Loading...
HomeMy WebLinkAboutMINUTES - 03212000 - SD5 345-9802/C.5.2.1 TO: BOARD OF SUPERVISORS FROM: BARTON J. GILBERT, DIRECTOR OF GENERAL, SERVICES Contra Costa DATE: March 21, 2000 County SUBJECT: APPROVING AND AUTHORIZING EXECUTION OF CHANGE ORDER NO. 6 TO CONTRACT FOR TENANT IMPROVEMENTS AT LOS MEDANOS HEALTH CENTER, 2311 LOVERIDGE ROAD,FOR HEALTH SERVICES (WH604B) SPECIFIC REQUESTS OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE Change Order No. 6 to the Contract dated June 15, 1999 for construction of Tenant Improvements at Los Medanos Health Center, 2311 Loveridge Road, Pittsburg, with Len, Construction, Inc., Burlingame, California, and AUTHORIZE the Director of General Services to execute the Change Order, which provides for support of existing electrical conduits and junction boxes in accordance with current code requirements, replacement of existing corroded mechanical system control valves, and changes to the installation of cable tray and conduit sleeves for telecommunications wiring. This change order increases the Contract Price by a total of$373,379.00,and increases the contract completion time by 81 days. 11. FINANCIAL IMPACT The additional cost of this change order is within the budget recognized by the Board on November 16, 1999. III. REASONS FOR RECOMMENDATIONS/BACKGROUND A. After construction began, the contractor discovered that many existing electrical conduits and junction boxes are not supported in compliance with current code requirements. Change Order 6, Item 6-1 provides for this code-required support to be installed on conduits and junction boxes affected by the work of this contract. B. The original scope of work includes replacing the old, non-functional pneumatic mechanical control system with a modern digital control system. This requires the replacement of the internal valve components at all existing mechanical terminal units. During construction, however, the contractor discovered that many of the existing mechanical control valve bodies were corroded and unusable. Change Order 6,Item 6-2 provides for the replacement of the existing control valves with new at all existing mechanical terminal units. This item addresses some of the unanticipated mechanical problems acknowledged by the Board on November 16, 1999. C. The original scope of work includes installing new cable trays and conduit sleeves above the ceilings of all five floors for new telecommunications wiring. During construction the contractor discovered that a significant portion of the planned installation of the cable tray was in areas that were not accessible due to interference by existing utilities. Change Order 6, Item 6-3 provides for changes to that installation so that the cable tray will be accessible, and adds conduit sleeves to carry the wiring through inaccessible areas. CONTINUED ON ATTACHMENT: YES SIGNATURE: �RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE ._.•-AI�PROVE OTHER SIGNATURE(S): !' ACTION OF BOARD 6N APPROVED AS RECOMMENDED VOTE OF SUPERVISORS UNANIMOUS{ABSENT 4e917 ) AYES: NOES: ABSENTS: ABSTAIN: MEDIA CONTACT: BARTON J.GILBERT(313-7100) CC: General Services Department I HEREBY CERTIFY THAT THIS IS A TRUE Architectural Division AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED ON THE MINUTES OF THE BOARD Accounting OF SUPERVISORS 0 DATE S OWN. File: 345-98021A.5 .y'" County Administrator's Office ATTESTED County Counsel PHIL BATCHELOR,CLER OF THE BOARD OF Contract Compliance Officer SUPERVISORS AND COUNTY ADMINISTRATOR Contractor(Via A/D) Consulting Project Manager(Via A/D) BY DEPUTY H:\1998\3459802\BL002270b.doc SJ:cm Page 1 of 1 M382(10/88) CONTRA COSTA COUNTY GENERAL SERVICES DEPARTMENT ARCHITECTURAL DIVISION 1220 MORELLO AVENUE, SUITE 100 MARTINEZ, CALIFORNIA 94553-4711 (925) 313-7200 FAX(925) 313-7299 Effective Date: March 21, 2000 CHANGE ORDER NO. 6 File: 345-9802JC.5.2 Contract for Construction of: TENANT IMPROVEMENTS AT LOS MEDANOS HEALTH CENTER, 2311 LOVERIDGE ROAD,PITTSBURG FOR HEALTH SERVICES Effective Date of Contract: June 15, 1999 Authorization No.: WH604B TO: LEM CONSTRUCTION INC. 1870 OGDEN DRIVE BURLINGAME, CA 94010 You are directed to make the following changes in this Contract: Item 6-1: Reference: QCQ No. 13, Proposal Request No. 11 dated December 10, 1999 Furnish and install all labor and materials required for the support of existing electrical conduits and junction boxes in compliance with current code requirements. This work is required by the County Building Inspection Department due to the lack of proper support of these existing items. The work shall be done in accordance with the attached Proposal Request No. 11. ADD: $ 41,602.00 Item 6-2: Reference: QCQ No. 25, Proposal Request No. 12 dated November 4, 1999 Furnish and install all labor and materials required for installation of new automatic control valves at all mechanical terminal units. The original scope of work required only that the internal valve components be replaced,but many of these valves were discovered to be badly corroded and unusable. The work shall be done in accordance with the attached Proposal Request No. 12. Extend the contract completion time by 81 days. ADD: $284,799.00 Item 6-3: Reference: QCQ No. 32, Proposal Request No. 15 dated November 5, 1999 Furnish and install all labor and materials required for altering the layout and installing additional cable tray and conduit sleeves for the telecommunications cabling throughout the building. These changes and additions are required due to the congested and inaccessible nature of some of the ceiling spaces where the cable tray was originally to be installed. This condition was not apparent until after demolition of the existing ceiling was underway. The scope of work shall be in accordance with the attached Proposal Request No. 15. p (�/� ADD. $ 46,978.00 REASON FOR CHANGE: ( )Design Deficiencies ( ) Criteria Change by Owner {x)Differing Site Conditions (Items 6-1, 2, 3) ATTACHMENTS: Item 6-1: Proposal Request No. 11, dated December 10, 1999, 1 page, 8l2 x 11 inches, with attachment. Item 6-2: Proposal Request No. 12, dated November 4, 1999, 1 page, 8112 x 11 inches,with attachment. Item 6-3: Proposal Request No. 15, dated November 5, 1999, 1 page, 8112 x 11 inches, with attachments The Original Contract Price was...................................................................................................$ 4,155,842.00 Net Change by previously approved Change Orders....................................................................$ 551,373.57 The Contract Price before this Change Order was........................................................................$ 4,707,215.57 The Contract Price will be increased by this Change Order..................................................$ 373,379.00 The new Contract Price, including this Change Order will be.....................................................$ 5,080,594.57 The Completion Time will be increased by 81 calendar days. The Contract Completion Date as of the date of this Change Order therefore is October 2,2000. HAI998\3459802\8L002269g.doo Page 1 of 2 Change Order No. 6 Effective Date: March 21, 2000 TENANT IMPROVEMENTS AT LOS MEDANOS HEALTH 345-9802/C.5.2 CENTER, 2311 LOVERIDGE ROAD, PITTSBURG FOR HEALTH SERVICES RECOMMENDED BY: Consulting Architect Project Manager Architectural Services Manager Not valid until signed by both the Public Agency and the Contractor. By signature below, Contractor indicates acceptance of price stated herein as full compensation for all direct and indirect costs for all work described above, and as full compensation for any effects this change may have on the project in its entirety and/or on the time required to complete the project. PUBLIC AGENCY: CONTRACTOR: By By Contra Costa County Date Authorized Officer Date Director of General Services GC:tb HAI 998\345980218UO2269g.doc Page 2 of 2 Y27,5' TO: BOARD OFSUPERVISORS 345-980210.5.2.1 FROM: BARTON J. GILBERT, DIRECTOR OF GENERAL SERVICES Contra Costa DATE: March 21, 2000 County SUBJECT: APPROVING AND AUTHORIZING EXECUTION OF CHANGE ORDER NO. 7 TO CONTRACT FOR TENANT IMPROVEMENTS AT LOS MEDANOS HEALTH CENTER, 2311 LOVERIDGE ROAD,FOR HEALTH SERVICES (WH604B) SPECIFIC REQUESTS OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION 1. RECOMMENDATION APPROVE Change Order No. 7 to the Contract dated June 15, 1999 for construction of Tenant Improvements at Los Medanos Health Center, 2311 Loveridge Road, Pittsburg, with Lem Construction, Inc., Burlingame, California, and AUTHORIZE the Director of General Services to execute the Change Order, which provides for replacement of existing corroded mechanical system reheat coil connection assemblies. This change order increases the Contract Price by a total of$402,120.00, and increases the contract completion time by 52 days. II. FINANCIAL IMPACT The additional cost of this change order is within the budget recognized by the Board on November 16, 1999. III. REASONS FOR RECOMMENDATIONS/BACKGROUND A. After construction began, the contractor discovered that many components of the existing mechanical reheat coil connection assemblies on floors one through four were corroded and leaking and therefore required replacement. (The fifth floor improvements were constructed in 1990, are therefore 14 years newer than the rest of the facility, and the reheat coil connection assemblies on that floor are in good condition.) Change Order 7 provides for the replacement of the existing reheat coil connection assemblies with new on floors one through four. B. This condition is similar to the damage found at the mechanical control valves and the central mechanical plant as described in the February 5, 1999 report by Mechanical Consulting Company and acknowledged by the Board on November 16, 1999. CONTINUED ON ATTACHMENT: YES SIGNATURE: &&k&Jf _RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE _ 4�APPROVE OTHER SIGNATURE(S): p_ ,`' c1� ,• ACTION OF BOARD�4 d ('h lT APPROVED AS RECOMMENDED VOTE OF SUPERVISORS UNANIMOUS(ABSENT y1 t !?e. AYES: NOES: ABSENTS: ABSTAIN; MEDIA CONTACT: BARTON J.GILBERT(313-7100) CC: General Services Department I HEREBY CERTIFY THAT THIS IS A TRUE Architectural Division AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED ON THE MINUTES OF THE BOARD Accounting OF SUPERVISORSON HE DATE SHOWN. File: 345-9802/A.5 County Administrator's Office ATTESTED County Counsel PHIL BATCHELOR,CLERK"OF THE BOARD OF Contract Compliance Officer SUPERVISORS AND COUNTY ADMINISTRATOR Contractor(Via AID) Consulting Project Manager(Via A/D) BY DEPUTY H:\1998\3459802\8L002278b.doc GC:tb Page 1 of 1 M382(10/88) SV 6 CONTRA COSTA COUNTY GENERAL SERVICES DEPARTMENT ARCHITECTURAL,DIVISION 1220 MORELLO AVENUE, SUITE 100 MARTINEZ, CALIFORNIA 94553-4711 (925) 313-7200 FAX(925) 313-7299 Effective Date: March 21, 2000 CHANGE ORDER NO. 7 File: 345-9802/C.5.2 Contract for Construction of: TENANT IMPROVEMENTS AT LOS MEDANOS HEALTH CENTER, 2311 LOVERIDGE ROAD, PITTSBURG FOR HEALTH SERVICES Effective Date of Contract: June 15, 1999 Authorization No.: WH604B TO: LEM CONSTRUCTION INC. 1870 OGDEN DRIVE BURLINGAME, CA 94010 You are directed to make the following changes in this Contract: Item 7-1: Reference: QCQ's No. 24 and 26,Proposal Request No. 13 dated December 10, 1999 Furnish and install all labor and materials required for replacement of the existing mechanical reheat coil connection assemblies on floors one through four. This work is required due to leaks and corrosion in the existing assemblies, making them unusable. The work shall be done in accordance with the attached Proposal Request No. 13. Extend the contract completion time by 74 days. ADD: $402,120.00 REASON FOR CHANGE: { )Design Deficiencies { ) Criteria Change by Owner {x ) Differing Site Conditions (Item 7-1) ATTACHMENTS: Item 7-1: Proposal Request No. 13, dated November 4, 1999, 1 page, 8112 x 11 inches,with attachments. The Original Contract Price was....... ............................. .............................. $ 4,155,842.00 Net Change by previously approved Change Orders....... ......... ....................................... .........$ 924,752.57 The Contract Price before this Change Order was........................................................................$ 5,080,594.57 The Contract Price will be increased by this Change Order..................................................$ 402,120.00 The new Contract Price, including this Change Order will be.....................................................$ 5,482,714.57 The Completion Time will be increased by 74 calendar days. The Contract Completion Date as of the date of this Change Order therefore is December 15, 2000. RECOMMENDED BY: Consulting Architect Project Manager Architectural Services Manager Not valid until signed by both the Public Agency and the Contractor. By signature below, Contractor indicates acceptance of price stated herein as full compensation for all direct and indirect costs for all work described above, and as full compensation for any effects this change may have on the project in its entirety and/or on the time required to complete the project. PUBLIC AGENCY: CONTRACTOR: By BY Contra Costa County Date Authorized Officer Date Director of General Services CC:tb HAI 998\34598021$L00227Ig.doc Page 1 of 1 40 345-9802/C.5.2.1 TO: BOARD OF SUPERVISORS FROM: BARTON J. GILBERT, DIRECTOR OF GENERAL SERVICES Contra Costa DATE: March 21, 2000 County SUBJECT: APPROVING AND AUTHORIZING EXECUTION OF CHANGE ORDER NO. 8 TO CONTRACT FOR TENANT IMPROVEMENTS AT LOS MEDANOS HEALTH CENTER, 2311 LOVERIDGE ROAD,FOR HEALTH SERVICES (WH604B) SPECIFIC REQUESTS OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE Change Order No. 8 to the Contract dated June 15, 1999 for construction of Tenant Improvements at Los Medanos Health Center, 2311 Loveridge Road, Pittsburg, with Lem Construction, Inc., Burlingame, California, and AUTHORIZE the Director of General Services to execute the Change Order, which provides for replacement of existing damaged domestic water valves on floors one and three. This change order increases the Contract Price by a total of$306,632.00. II. FINANCIAL IMPACT The additional cost of this change order is within the budget recognized by the Board on November 16, 1999. III. REASONS FOR RECOMMENDADONS/BACKGROILM A. After construction began, the contractor discovered that many of the existing domestic water valves are corroded, leaking and cannot be fully closed, and therefore require replacement. B. The bulk of these valves are on floors one and three. Some of the valves in the first floor ceiling space are currently feeding the second floor. Due to the small amount of space being utilized by Health Services on the second floor at the conclusion of this project, the second floor will be supplied by a new system. This means that the failed existing domestic water valves in the ceiling space of the first floor that feed the second floor can be removed and the lines capped, rather than replace these valves. C. Change Order 8 provides for the replacement of existing domestic water valves with new on floors one and three. CONTINUED ON ATTACHMENT: YES SIGNATURE: &*A1NAV_+ FZECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): r ACTION OF BOARD 6N,/ APPROVED AS RECOMMENDED VOTE OF SUPERVISORS X_ UNANIMOUS(ABSENT 17 Uh !!- } AYES: NOES: ABSENTS: ABSTAIN: MEDIA CONTACT: BARTON J.GILBERT(313-7100) CC: General Services Department I HEREBY CERTIFY THAT THIS IS A TRUE Architectural Division AND CORRECT COPY OF AN ACTION TAKEN Accounting AND ENTERED ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. File: 345-9802/A.5 County Administrator's Office ATTESTED /' County Counsel PHIL BATCHELOR,CLERK F THE BOARD OF Contract Compliance Officer SUPERVISORS AND COUNTY ADMINISTRATOR Contractor(Via A/D) Consulting Project Manager(Via A/D) BY DEPUTY H:\1998\3459802\8L002279b.doc GC:tb Page 1 of 1 M382(10188) CONTRA COSTA COUNTY GENERAL SERVICES DEPARTMENT ARCHITECTURAL,DIVISION 1220 MORELLO AVENUE, SUITE 100 MARTINEZ, CALIFORNIA 94553-4711 (925) 313-7200 FAX(925) 313-7299 Effective Date: March 21, 2000 CHANGE ORDER NO, 8 File: 345-9802/C.5.2 Contract for Construction of. TENANT IMPROVEMENTS AT LOS MEDANOS HEALTH CENTER, 2311 LOVERIDGE ROAD,PITTSBURG FOR HEALTH SERVICES Effective Date of Contract: June 15, 1999 Authorization No.: WH604B TO: LEM CONSTRUCTION INC. 1870 OGDEN DRIVE BURLINGAME, CA 94010 You are directed to make the following changes in this Contract: Item 8-1: Reference: QCQ No. 17, Proposal Request No. 38 dated December 20, 1999 Furnish and install all labor and materials required for replacement of existing domestic water valves on floors one and three. This work is required due to leaks and corrosion in many of the existing valves, making them unreliable or unusable. The work shall be done in accordance with the attached Proposal Request No. 38. ADD: $306,632.00 REASON FOR CHANGE: ( )Design Deficiencies ( ) Criteria Change by Owner (x ) Differing Site Conditions (Item 8-1) ATTACHMENTS: Item 8-1: Proposal Request No. 38, dated December 20, 1999, 1 page, 8%Z x 11 inches, with attachments The Original Contract Price was...................................................................................................$ 4,155,842.00 Net Change by previously approved Change Orders....................................................................$ 1,326,872.57 The Contract Price before this Change Order was........................................................................$ 5,482,714.57 The Contract Price will be increased by this Change Order..................................................$ 306,632.00 The new Contract Price, including this Change Order will be.....................................................$ 5,789,346.57 The Completion Time will be unchanged. The Contract Completion Date as of the date of this Change Order therefore is December 15, 2000. RECOMMENDED BY: Consulting Architect Project Manager Architectural Services Manager Not valid until signed by both the Public Agency and the Contractor. By signature below, Contractor indicates acceptance of price stated herein as full compensation for all direct and indirect costs for all work described above, and as full compensation for any effects this change may have on the project in its entirety and/or on the time required to complete the project. PUBLIC AGENCY: CONTRACTOR: By ByContra Costa County Date Authorized Officer Date Director of General Services GC:tb HAI998\3459802\8L002272g.doc Page 1 of 1 � To: BOARD OF SUPERVISORS 345-9802/C.5.2.1 FROM: BARTON J. GILBERT,DIRECTOR OF GENERAL SERVICES Contra Costa DATE: March 21, 2000 County SUBJECT: APPROVING AND AUTHORIZING EXECUTION OF CHANGE ORDER NO. 9 TO CONTRACT FOR TENANT IMPROVEMENTS AT LOS MEDANOS HEALTH CENTER, 2311 LOVERIDGE ROAD,FOR HEALTH SERVICES (WH604B) SPECIFIC REQUESTS OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION T. RECOM EMATION APPROVE Change Order No. 9 to the Contract dated June 15, 1999 for construction of Tenant Improvements at Los Medanos Health Center, 2.311 Loveridge Road, Pittsburg, with Lem Construction, Inc., Burlingame, California, and AUTHORIZE the Director of General Services to execute the Change Order, which provides for abatement of existing fire dampers with asbestos-coated damper blades, and for the demolition of existing wall and ceiling finishes as required for demolition (and subsequent replacement) of the existing cast iron soil and vent pipes. This change order increases the Contract Price by a total of$256,400.00. II. FINANCIAL IMPACT The additional cost of this change order is within the budget recognized by the Board on November 16, 1999. III. REASONS FOR RECOMMENDATIONS/B,4C&QRt`)iINT) A. After construction began, the contractor discovered that several of the existing ceiling-mounted fire dampers had damper blades that were coated with an asbestos-containing material. Clayton Environmental, an industrial hygiene firm, analyzed the material and determined that it was classified as hazardous waste under State and Federal regulations. Change Order 9, Item 9-1 provides for the abatement of this hazardous waste. B. Demolition of the existing wall and ceiling finishes is required before replacement of the existing failed cast iron soil and vent piping system can be undertaken. Change Order 9, Item 9-2 provides for the demolition of these finish materials in accordance with the direction given by the Board on November 16, 1999. CONTINUED ON ATTACHMENT: YES SIGNATURE: Qs� RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON ge gO APPROVED AS RECOMMENDED VOTE OF SUPERVISORS UNANIMOUS(ABSENT AYES: NOES: ABSENTS: ABSTAIN: MEDIA CONTACT: BARTON J.GILBERT(3137100) CC: General Services Department I HEREBY CERTIFY THAT THIS IS A TRUE Architectural Division AND CORRECT COPY OF AN ACTION TAKEN Accounting AND ENTERED ON THE MINUTES OF THE BOARD OF SUPERVISORS E DATE SH N. File: 345-9802/A.5 County Administrator's Office ATTESTEDdc/ 91 *� County Counsel PHIL BATCHELOR,CLERK OF HE BOARD OF Contract Compliance Officer SUPERVISORS AND COUNTY ADMINISTRATOR Contractor(Via A/D) Consulting Project Manager(Via AID) BY DEPUTY H:\1998\3459802\8L002280b.doc GC:tb Page 1 of 1 M382(10/88) CONTRA COSTA COUNTY GENERAL SERVICES DEPARTMENT ARCHITECTURAL DIVISION 1220 MORELLO AVENUE, SUITE 100 MARTINEZ, CALIFORNIA 94553-4711 (925) 313-7200 FAX(925) 313-7299 Effective Date: March 21, 2000 CHANGE ORDER NO. 9 File: 345-9802/C.5.2 Contract for Construction of: TENANT IMPROVEMENTS AT LOS MEDANOS HEALTH CENTER, 2311 LOVERIDGE ROAD, PITTSBURG FOR HEALTH SERVICES Effective Date of Contract: June 15, 1999 Authorization No.: VM604B TO: LEM CONSTRUCTION INC. 1870 OGDEN DRIVE BURLINGAME, CA 94010 You are directed to make the following changes in this Contract: Item 9-1: Reference: QCQ No. 118, Proposal Request No. 33 dated January 3, 2000 Furnish and install all labor and materials required for the abatement of existing fire dampers equipped with asbestos-coated damper blades. The existence of asbestos on these dampers was an unforeseen condition discovered during construction. The work shall be done in accordance with the attached Proposal Request No. 33. ADD: $ 53,023.00 Item 9-2: Reference: QCQ No. 111, Proposal Request No. 36, part 1, dated December 14, 1999 Furnish all labor and materials required for demolition of existing wall and ceiling finishes required for access to the existing cast iron soil and vent piping system. This work is required prior to replacement of the piping system; replacement is required due to leaks and corrosion in many of the existing pipes, making them unreliable or unusable. The work shall be done in accordance with the attached Proposal Request No. 38. ADD: $203,377.00 REASON FOR CHANGE: ( )Design Deficiencies ( ) Criteria Change by Owner (x) Differing Site Conditions (Items 9-1, 2) ATTACHMENTS: Item 9-1: Proposal Request No. 33, dated January 3, 2000, 1 page, 8z/2 x 11 inches, with attachments. Item 9-2: Proposal Request No. 36, dated December 14, 1999, 1 page, 8'/z x 11 inches,with attachments The Original Contract Price was...................................................................................................$ 4,155,842.00 Net Change by previously approved Change Orders....................................................................$ 1,633,504.57 The Contract Price before this Change Order was........................................................................$ 5,789,346.57 The Contract Price will be increased by this Change Order..................................................$ 2569400.00 The new Contract Price, including this Change Order will be.....................................................$ 6,045,746.57 The Completion Time will be unchanged. The Contract Completion Date as of the date of this Change Order therefore is December 15, 2000._ RECOMMENDED BY: Consulting Architect Project Manager Architectural Services Manager Not valid until signed by both the Public Agency and the Contractor. By signature below, Contractor indicates acceptance of price stated herein as full compensation for all direct and indirect costs for all work described above, and as full compensation for any effects this change may have on the project in its entirety and/or on the time required to complete the project. PUBLIC AGENCY: CONTRACTOR: By By Contra Costa County Date Authorized Officer Date Director of General Services GC.tb HAI 998\3459802\8LOO2273g.aoc Page 1 of 1 345-9802(L)IA.1.1.6,,0 TO: BOARD OF SUPERVISORS FROM: BARTON J. GILBERT, DIRECTOR OF GENERAL SERVICES Contra Costa DATE: March 21, 2000 County SUBJECT: APPROVING THE SECOND AMENDMENT TO THE CONSULTING SERVICES AGREEMENT FOR TENANT IMPROVEMENTS,LOS MEDANOS HEALTH CENTER,2311 LOVERIDGE RD,PITTSBURG,FOR HEALTH SERVICES DEPARTMENT SPECIFIC REQUESTS OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. RECOMMENDATION A. APPROVE a Second Amendment authorizing extra work under the Consulting Services Agreement dated December 1, 1998, with RGM & Associates, for Tenant Improvements, Los Medanos Health Center, 2311 Loveridge Road, Pittsburg, for Health Services Department. The Second Amendment increases the scope of services and increases the Payment Limit, from $412,423.12 to $578,877.99 an increase of$166,454.87. B. AUTHORIZE The Director of General Services to execute the Second Amendment to the consulting services agreement, and to issue written authorizations for extra work, in addition to the authorization for the Second Amendment, provided that the cumulative total extra cost for such additional authorizations shall not exceed$25,000.00. 11. FTN N TAT.ICAC"j Sufficient funds are available in the bond financing for this project to cover this increase in the Consultant's payment limit. CONTINUED ON ATTACHMENT: YES SIGNATURE: __RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER i SIGNATURE(S): ACTION OF BOARD � "� APPROVED AS RECOMMENDED VOTE OF SUPERVISORS y� UNANIMOUS(ABSENT !t-Z) } AYES: NOES: ABSENTS: ABSTAIN: MEDIA CONTACT: BARTON J.GILBERT(313-7100) CC: General Services Department I HEREBY CERTIFY THAT THIS IS A TRUE Architectural Division AND CORRECT COPY OF AN ACTION TAKEN Accounting AND ENTERED ON THE MINUTES OF THE BOARD File:345-9802/A OF SUPERV=EDATECounty Administrator's Office ATTESTECounty Counsel F THE BOARD OF Health Services Y ADMINISTRATOR Consultant(Via A/D) BY - DEPUTY H:\1998\3458802\8L002275b.doc Page 1 of 2 M382(10/88) APPROVING THE SECOND AMENDMENT TO THE CONSULTING 345-9802(L)/A.1.1.6 / SERVICES AGREEMENT FOR TENANT IMPROVEMENTS, LOS March 21, 2000 MEDANOS HEALTH CENTER, 2311 LOVERIDGE RD,PITTSBURG, FOR HEALTH SERVICES DEPARTMENT 111, MASONS FOR RE OMMF ATIONS/BA KQRO lND A. The Director of General Services executed a consulting service agreement with RGM & Associates effective December 1, 1998, for project management and technical support services during the Tenant Improvements at Los Medanos Health Center, 2311 Loveridge Road, Pittsburg, for Health Services Department. B. The First Amendment increased the scope to authorize investigation of the heaving slab and cast iron pipe failure, provide solution for repairs and provide construction administration during the alterations and repairs. C. The Second Amendment increases project scope to include: 1. Coordination of architectural design, contractor negotiations and construction administration services for Second Floor Dental Suite. 2. Construction administration services required to coordinate with Health Services, Architect and Engineers to evaluate structural and electrical requirements that will accommodate new radiological equipment. 3. Construction administration services required to change mechanical system from the existing "Constant Volume System"to a new"Variable Air Volume System". 4. Design, proposal evaluation and construction administration services for Central Plant Improvements as a Change Order to original Construction Contract and as a separate bid package. Separate bid package includes document review, site visits, preparation of bid package, addendum, bid evaluation, contract award and construction management services. 5. Provide coordination efforts with equipment and furniture planning and inventory services consultant. 6. Prepare separate bid packages and addenda, assist with bid evaluations and contract award, and provide additional construction administration services, as required by the increase in scope from that anticipated under the First Amendment for the cast iron soil pipe replacement work. LS:ih HA199813459802i8L002275b.doc Paye 2 of 2 M382(10188) File:345-9802(14A SECOND AMENDMENT TO CONSULTING SERVICES AGREEMENT FOR TENANT IMPROVEMENT LOS MEDANOS HEALTH CENTER 2311 LOVERIDGE ROAD,PITTSBURG FOR HEALTH SERVICES DEPARTMENT. (WH604B) I. Effective ate ant} arf#es: Effective March 21,2000,RGM&Associates(herein called"Consultant"),a corporation, and the County of Contra Costa(herein called"County"),a political subdivision of the State of California,mutually agree as follows: 2. kur :On December 1, 1998,the parties entered into a contract entitled"Consulting Services Agreement,"referred to as the"Agreement,"which covers project management,and technical support services for design and construction of building renovations at Los Medanos Health Center,2311 Loveridge Road,Pittsburg for Health Services Department. The Agreement has previously been amended as follows: First Amendment dated July 20,1999. The parties desire to further amend the Agreement to expand the scope of service and to increase the payment limit accordingly. 3. Am n 1i1ents to Ag m n : A. In the Agreement Section I (e),change the Payment Limit from$412,432.12 to$578,877.99,an increase of$166,454.87.This change shall apply to charges from and after October 15,1999. B. In accordance with Section 14 of the Agreement,provide the following extra services: I. Coordination of architectural design,contractor negotiations and construction administration services for Second Floor Dental Suite. 2. Construction administration services required to coordinate with Health Services, Architect and Engineers to evaluate structural and electrical requirements that will accommodate new radiological equipment. 3. Construction administration services required to change mechanical system from the existing "Constant Volume System" to a new "Variable Air Volume System." 4. Design, proposal evaluation and construction administration services for Central Plant Improvements as a Change Order to original Construction Contract and as a separate bid package. Separate bid package includes document review, site visits, preparation of bid package,addendum,bid evaluation,contract award and construction management services. 5. Provide coordination efforts with equipment and furniture planning and inventory services consultant. 6. Prepare separate bid packages and addenda, assist with bid evaluations and contract award, and provide additional construction administration services,as required by the increase in scope from that anticipated under the First Amendment for the cast iron soil pipe replacement work. 4. ;FJIW: Subject to the revisions made by this and any prior amendments,the Agreement shall remain in full force and effect. 5. ?igIatu : These signatures attest the parties'agreement hereto: Pi LI".AGENCV CQNNSI T_LTANT By: Date: Type of business: Barton J.Gilbert (Designate type—corporation,sole proprietorship,partnership, Director of General Services/Purchasing Agent partnership,government agency,limited liability company,etc.) If corporation,state of incorporation: By: Title: (Designate official capacity in the business) By: Title: (Designate official capacity in the business) Note to Consultant: For corporations,the contract must be signed by two officers. The first signature must be that of the chairman of the board,president or vice-president;the second signature must be that of the secretary, assistant secretary, chief financial officer or assistant treasurer. (Civ. Code, Sec. 1190 and Corps.Code,Sec.313.) The acknowledgment below must be signed by a Notary Public. .................................................................................................................................................................................................. CERTIFICATE OF ACKNOWLEDGMENT State of California ) ss County of On the date written below,before me,the undersigned Notary Public,personally appeared the person(s)signing above for Consultant,personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies),and that by his/her/their signature(s)on the instrument the person(s),or the entity upon behalf of which the person(s)acted,executed the instrument. WITNESS my hand and official seal. Dated: Notary Public [Notary's Seal] RECOMMENDED FOR APPROVAL: By: APPROVED AS TO FORM: Director,Capital Facilities&Debt Management VICTOR J.WESTMAN County Counsel By: LS:ih Deputy H:\199813459802\8LOO2276a.doe Page 1 of I