefore an
expanded scope will be necessary. It is our expectation that the CEQA analysis will likely require a Mitigated Negative
Declaration with supporting special studies. The revised scope will require amending the existing contract by increasing the
payment limit from $25,000 to $63,700 (an increase of$38,700). The bulk of the additional cost is associated with the need
for supporting studies—specifically the traffic and parking study.
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the Consulting Service Agreement is not amended, various flood control, road, and airport projects will not obtain CEQA
clearance causing delays in their construction and repair.
CONSULTING SERVICES AGREEMENT
AMENDMENT/EXTENSION AGREEMENT
1. Special Conditions. These Special Conditions are incorporated below by reference.
(a) Public Agency: Public Works Department
(b) Consultant's Name&Address: Harding Lawson Associates
105 Digital Drive
Novato, CA 94949
(c) Project Name,Number&Location: Name: Various(ON-CALL)
Proj.No. various
Location: Contra Costa County-wide
(d) Effective Date: July 11,2000
(e) Payment Limit(s): $25,000
(f) Completion Date(s): June 30,2001
(g) Federal Taxpayer's I.D.or Social Security Number: 68-0146861
2. Amendment of Consultant's Name and Address: the amended name and address of the above referenced firm is:
Harding ESE
90 Digital Drive
Novato,CA 94949
3. Extension of Term. The term of the above-described Contract between the parties hereto is hereby
extended from June 30,2001 to December 31,2001, unless sooner terminated as
provided in said contract.
4. Amendment Payment Limit. Increase the payment limit by$38,700 from$25,000 to the payment limit of$63,700.
5. Signatures. These signatures attest the parties'agreement hereto:
COUNTY OF CONTRA COSTA,CALIFORNIA CONSULTANT
Public Agency Consultant
By By
Maurice M. Shiu (Signature and business capacity)
Public Works Director
RECOMMENDED FOR APPROVAL:
By By
Environmental Planner (Signature and business capacity)
Note to Contractor:For corporations(profit or nonprofit),the contract must be signed by two officers. Signature A must be that of the president or vice president and Signature B must be that
of the secretary or assistant secretary(Civil Code Section 1190 and Corporations Code Section 313). All signatures must be acknowledged as set forth on page two.
G:\GrpData\EngSvc\ENVIRO\Admin\CSR's\2001\Agreements\Harding ESE(2000-2001)-Amendment.doc
Cc: PROJECT FILE-Parker Ave.Underground(1..Chavez-Enviro)