Loading...
HomeMy WebLinkAboutMINUTES - 06221999 - C11-C14 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on June 22, 1999,by the following vote: AYES: SLIPERVISORS GIOIA, UILKEMA, GERBER, DESATJLNIER, AND CANCIMILLA NOES: NON17 ABSENT: IN-ONE ABSTAIN: NONE SUBJECT: Ratify previous pernission by Public Works Director to completely Close a portion of Columbus Avenue and Virginia Street,for the Purpose of Sof:borings for Carquinez Bridge Project, in the Crockett area. (RC 99-7) The Public Works Director having reported that prior approval has been granted to The State of California Department of Transportation (CALTRANS) to completely closeColurnbus Avenge from Monday, June 14, 1.999 to Wednesday, June 16, 1999, and Virginia Streets from Thursday, June 10, 4999 to Friday, June 11, 1999,except for emergency traffic, for the period of 7:OOAM through 5:OOPM, subject to the following conditions: 1. Traffic will be detoured via neighboring streets. 1 All signing to be in accordance with the State of California Manual of Traffic Controls. 1 The State of California Department of Transportation (CALTRANS) shall comply with the requirements of the Ordinance Code of Contra Costa County. 4. Provide the County with a Certificate of Insurance in the amount of $1,000,000.00 for Comprehensive General Public Liability which names the Coil-t-y as an additional insured prior to neurit issuance. 5. Obtain approval for the closure from.the Sheriff s Department, the California Highway Patrol and the Fire District, IT IS BY THE BOARD ORDERED that the action taken by the Public Works Director is approved. I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of G:\G:pData\Engsvc\B0\1999\B0 5-22-99.doe Supervisors on the date shown. origir_ator: Public Works{APC) Contact: 3onn Capozzo(545-1507) cc: CHP ATTESTED: ,JUNE 22. 1999 s�enff-Patrol Div.Comrnander PML BATCHELOR, Clerk of the Board.of Supervisors and County Administrator By , Deputy TO: BOARD OF SUPERVISORS � 120e FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: June 22, 1999 SUBJECT: Approve Cummings Skyway Truck Climbing Lane, Crockett area. Project No. 0662-684197 CDD-CP # 99-33 SpecificRequest(s) €ir ecom el actors) &Backgrouna & justirication I, RECOMMENDED ACTION: APPROVE the Project, and DETERMINE that the project is a California Environmental Quality Act (CEQA) Class Io Categorical Exemption, and DIRECT the Public Works Director/Chief Engineer to prepare contract plans and specifications for construction. DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk. Y Continued on Attachment. X SIGNATURE, RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE —APPROVE —OTHER SIGNATURE(S): ACTION of BOARD ON jUNIE 22, 1999 APPROVED AS RECOMMENDED �OTHER VOTE OF SUPERVISORS I hereby certify that this is a true and correct copy of X UNANIMOUS (ABSENT ) an action taken and entered on the minutes of the � AYES: NOES: Board of Supervisors on the date shown. i €.C:kw ABSENT: ABSTAIN: � ',\PWSI\SHARDATA\Grp-DatalSpDistkBoardOrdersi1999\06June\ ATTESTED: Tt11�3E r.? �3g 0 rig.Di : PHIL BATCHELOR Clerk'of the Board of Supervisors ®rig. ty: Public Works(Engineering Services Division) 0 3 Contact: J. Pakpour, Maintenance and County Administrator ; cc: County Administrator Attn: E. Kuevor Auditor-Controller By Community Development—D. Foley Deputy PW Accounting Construction L. Chavez, Eng, Services SUBJECT: Approve Cummings Skyway Truck Climbing Leve Project, Crockett Area. Project No. 0662®6P4197 CDD-CP #99-33 DATE. June 22, 1999 PAGE: 2 AUTHORIZE the Public Works Director to arrange for payment of a 25 tee to Community Development for processing, and a $25 fee to the County Clerk for filing the Notice of Exemption. Ila FINANCIAL IMPACT: The estimated cost for Phase I of the project is $745,000, fended by 100% Measure C Return to Source. ending for the remainder of the project will be determined at a future date. III, REASONS FOR RECOMMENDATIONf13ACl(GROUND: The project includes the construction of a tack climbing lane immediately adjacent to the existing roadway between 1-60 and the summit east of Crockett Boulevard. It is needed in order to reduce delays to vehicles due to slow-moving trucks that already utilize Cummings Skyway. The project has been determined to be in compliance with the General Plan and is exempt from CEQA because it consists of the miner alteration of an existing facility involving negligible expansion beyond that previously existing.. IV, CONSEQUENCES OF NEGATIVE ACTION: Delay in approving the project will result in a delay of design and construction and may jeopardize funding. CONTRA PUBLIC WORKS DEPARTMENT COSTA INITIAL STUDY COUNTY OF ENVIRONMENTAL SIGNIFICANCE PROJECT#0662-6P4197 CP#99-:3 21 PROJECT NAME:Cummings Skyway Trick Climbing Lane PREPARED BY": Leigh Chave � DATE. 5/18199 APPROVED BAY k �° � DATE: RECOMMENDATIONS: (X) Categorical Exemption (Class 1c) { Negative Declaration () Environmental Impact Report Required () Conditional Negative Declaration The project will not have a significant effect on the environment. The recommendation Is Lased on the following: The project consists of the minor alteration of an existing facility involving negligible expansion beyond that previously existing. The purpose of the project is to reduce delays to vehicles due to slow-moving trucks that already utilize Cummings Skyway. What changes to the project would mitigate the Identified Impacts NIA RSCS Quad Sheet Benicia Ease Map Sheet# 018, D9, E9 Marcel#NA G5NERAL CONSIDERATIONS: 1. Location: The project is located along the existing Cummings Skyway roadway between Interstate 80(1-80) and the summit of Cummings Skyway, east of Crockett Boulevard(Figures 1 and 2). 2. Project Description, Work associated with the Cummings Skyway Truck Climbing Large project will consist of constructing approximately 3.3 km(2.1 miles)of truck climbing lane immediately adjacent to the existing roadway between 1-80 and the summit east of Crockett Boulevard. The project will include widening of the existing pavement to provide for a 3.6 rooter(12 foot)wide truck climbing lane and a 1.2 meter(4 foot)shoulder. The project will be constructed in two phases. Phase I will be completed during the 1999 construction season and Phase 11 will be completed at an undetermined future date. Phase I will consist of constructing a 1.6 km(1 mile)section from 1-80 to below(west o€)Crockett Boulevard. Phase 11 will consist of extending the truck climbing lane an additional 1.7 km(^:..1 miles)to the summit east of Crockett Boulevard. Phase I of the project will require minor grading and no tree removal, Phase 11 will require approximately 600 cubic meters(785 cubic yards)of cut on the slopes adjacent to the shoulder where Crockett Boulevard joins Cummings Skyway. As a result of the cut in Phase 11, one elderberry tree(approximately 3"dbh),two coast live oaks(approximately 3"dbh)and five coast live oaks that are less thea 3" dbh will require removal. The trees that will be Impacted by the project are spaced sporadically along the shoulder of the existing roadway and do not constitute a stand of trees. In addition,the adjacent slopes that will not be Impacted by the out contain multiple coast live oaks trees. A small amount of roadside vegetation consisting of non-native grasses,coyote brush and poison oak, will require removal. All areas disturbed by construction will be hydroseeded with a seed mix Including native seeds. Minor utility relocation will be necessary. All construction activity will occur within the County's right-of-way, 3. Does It appear that any feature of the project will generate significant public concern? [j yes N no [j maybe (Mature sof concern): 4. Will the project require approval or permits by other than a County agency"?[]yes Pq no Agency Mame(s) 5. Is the project within the Sphere of Influence of any city?No C3:�99�o ects\CEQA 3n#y\Ca,ex\Cumming$Ciimbing CALIFORNIA ENVIRONMENTAL QUALITY ACT "111111odlee of ion Contra Costa County Community Development Department 651 Pine Street; 4th Floor-North filing, McBrien.Administration wilding Martinez, CA 94553-0495 Telephone: (510) 313-2296 Contact Person Cece Sellgren - Public Works DeDt Project Description,Common Name(if any)and Location: Cummings Skyway Trick Climbing lane,County File#CP 99-13Project Description:Work associated with the Cummings Skyway Truck Climbing Lane project will consist of constructing approximately 3.3 kin (2.1 dies) of truck climbing lane immediately adjacent to the existing roadway between 1-80 and the summit east of Crockett Boulevard. The project will include widening of the existing pavement to provide for a 3.6 meter(12 foot)wide truck climbing lane and a 1.2 meter(4 foot)shoulder. The protect will be constructed in two phases. Phase i will be completed during the 1999 construction season and Phase it will be completed at an undetermined future date. Phase i will consist of constructing a 1.6 km(1 mile)section from 1-80 to below(west of)Crockett Boulevard. phase It will consist of extending the truck climbing lane an additional 1.7 km (1.1 Miles)to the summit east of Crockett Boulevard. Phase l of the project will require minor grading and no tree removal. Phase it will require approximately 600 cubic meters(765 cubic yards)of cut on the slopes adjacent to the shoulder where Crockett Boulevard joins Cummings Skyway.As a result of the cut in Phase ll,one elderberry tree(approximately 3"dbh),two coast live oaks(approximately 3"dbh)and five coast live oaks that are less than 3"dbh will require removal. The trees that will be impacted by the project are spaced sporadically along the shoulder of the existing roadway and do not constitute a stand of trees. In addition,the adjacent slopes that wili not be Impacted by the cut contain multiple coast live oaks trees. A small amount of roadside vegetation consisting of non-native grasses,coyote brush and poison oak,will require removal. All areas disturbed by construction will be hydroseeded with a seed mix Including native seeds. Minor utility relocation will be necessary. All construction activity will occur within the County's right-of-way. Project location: The project is located along the existing Cummings Skyway roadway between Interstate 80(1-80)and the summit of Cummings Skyway,east of Crockett Boulevard. This project is exempt from CEtA as a: ,,,,_ Ministerial Project(Sec. 15268) _,,,., tither Statutory Exemption, Section — Declared Emergency(Sec. 15269(x)) — General Mule of Applicability(Section 15061(b)(3) _ Emergency Project(Sec. 15269(b)or(c)) Categorical Exemption, Cl ss 1 c for the following reason(s):The project consists of the minor alteration of an existing facility involving negligible expansion of use beyond that previously existing. The purpose of the project is to reduce delays to vehicles due to slow-moving trucks that already utilize Cummings Skyway. Date: By: CommunL Development lie artment Representative AFFIDAVIT OF FILING AND POSTING I declare that on I received and posted this notice as�requlred by California Public Resources Code Section 21152(c). Said notice will remain posted for 30 days from the filing date. - Signature Title Applicant: County Public Works Department 255 Glacier Drive Martinez, CA 94553 a4tt�i• i Igh Chavez County Clerk Fee$50 Due G* Projects\CEt Cnly\NL7MCuir mingsClimbing CALIFORNIA ENVIRONMENTAL QUALITY ACT Notice of Exet n Contra Costa County Community Development Department 651 Fine Street,4th Floor m North Wing,McBrien Administration Building Martinez, CA,94553-0095 Telephone: (51 Q) 313-2296 Contact Person:Cece Sell ren - Public Work CJ+egt. Project Description,Common Marne(if any)and Location:Cummings Skyway Track Climbing Larne,County Fife#CP 99-NiProject Description:Work associated with the Cummings Skyway Truck Climbing Lane project will consist of constructing approximately 3.3 km (2.1 unites) of truck climbinrg lane immediately adjacent to the existing roadway between 1.84 and the summit east of Crockett Boulevard. The project will Include widening of the existing pavement to provide for a 3.6 meter(12 foot)wide truck climbing lame and a 1.2 meter(4 foot)shoulder. The project will be constructed In two phases. phase I will be completed during the 1999 construction season and Phase It will be completed at an undetermined future date. phase I will consist of constructing a 1.6 krn(1 mile)section from t-80 to below(west of)Crockett Boulevard. Phase 11 will consist of extending the truck climbing lane an additional 1.7 km(1.1 miles)to the summit east of Crockett Boulevard, Phase I of the project will require minor grading and no tree removal. phase It wil require approximately 600 cubic meters(766 cubic yards)of cut on the slopes adjacent to the shoulder where Crockett Boulevard jolm Cummings Skyway.As a result of the cut in Phase 11, one elderberry tree(approximately 3"dbh),two coast live oaks(approximately 3"dbh)and five coast live oaks that are less than 3"dbh will require removal. The trees that will be impacted by the project are spark sporadically along the shoulder of the existing roadway and do not constitute a stand of trees. In addition,the adjacent slopes that wif not be Impacted by the cut contain multiple coast live oaks trees. A small amount of roadside vegetation consisting of non-native grasses,coyote brush and poison oak,will require removal. All areas disturbed by construction will be hydroseeded with a seed t`t b Including native seeds. Minor utility relocation will be necessary. All construction activity will occur within the County's right-of-way Project location:The project is located along the existing Cummings Skyway roadway between Interstate 89 (1-80)and the summa; of Cummings Skyway,east of Crockett Boulevard. This project Is exempt from CBGA as a: Ministerial Project(Sec. 15268) — Other Statutory Exemption, Section— Declared Emergency(Sec. 15269(x)) — General Rule of Applicability (Section 15061(b)(3) _ Emergency project(Sec. 15269(b)or(c)) _ Categorical Exemption* Class 1c for the following reason(s):The project consists of the minor alteration of an existing facility involving negligible expansion of us( beyond that previously existing. The purpose of the project Is to reduce delays to vehicles dote to slow-moving trucks that already utillzf Cummings Skyway. Date: By: Community Development Department Representative AF'FIDAV'IT OF FILING AND POSTING I declare that on t received and posted this notice a§.-required by California Public resources Code Section 21152(c). Said notice will remain posted for 30 clays from the fling date. Signature Title Applicant: County Public Works Department 256 Glacier Drive Martinez,CA 94553 A Leigh Qhg= County Clerk Fee $50 Due G:t99ProjectstCEQAOnlyV-40E\CummingsClimbing CIS ?:: t E to C) < Of 0 ui Q � -j z c > Q ILA z d oo� Uj z Z CL m LdCy- n wo C) C +� Z _ < Mo o" 0 �^a � <a tS .g Y+ � r a"+ 0 vs A .$ »A UP 96 ` t e u fl_3 UR W C TO: BOARD OF SUPERVISORS " FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: June 22, 1999 SUBJECT: Approve Christie Road Shoulder Repair, Hercules Area. Project No. 0672-686371-98 CDD-CP # 99-25 Specific Request(s) or Recommendation(s) & ackground & Justification L RECOMMENDED ACTION: APPROVE the Project, and DETERMINE that the project is s California Environmental Quality Act (CE€2A) Class 1c Categorical Exemption, and DIRECT the Public Works Director/Chief Engineer to prepare contract plans and specifications for construction. DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk. a, d , Continued on Attachment: X SIGNATURE, RECOMMENDATION of COUNTY ADMINISTRATOR i RECOMMENDATION OF BOARD COMMITTEE —APPROVE �OTHER SIGNATURE(S): ACTION OF BOARD ON Jure 22, 1999 X APPROVED AS RECOMMENDED�OTHER VOTE OF SUPERVISORS I hereby certify that this is a true and correct UNANIMOUS(ABSENT } copy of an action taken and entered on the AYES: NOES: minutes of the Board of Supervisors on the Lc:kw ABSENT: ABSTAIN: date shown. G:\GrpData\EngSvc\ENVIROkg9projects\CEQAonly\BoardOrders\ BOWatsonCanyon.doc Orig.Div: Public Works(Engineering Services Division) ATTESTED:Contact: Fahy, Maintenance :Tule 22, 1999 cc: county Administrator Attn: E. Kuevor PHIL BATCHELOR, Clerk of the Board of Auditor-Controller Community Development--D. Foley Supervisors and CountyAdministrator PW Accounting Construction L. Chavez, Erg.Services By Deputy � SUBJECT. Approve Christie Road Shoulder Repair Project, Hercules Area. Project No. 0672®6R6371m93 CDU-CP ##99-25 DATES June 22, 1999 PAGE. 4 AUTHORIZE the Public Works Director to arrange for payment of a $25 fee to Community Development for processing, and a $25 fee to the County Clerk for ding the Notice of Exemption. II, FINANCIAL IMPACT. The estimated project cost is $5,000, funded by 75% FEMA, 18% Mate, 7% kcal. Ill. REASONS FOR RECOMMENDATIONIBACKGROUND: The project includes the repair of the rock cover for an existing culvert crossing along Christie Road with earthen fill and rock slope protection. It is needed in order to stabilize the road embankment. The project has been determined to be in compliance with the General Plan and is exempt from CEQA because it consists of the repair of an existing public facility involving no expansion of use beyond that previously existing. Ill, CONSEQUENCES OF NEGATIVE ACTION: Delay in approving the project will result in a delay of design and construction and may jeopardize funding. CONTRA PUBLIC WORKS DEPARTMENT COSTAE INITIAL STUDY COUNTY OF ENVIRONMENTA►L. SIGNIFICANCE PROJECT #0672-6R6371-98 Cly# 99- PROJECT NAME: Christie Road Shoulder Repair PREPARED BY: Leigh Chavez � DATE: 4`1�gg f APPROVED BY: � 7 � DATE: RECOMMENDATIONS: (X) Categorical Exemption (Class 1c) ( ) Negative Declaration ( ) Environmental impact Deport Required ( ) Conditional Negative Declaration The project will not have a significant effect on the environment. The recommendation is based on the following: The project consists of the repair of an existing public facility involving no expansion of use beyond that previously existing. The project has received a not likely to result in take determination from USFWS for California red-legged frog. What changes to the project would mitigate the identified impacts N/A USGS Quad Sheet Benicia Base Map Sheet# F9 parcel # NIA GENERAL CONSIDERATIONS: 1. Location: The project is located on Christie Road approximately 0.2 mile south of Highway 4 in the vest county area near the City of Hercules (Figures 1 and 2). 1 Project Description. The project consists of the repair of the rock cover for an existing culvert crossing along Christie Road through the installation of approximately 150 cubic yards of earthen fill and 15 cubic yards of rock slope protection. The existing culvert was not damaged. 3. Does it appear that any feature of the project will generate significant public concern? yes [X] no maybe (Nature of concern): r 4� Will the project require approval or permits by other than a County agency's [X] yes a no Agency Name(s) CDFG , RWQCB, USACCE 5. is the project within the Sphere of influence of any city's No C,,\enviro\99projectstoetexChristieRd houlder e- 14 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on Jane 22, 1999,by the following vote: AYES: SUPERVISORS GIOIA, UIUK A, GERBER, UESAUL'IIER, AN'D OA.NGIAMILLA NOES: BONE ABSENT: NONE ABSTAIN: NTONE SUBJECT: ratify previous permission by Public Works Director to completely Close a portion of Marys Avenue, for the Purpose of Block Party, in the Bay Point area. The Public Works Director having reported that prior approval has been granted to Ranel K. Ferguson to completely close Marys Avenue, except for emergency traffic, on Saturday, June 12, 1999, for the period of 11:00AM through 6:OOPM, subject to the following conditions: 1. Traffic will be detoured via neighboring streets. 2. All signing to be in accordance with the State of California Manual of Traffic Controls. 3. Itanel K. Ferguson shall comply with the requirements of the Ordinance Code of Contra Costa County. 4. Provide the County with a Certificate of Insurance in the a*noznt of $1,000,000.00 for Comprehensive General Public Liability which names the County as an additional insured prior to permit issuance. 5. Obtain approval for the closure from the Sheriff s Department, the California Highway Patrol and the Fire District. IT IS BY THE BOARD ORDERED that the action taken by the Public Works Director is approved. I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. G:\C--.CDa.a\SrgSvc\BO\1999\BO 6-22-99.doc originator: ?ubhc Works(APP ATTESTED: JUNE 22 1999 canEaet: John Carozza(646-1607) -- .L PHIL BATCHELOR, Clerk of the Board of Supervisors S1;e e`` CH?riff-Patrol div.Commander and County ty Administrator e By , Deputy