HomeMy WebLinkAboutMINUTES - 06221999 - C1-C5 1
Recording Requested By:
Contra Costa County Public Works Dept.
Construction Division
255 Glacier Drive
Martinez, CA 94553
Return to:
WHEN RECORDED, RETURN To CLERK
BOARD OF SUPERVISORS
BOARD OF SUPERVISORS, CONTRA COSTA COUNT`, CALIFORNIA
In the Matter of Accepting and Giving RESOLUTION OF ACCEPTANCE
Notice of Completion of Contract for ) and NOTICE OF COMPLETION
Hilltop Drive Pedestrian Path- Phase II ) (C.C. § 3036, 3093)
Project No.066 -6U4266) RESOLUTION NO. 99
The Board of supervisors of Contra Costa County RESOLVES that:
The County of Contra Costa on Jelly 29, 9996 contracted with Bauman Landscape, Inc., for the
construction of a 6'wide A.C. path, A.C. dike and drainage along a portion of Hilltop Drive, with Safeco
Insurance Company as surety, for work to be performed on the grounds of the County; and
The PublicWorks Director reports that said work has been inspected and complies with the approved
plans, special provisions and standard specifications and recommends its acceptance as complete as
of April 13, 1999,
Therefore, said work is ACCEPTED as completed on said date, and the Clerk shall file with the County
Recorder a copy of this Resolution and Notice as a Notice of Completion for said contract.
PASSED BY THE BOARD on June 22, 9999 by the following mote:
AYES. SUPERVISORS GIOIA, tUIIa€MMI A, GERBER, DESAU,I•VIER, kN1DCA?'jCL4,MILLA
NOES: NOINE
ASSENT: NOIR
CERTIFICATION AND VERIFICATION
I hereby certify that this is a true and correct copy of an
Contact: Mike Carlson (925)313-2321 action: taken and entered on the minutes of the Board of
Orig. Cept.:Public works(Const.) Supervisors on the date shown.
cc: Record and Return
Auditor
Pub€icworks- Accounting ATTESTED: JUNE 22,_,.199.9
- Construction,R. Bruno PHIL BATCl-TELOR, Clerk of the Board of supervisors and
Env.,C.sellgren County Administrator
Contractor
Traffic,S. Kersevan �
yg ¢�
RB/k, 5 D
G:\GrpDatatC o,nst\soli,3999\06-june\�. DPP-22.doc Deputy
RESOLUTION NO. 99!322
Recdrding Requested By: III RE 11111111111111111111111111111111111111111111 0
Contra Costs County Public works dept. CONTRA COSTA Co Recorder Office
Construction Division STERNEN L, WEIR Clerk-Recorder
255 Glacier Drive
Martinez, CA 94553 DOC— 199b-0257779-00
T, SEP 28, 199 88:59:22
Return to. FRI $0.00
Ttl Pd $0.00 Nbr-0000683891
WHEN RECORDED, RETURN To CLERK irc/R9/1®1
BOARD OF SUPERVISORS
BOARD OF SUPERVISORS, CONTRA COSTA COUNTY, CALIFORNIA
In the latter of Accepting and Giving RESOLUTION OF ACCEPTANCE
Notice of Completion of Contract for } and NOTICE OF COMPLETION
Hilltop Drive Pedestrian Path- Phase 11 ) (C.C. § 3066, 3093)
Proiect No.0662-6U4225) RESOLUTION NO._22
The Board of Supervisors of Contra Costa County RESOLVES that:
The County of Contra Costa on July 29, 1996 contracted with Bauman Landscape, Inc., for the
construction of a 5' wide A.C. path, A.C. dike and drainage along a portion of Hilltop Drive, with Safeco
Insurance Company as surety, for work to be performed on the grounds of the County; and
The Public Works Director reports that said work has been inspected and complies with the approved
.plans, special provisions and standard specifications and recommends its acceptance as complete as
of April 13, '1999.
Therefore, said work is ACCEPTED as completed on said date, and the Clerk shall file with the County
Recorder a copy of this Resolution and Notice as a Notice of Completion for said contract.
PASSED BY THE BOARD on June 22, 1999 by the following vote:
A"YE& SLTERVISORS GICIA, UILKEMA, GERBER, DESAULNIER, Am CANCLLLA
NOES: i "E
ABSENT: NONE
CERTIFICATION AND VERIFICATION
I hereby certify that this is a true and correct copy of an
Contact: Mike Carlson (925)313-2321 action taken and entered on the minutes of the Board of
Orig. Dept.:Public works(Const.) Supervisors on the date shown.
cc: Record and Return
Auditor
Public works- Accountings ATTESTED: JUNE 22, 1999
Env.,Construction,R.I3nrno PHIL BATCHELOR Clerk of the Shard of Supervisors and
m Env.,C.�tlgr€�rr
Traffic,S. Kersevan County Administrator
Contractor
R3 / � ` t deputy
:iGrPCaa#a1Consfa03 IO 9106-JuneHD
s P'P-22.d c
G
r
RESOLUTION No. 9 322
rt
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: June 22, 1999
SUBJECT: Approval of Contract Contingency Fuad Increase and Contract Change Order
No. 4 for the Hilltop Drive Pedestrian Path m Phase 11 Project,
Project No.: 0662-6U4285
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
lv Recommended Action:
APPROVE project contingency fund increase of$35,000.00 and Contract Change
Order leo. 4 in the approximate amount of$52,000.00 and AUTHORIZE the Public
Works Director to execute it in order to compensate the contractor, Bauman
Landscaping, Inc. for unforeseen extra work.
ll, Financial Impact:
The project contingency funds are currently insufficient to cover the cost of extra
work. The increase in contingency funds will be funded by Road 'Funds (100%).
Continued on Attachment: XS#G#VATlJRE:
®RECOMMENDATION of COMY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
—APPROVE �OTHER
SIGNATURE( }:
ACTION OF BOAR®ON .rune 22� 1999 APPROVED AS RECOMMENDED X OTHER
E i hereby certify that this is a true and correct copy of an
action taken and entered on the minutes of the Board
of Supervisors on the date shown.
VOTE OF SUPERVISORS
UNANIMOUS (ASSENT }
AYES- NOES. ATTESTED: JUNE 21____1999
ABSENT:_ ABSTAIN: PHIL BATCHELOR, Clerk of the Board of Supervisors
Con:acf:vtikeCarisan,(92b)313-2�2". land County Administrator
Orig.Div.: PW(Constr) i
ec: County Administrator
Auditor-Controller
Public Works
- Accounting,R.Gilchrist
Construction,R.Bruno
Design By Deputy
Contractor
RB:kj �
C:\GRPDATAICONST\BO\1999\06- UNE\HDPP-CCF-22.00C
SUBJECT: APPROVAL of Contact Contingency Fund Increase and Contact Change Order leo. 4 for
the Hilltop give Pedestrian Path—Phase Ii Project
DATE: June 22, 1999
PAGE 2
Ill. Reasons for Recommendations and 3a round;
The scope of work was increased to adjust culls, construct concrete steps and
handrails, adjust drainage inlets and reconstruct driveways. Charges made exceed
the limits specified in Public Contract Code Section 20395 and exceeded the project
contingency fund, APPROVAL of the change order and projectcontingency fund
increase is REQUIRED.
IV. Consequences of Negative Action:
The lack of APPROVAL would prevent successful completion of this contract and
preclude payment to the contractor for required work.
e. 3
To— BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: June 22, 1999
SUBJECT: Contract award Recommendation: North Broadway Area Infrastructure Program Phase 1 B
(1999) Project,
Project No. 0662-6R4136, Bay Paint area.
SPECIFIC REQUESTS)CR RECOMNDATION(S)&BACKGROUND AND JUSTIFICATION
t. RECOMMENDED ACTION:
AWARD the contract for furnishing labor and materials for the subject project to Bay Cities Paving
and Grading, Inc., the low bidder, in the amount of$649,096.35 and at the unit prices submitted;
and REQUIRE the contractor to present surety bonds for Payment and Faithful Performance in
the amounts of$649,096.35 and $649,096.35, respectively.
DIRECT the Public Works Director to prepare the contract for the project.
AUTHORIZE the Public Works Director to sign the contract on behalf of the Board subject to the
Director having reviewed and found sufficient all required documents, including the contract
signed by the contractor, the aforementioned surety bonds, and ceific e of insurance.
Continued on Attachment: X SIGNATURE:
RECOMMENDATION OF BOARD COMMITTEE
—APPROVE OTHER
SIGMA UREJS):
ACTION OF BOARD ON dune 22, 1999 APPROVED AS RECOMMENDED®OTHER
VO—
OF SUPERVISORS
UNANIMOUS (ABSENT )
AGES; NOES: I hereby certify that this is a true and correct
Ae�EI�T; AEST'All�l; y y copy
of an action takers and entered on the minutes of
R8:k1 the Board of Supervisors on the date shown.
G:\GRPDATA\CONST\BO\FORMS-M=RGE\AWARD.DOC
Orig.Div.: PW(Constr)
Contact: Mike Carlson(925)313-2320 JUNE 22, 1999 ti
cc: County Administrator ATTESTED:
PuNicWorktraifer PHIL BATCHELOR, Clerk of the Board of
I�;;blic Works:
R. Bruno,Construction Supervisors and County Administrator
-R. Gilchrist,Accounting
-Design
-Transp. Engin.
03 Market St. I By , Deputy
San Francisco,CA 94103-1000
Contractor
(1 of 2)
SV JECT: Contract Award Recommendation:
North Broadway Area Infrastructure Program Phase 1.d3 (1999) Project,
Project No. 0662-684136, Bay Point area.
BOARD DATE: June 22, 1999
I. RECOMMENDED ACTION: (continued)
DIRECT that, in accordance with the project specifications and/or upon the execution of the
contract by the Public Works Director, any bid bonds pasted by the bidders be exonerated and
any checks or cash submitted for bid security be returned.
Pursuant to Public Contract Code Section 4114, the Board DELEGATES its functions under
Public Contract Code Sections 4107 and 4110 to the Public Works Director or his designee.
Pursuant to Section 6705 of the Labor Code, the Board also DELEGATES to the Public Works
Director or to any registered civil or structural engineer designated by him the authority to accept
detailed plans showing the design of shoring, bracing, sloping or other provisions to be made for
worker protection during trench excavating covered by that section.
DECLARE that, should the award of the contract to Bay Cities Paving and grading, Inc. be
invalidated for any reason, the Board would not in any event have awarded the contract to the
second listed bidder or any Cather bidder, but instead would have exercised its discretion to reject
all of the bids received. Nothing herein shall prevent the Board from re warding the contract to
another bidder in cases where the successful bidder establishes a mistake, refuses to sign the
contract or fails to furnish required bonds or insurance (see Public Contract Code Sections 5100-
5107).
II. FINANCIAL I LPACT:
The project, including engineering and appropriate overhead charges, is funded by
Redevelopment Agency (100°/x).
III, REASONS FOR RECOMMENDATIONS AND BACKGROUND:
The pians and specifications were approved and the project advertisedfor bids by the Board of
Supervisors on April 20, 1999. The bids were received and opened at 255 glacier Drive,
Martinez, California, on Tuesday May 25, 1999. The construction bids received were as follows:
1. Bay Cities Paving and grading, Inc........................................................$649,096.35
2. Vanguard Construction .........................................................................$868,617.04
The Engineer's estimated construction cost was $587,875.00.
(2 of 2)
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on. mune 22, 1999, by the following vote :
AYES : St W_RVTSORS GTOIA, €3ILKEMA, GERBER, DESACILKER A�74D CA�'�CIAMIL A
NOES: N,01iE
ABSENT: VGNE
ABSTAIN: G
SUBJECT: Award of Contract for Appian Way
at Allview Avenue Traffic Signal
Project, El Sobrante area
Project No. 0662-6U4129-99
Bidder Total Amount. Bond Amounts
Continental Electric $123, 352 . 00 Payment :
23209 Doidge Ave. $123 , 352 . 00
Pinole, CA 94564 Performance :
$123 , 352 . 00
Ray' s Electric
Oakland, CA
?dike Brown Electric Co.
Cotati, CA
Steiny and Company, Inc.
Vallejo, CA.
Columbia Electric, Inc.
San Leandro, CA
Ci.rimele Electric Works, Inc.
Richmond, CA
The above-captioned project and the plans and specifications
therefor having been previously approved, and bids having been duly
invited and received by the Director of Public Works on June 8, 1999;
and
The lowest monetary bidder, Hertz Electric Contractors ("11-1ertz") ,
having submitted a bid with the following deficiencies : bid is unsigned
and undated; noncollusion affidavit is not notarized bid .bond is not
fully notarized, and bid does not include certain business and license
information; and
The Director of Public storks having determined that the bid
submitted by Hertz doses not comply with the requirements of the project
specifications and the instructions to bidders, and the Director of
Public Works recommending rejection of said bid; and
Hertz having been notified in writing of the above deficiencies
and having been afforded an opportunity to present any information
supporting its position; and
AWARD CP CONTRACT FOR A.PPIAsN WAY June 22 , 1999
AT ALLVIEW AVENUE TRAFFIC SIGNAL
PROJECT, RL SGBRANTE AREA
The bidder listed first above, Continental electric
("Continental" ) , having submitted the lowest responsive and responsible
bid, which is $6, 048 . 00 less than the next lowest paid; and
The Director of Public works recommending that the bid submitted
by Continental is the lowest responsive and responsible bid, and this
Board concurring and so finding;
NOW, THEREFORE, the Board finds, determines and orders as follows
The Board DETERMINES that the bid submitted by the lowest monetary
bidder, Hertz, has the deficiences listed above and is non--responsive,
and the Board REJECTS said bid on that basis; and
The Board ORDERS that the contract for the furnishing of labor and
materials for said work is awarded to Continental at the listed amoun+t
and at the unit prices submitted in said bid and that said contractor
shall present two good and sufficient surety bands as indicated above,
and that the Director of Public Forks shall prepare the contract
therefor; and
The Board FURTHER ORDERS that after the contractor has signed the
contract and returned it, together with the bonds as noted above and
any required certificates of insurance or other require: documents, and
the Director of Public Forks has reviewed and found them to be
sufficient, the Director of Public Works is authorized to sign the
contract for this Board; and
The Board FURTHER ORDERS that, in accordance with the project
specifications and/or upon signature of the contract by the Director of
Public Works, any bid bonds posted by the bidders are to be exonerated
and any checks or cash submitted for security shall be returned; and
The Board FURTHER ORDERS that the Director of Public Works is
authorized to sign any escrow agreements prepared for this project to
permit the substitution of securities for moneys withheld by the County
to ensure performance under the contact, pursuant to Public Contract
Code .Section 22300, and
Pursuant to Public Contract Code Section 4114, the Board DELEGATES
its functions under Public Contract- Code Sections 4107 and 41.10 to :.he
Director of Public Works or his designee; and
Pursuant to Labor Code ,Section 6705, the Board FURTHER DELEGATES
to the Director of Public Works or to any registered civil or
structural engineer employed by the District the authority to accept
detailed plans showing the design of shoring, bracing, sloping or other
provisions to be made for worker protection during trench excavatio:
covered by that section; and
The Board DECLARES that, should the award of the contract to
Continental be invalidated for any reason, the .Board would not in any
evert have awarded the contract to any other bidder, but instead would
-2-
AWARD OF CONTRACT FOR APPIAIv WA's June 22, 1.9 9.9
AT ALI LVIE W AVENUE TRAFFIC SIG3NAL
PROJECT, E`., SOBRANTE AREA
have exercised its discretion to reject all of the bids received.
Nothing herein shall prevent the Beard from reawarding the contract to
another bidder in, cases where the successful bidder establishes a
mistake, refuses to sign the contract or fails to furnish required
brands or insurance (see Public Contract Code Sections 5100-5107) .
,Contact : Mike Carlson, (925) 313-2321.
Orig. Dept : PW-Const .
CC. County Administrator
County Counsel
Auditor-Controller
Public Works-Design
-Construction. (R.. Bruno)
-Accounting
Continental Electric (Via Const. Div. )
Hertz Electric (Via Const. Div. )
Surety (Via Const. . Div. )
I hereby Certify t�^at this is a true and correct
copy of ars action, taken and entered on the
minutes of the Board of Supervisolvis on the
date shown.
ATTESTED,
H11 CATCH C)R, Clerk of the Board
cfurvisors and County Administrator
By pe
Deputy
-3-
p 0
TO, BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA
COUNTY
FRONT. J. MICHAEL WALFOR®, PUBLIC WORKS DIRECTOR
DATE: June 22, 1999
SUBJECT: Approve plans and specifications and Advertise for bids Cummings Skyway Interim Truck
Climbing Lane Project in the Crockett area.
Project No.: 0662-684197, CDD-CP# 99-33
Specific Request(e) or Recommendation(s) & Background & Justification
Id RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Cummings Skyway Interim Truck Climbing Lane
Project and
ADVERTISE for bids to be received on Tuesday, July 27, 1999, at 2;00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
22037 of the Public Contract Code, and f
Continued on Attachment: X SIGNATURE: X31
RECOMMENDATION of COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON Jiune 22, 1999 APPROVED AS RECOMMENDED®OTHER
I hereby certify that this is a true and correct
copy of an action taken and entered on the
minutes of the Board of Supervisors on the
VOTE OF SUPERMSORS date shown.
AYES. NOES:
ABSENT: ABSTAIN: ATTESTED, JUNE 22 1999
:gpp PHIL BATCHELOR, Clerk of the Board of
G:KGrpData\Design\Board Orders\130 1999\ Supervisors and County Administrator
Cummings Skyway Interim`truck Climbing Lane 6-22.doc
Orig.C v: Public works(Design Divisions)
Contact: J.Pakpour(313-2299) s
cc: E. Kuevor,CAO By
Auditor-Controller
Community Development I��p
PW Accounting
Construction
SUBJECT: Approve Plans and Specifications and Advertise for bids for the'Cummings Skyway
Interim Truck Climbing Lane Project in the Crockett area.
Project No. 0662-6P4197-99, CDD-CP 99-33.
DATE; June 22, 1999
PAGE: 2
IL FINANCIAL IMPACT;
The estimated contract cost of the project is $261,500, funded by pleasure C (109%).
III> REASONS FOR RECOMMENDATION/BACKGROUND:
The project is needed to improve safety and reduce delays to vehicles trapped behind slow
moving trucks,
The Public Works Director has filed with the Board of Supervisors the Plans and Specifications
for the project.
The general prevailing rates of wages, which shall be the minimum rates paid on this project, have
been filed with the Clerk of the Board and copies will be made available to any interested party
upon request.
Ill, CONSEQUENCES OF NEGATIVE ACTION:
if the project is not approved for advertising, it will not be constructed.