HomeMy WebLinkAboutMINUTES - 05251999 - C8-C12 TO BOARD OF SUPERVISORS
FRO' J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: MAY 25, 1999
SUBJECT; APPROVE AMENDMENT NO. I TO GRANT AGREEMENT FOR PROJECT NO. 3-06-0008-06,
BETWEEN FEDERAL AVIATION ADMINISTRATION (FAA) AND CONTRA COSTA.
COUNTY FOR EAST CONTRA COUNTY COSTA COUNTY — BYR.ON AIRPORT
CONSTRUCTION
No.: 4875-4680 SAS-6X5343
SPECIFIC R QUF,ST(S)JR REC MNIEN*DATION(S)&BACKGROUND AND JUSTtMCAMN
I. Recommended Acticort.
APPROVE and AUTHORIZE the Chairman of the Beard of Supervisors to sign Amendment No. I of said
Grant Agreement on behalf of Contra Costa County, and
AUTHORIZE and DIRECT County Counsel to sign a Certificate of sponsor's Attorney which certifies
that the acceptance complies with.all applicable laws and constitutes a legal and binding obligation; and
AUTHORIZE and DIRECT the Clerk of the Board to attest the signature of the Chairman and to impress
the official seal of Contra Costa County on the aforesaid Amendment.
� a
Continued can Attachment: X SIGNATURE:
�Y RECOMMENDATION OF BOARD COMMITTEE
APPROVE O'T'HER
SIGNATURE(S):
ACTION OF BOARD ONMay 25, 1799 APPROVED AS RECOMMENDED x 7THER_
VOTE OF SUPERVISORS
_x UNANIMOUS(ABSENT 3 I hereby certify that this is a true and correct copy of ars
AYES: NOES: action taken and entered on the minutes of the Board
ABSENT: ABSTAIN: .. of Supervisors on the date shown.
Dvs:kd ATTESTED: My 25, 1.999
IS011BB025.`r5.doc
CT rig.Dly: Pudic work-Airpmu Division
Contact: David L.Mendez 646-5722 PHIL BATCHELOR, Clerk of the Board of Supervisors
ee: County Adtntn mrator
Public worksDiractor and County Administrator
Public Works Accounting
Auditor/Controller p c
Aviation Advisory Committee t i
Federal Aviation Administratvon f
By
[deputy
SUBJECT: APPROVE AMENDMENT NO. I TO GRANT AGREEMENT FOR PROJECT NO. 3-06-OM,8-06,
BETWEEN FEDERAL AVIATION, ADMINISTRATION (FAA) AND CONTRA COSTA
COUNITY FOR EAST CONTRA COSTA COUNTY—BYRON AIRPORT CONSTRUCTION
No.: 4875-4680 SAS-6X5343
DATE: MAY 25, 1999
PAGE 2
11. Financial Impac
This Amendment increases the Federal share of the project by $167,006.00 from $3,875,000.00 to
$4,042.006.00
111. Reasons for Recommendations and Background:
On September 22, 1992, the Board approved the Grant Agreement between County and the FAA. The
purpose of this amendment is to increase the Grant amount. Total cost of this project was $4,491,117.00.
The Federal share(90%)of the full amount of the project would be$4,042,006.00. This exceeds the Grant
amount by $167,006.00. This overage is approximately 3.7% of the total project amount. Most of this
overage was because of site work and excavation costs being higher than when the Application was made
as well as other unforeseeable site conditions costs. At the time the original Grant was acquired, the costs
were based on estimates not actual bids,
TV. Consequences of Negative Action:
The entire cost of the project overage will be paid out of the Airport Enterprise Fund instead of just the local
share of 10%.
UNITED STATES OF AMERICA
FEDERAL AVIATION ADMINISTRATION
Contract No. DTFA08-92-C-30580
Byron Airport
Byron, California
AMENDMENT NO. 1 TO GRANT AGREEMENT FOR PROJECT NO, 3-06-000 8-06
WHEREAS, the Federal Aviation Administration (hereinafter.referred to as the"FAA") has
determines' if to be it the interest of the United States that the Grant Agreement between the
FAA, acting for and on behalf of the United States, and the Contra Costa County, California,
(hereinafter referred to as the"Sponsor"), accepted by said Sponsor on the 22nd day of
September, 1992, to be amended as hereinafter provided.
NOW THEREFORE, WITNESSETH:
That in consideration of the benefits to accrue to the parties hereto, the FAA, acting for and on
behalf of the United States of America, on the one part, and the Sponsor, o;;; the other part, co
hereby mutually agree as follows:
That the maximum obligation of the United States as set forth in Paragraph 1 of the Terms
and Conditions, Standard Conditions, an page 2 of said Grant Agreement, is hereby
increased by$167,006.00 from $3,875,000.00 to$4,042,006.O0.
iN WITNESS WHEREOF, the parties hereto have caused this Amendment to said Grant
Agreement to be duly executed as of the _ 5th day of M- aY , 1999
UNITED STATES OF AMERICA
FEDERAL AVIATION ADMINISTRATION
WESTERN PACIFIC REGION
�nL' . Pfeifer '
Title: Manager, Air op its District Office
Page ?
Contra Costa County
( e . Sponsor}
By: MOW
Titlei Chair, Board of SuperviLsors
(SEAT_)
Attest:
Title: Deputy Clerk
CERTIFICATE OF SPONSOR'S ATTORNEY:
I, Sharon Anderson , acting as Attorney for Contra Costa County, (hereinafter
referred to as"Sponsor") do hereby certify:
That l have examined the foregoing Amendment to Grant Agreement and the proceedings
taken by said Sponsor relating thereto, and find that the execution thereof by said Sponsor has
been duly authorized and is in all respects due and proper and in accordance with the laws of
the State of California - and further that, in my opinion, said Amendment to Gram
Agreement constitutes a legal and binding obligation of the Sponsor in accordance with the
terms thereof.
Dated at ;�„ , C this 1 _day of vjn i9�.
" .� .._.
Title: Assistant Countv Counsel
a. The date -execution by the Sponsor
should be entered ou the first page
of
this amendment,
b. The date of"he Certificate of
Sponsor's Attorney MUST B.E the same or
late,than the date of execution.
c. The original SEAQ,_N112STLI31stamped on this
,page.
'age 2
TO: 30ARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: MAY 25, 1999
SUBJECT: APPROVE AT'V[ENDMENT NO. I TO GRANT AGREEMENT FOR PROJECT NO. 3-06-0008-07,
BETWEEN FEDERAL AVIATION ADMINISTRATION (FAA) AND CONTRA COSTA
COUNTY FOR EAST CON'T'RA COUNTY COSTA COUNTY — BYRON AIRPORT
CONSTRUCTION
No.: 4575-4677 SAS-6X5338
SPECIFIC REQUEST(S)OR RECOMMENDATIONS)Rc BACKGROUND ANIS jUSTMCATION
Ie Recommended Action:
APPROVE and AUTHORIZE the Chairman of the Board of Supervisors to sign Amendment No. I of said
Grant Agreement on behalf of Contra Costa County; and
AUTHORIZE and DIRECT County Counsel to sign a Certificate of Sponsor's Attorney which certifies
that the acceptance complies with all applicable laws and constitutes a legal and binding obligation; and
AUTHORIZE and DIRECT the Clerk of the Board to attest the signature of the Chairman and to impress
the official seal of Contra Costa County on the aforesaid Amendment.
y 1/5i
Continued on Attachment- X SIGNATURE:
RECOMMENDATION OF BOARD COMMITTEE
—APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON May 25, 1999 APPROVED AS RECOMMENDED x OTHER
VOTE OF SUPERVISORS I hereby certify that this is a true and correct copy of an
X UNANIMOUS(ABSENT )
AYES: NOES: action taken and entered on the minutes of the Board
ABSENT. ABSTAIN: of Supervisors on the date shown.
DM:kd ATTESTED:May 25, 1999
C:Bo\8025a.F5.doc
orig.Div: Public Work-AitportsDivision PHIL BATCHELOR, Clerk of the Board of Supervisors
Contact: David L.Mendez 646.5722
cc: County Administrator and County Administrator
Public works Director
Public works Accounting i
Auditor/Controller
Aviation Advisory C'ommiCee
S,ederal Aviation Administration By Deputy
B
'SE'JB.T1 CT: APPROVE AMENDMENT NO. I TO GRANT AGREEMENT FOR PROJECT NO. 3-06-0008-07,
BETWEEN FEDERAL AVIATION ADMINISTRATION (PAA) AND CONTRA COSTA
COUNTY FOR EAST CONTRA COSTA COUNTY—BYRON AIRPORT CONSTRUCT ION
No.. 4875-4677 SAS-6X5338
BATE; MAY 25, 1999
PAGE 2
II. FinancialImpact�
This Amendment increases the Federal share of the project by $35,008.00 from $3,000,000.00 to
53,035.008.00
III. Reasons for Recommendations and Background
On June 3, 1993, the Board approved the Grant Agreement between County and the FAA. The purpose of
this amendment is to increase the Grant amount. Total cost of this project was $3,372,231.00. The Federal
share (90%) of the full amount of the project would be$3,035,008.00. This exceeds the Grant amount by
$35,008,00. This overage is approximately 1% of the total project amount. Most of this overage was
because of site work and excavation costs being higher than when the Application was made as well as other
unforeseeable site conditions costs. At the time the original Grant was acquired, the costs were based on
estimates not actual bids.
IV. Consequences of Negative Action:
The entire cost of the project overage will be paid out of the Airport Enterprise Fund instead of just the local
share of t0%.
UNITED STATES OF AMERICA
FEDERAL AVIATION ADMINISTRATION
Contract No. DTFA08-93-C-30604
Byron Airport
Byron, California
AMENDMENT NO. 1 TO GRANT AGREEMENT FOR PROjECT NO, 3-06-0008-07
WHEREAS, the Federal: Aviation Administration (hereinafter referred to as the",FAA") has
determined :it to be in the interest of the United States that the Grant Agreement between the
FAA, acting for and on behalf of the United States, and Contra Costa County, California,
(hereinafter referred to as the"Sponsor"), accepted by said Sponsor on the 17th day of August,
1993, to be amended as hereinafter provided.
NOW THEREFORE, WITNESSETH:
That in consideration of the benefits to accrue to the parties hereto, the FAA, acting for and on
behalf of the United States of America, or, the one part, and the Sponsor, on the other part, do
hereby mutually agree as follows:
That the maximum obligation of the United States as set forth in Paragraph I of the Terms
and Conditions, Standard Conditions, on page 2 of said Grant Agreement, is hereby
increased by$35,008.00 from $3,000,000.00 to$3,035,008.00,
IN WITNESS WHEREOF, thepartieshereto have caused this Amendment to said Grant
Agreement to be duty executed as of the 25th day of Mav 1999
UNITED STATES OF AMERICA
FEDERAL AVIATION ADMINISTRATION
WESTERN PACIFIC REGION
By:
VF n L. Pfeifer
Title: Manager, Airports Office
- -s District
Page 1
Contra Costa County
(N of onsor)
By: -
Tit): Cha-r, Board. of: Supervisors
(SERI_)
Attest:
Title: Deputy Clerk
CERTIFICATE OF SPONSOR'S ATTORNEY:
1, Skaren acting as Attorney for Contra Costa County, (hereinafter
referred to as"Sponsor") do hereby certify.
That 1 have examined the foregoing Amendment to Grant Agreement and the proceedings
taken by said Sponsor relating thereto, and find that the execution thereof by said Sponsor has
been duly authorized and is in all respects due and proper and in accordance with the laws of
the State of California and further that, in my opinion, said Amendment to Grant
Agreement constitutes a legal and binding obligation of the Sponsor in accordance with the
terms thereof.
Do-'ed at Martinez, CA this lst day of June
19-92-.
Title: ASSIStant County Counsel
a. The date of exp vution by the Sponsor
should be entered on the first page of
this amendment.
b. 'ihe date of the Certificate of
Sponsor's Attorney MUST BE the same or
later than the date of execution.
c. The original SEAL ST BE stamped on this
page.
Page 2
._O: BOARD OF SUPERVISORS
�r
FROM: J. MICHAEL WALFORD, PUBLIC WORDS DIRECTOR
DATE: May 25, 1999
SUBJECT: Contract Award Recommendation:
Install Automated Weather Observing System III (Base Bid and All Three Alternatives),
Byron Airport,
County Prject No. 4875-6X5339; AIP Project No. 3-06-3008-09, Byron area
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
1. RECOMMENDED ACTION:
AWARD the contract for furnishing labor and materials for the subject project to S.R. Hamilton
Construction, Inc., the low bidder, who has also met the requirements of the County's Disadvantaged
Business Enterprise Contract Compliance Program, in the amount of$179,695.00, which includes the base
bid and all three alternatives, and at the unit prices submitted; and REQUIRE the contractor to present surety
bonds for Payment and Faithful Performance in the amounts of$179,695.00 and$179,695.00,respectively.
DIRECT the Public Works Director to prepare the contract for the project.
AUTHORIZE the Public Works Director to sign the contract on behalf of the Board subject to the Director
having reviewed and found sufficient all required documents, including the contract signed by the contractor,
the aforementioned surety bonds, and a certificate of insurance.
Continued on Attachment: X Yes SIGNATURE:
_RECOMIMMITI
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON N:ay 25, 1999 APPROVED AS RECOMMENDED OTHER_ --
VOTE OF SUPERVISORS
X UNANIMOUS(ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
RB:kj
G:\GRPDATA\CONST\BO\1999\05-MAY\A WO-25.DOC
Orig.Div:Pudic Works(Construction)
Contact: Mike Carlson(925)1313-2320 I hereby certify that this is a true and correct copy of an
cc: Cot:nty Amin action taken and entered on the minutes of the Board of
Auditor-Controller Supervisors on the date shown.
Public Works
Accounting,R.Gilchrist
Construction-R.Bruno
Design ATTESTED: ?ay 25, 1999--
S.B.E. PHIL BATCHELOR, Clerk of the Board of Supervisors and
703 Market St.
San Francisco,CA 94103-1000 County A ministfor
Contractor l
By � , Deputy
S'.BJECT Contract Award Recommendation:
Install Automated Weather Observing System III,Byron Airport,
County Project No.4875-6X5339;AIP Project No. 3-06-300809,Byron area
BOARD DATE: May 25, 1999
WAGE 2 of 2
L RECOMMENDED ACTION: (continued)
AUTHORIZE the Public Works Director to sign any escrow agreements prepared for this project to permit
the substitution of securities for moneys withheld by the County to ensure performance under the contract,
pursuant to Section 22300 of the Public Contract Code.
DIRECT that, in accordance with the project specifications and/or upon the execution of the contract by
the Public Works Director, any bid bonds posted by the bidders be exonerated and any checks or cash
submitted for bid security be returned.
Pursuant to Public Contract Code Section 4114, the Board DELEGATES its functions under Public
Contract Code Sections 4107 and 4110 to the Public Works Director or his designee.
Pursuant to Section 6705 of the Labor Code, the Board also DELEGATES to the Public Works Director
or to any registered civil or structural engineer designated by him the authority to accept detailed plans
showing the design of shoring,bracing, sloping or other provisions to be made for worker protection during
trench excavating covered by that section.
DECLARE that, should the award of the contract to e invalidated for any reason, the Board would not in
any event have awarded the contract to the second listed bidder or any other bidder, but instead would have
exercised its discretion to reject all of the bids received. Nothing herein shall prevent the Board from
reawarding the contract to another bidder in cases where the successful bidder establishes a mistake,refuses
to sign the contract or fails to furnish required bonds or insurance(see Public Contract Code Sections 5100-
5107).
II FINANCIAL IMPACT:
The project, including engineering and appropriate overhead charges, is funded by Federal Aviation
Administration(90%), State(4.5%) and County Enterprise Funds (5.5%).
III RECOMMENDATION/BA+CKGROUND:
The plans and specifications were approved and the project advertised for bids by the Board of Supervisors
on March 2, 1999. The bids were received and opened at 255 Glacier Drive,Martinez, California, on April
6, 1999. The construction bids received were as follows:
1. S. R. Hamilton Construction ................................................................................$179,695.00
2. Cal Electro, Inc.....................................................................................................$180,916.00
3. Royal Electric Company.......................................................................................$216,686.00
The Engineer's estimated construction cost was $184,225.00.
ina Requested B : C'/p
Recd.o eq Y
Centra Costa County Public works Dept.
Construction Division
255 Glacier Drive
Martinez, CA 94553
Return to:
WHEN RECORDED, RETURN TO CLERK
BOARD OF SUPERVISORS
BOARD OF SUPERVISORS, CONTRA COSTA COUNTY, CALIFORNIA
In the Matter of Accepting and Giving ) RESOLUTION OF ACCEPTANCE
Notice of Completion of Contract for } and NOTICE OF COMPLETION
Marsh Creek Levee Repair } (C.C. § 3086, 3093)
Project No.7521-6D9L79w97) RESOLUTION NO. 99/274
The Board of Supervisors of Contra Costa County RESOLVES that:
The County of Contra Costa on July 29, 1998 contracted with Gordon N. Ball, Inc., to excavate and
replace rock slope protection and place a horizontal layer of rock for drainage, with United States Fidelity
and Guaranty Company as surety, for work to be performed on the grounds of the County; and
The Public Works Director reports that said work has been inspected and complies with the approved
plans, special provisions and standard specifications and recommends its acceptance as complete as
of April 28, 1999.
Therefore, said work is ACCEPTED as completed on said date, and the Clerk shall file with the County
Recorder a copy of this Resolution and Notice as a Notice of Completion for said contract.
PASSED BY THE BOARD on May 25, 1999 by the following vote:
AYES: Supervisors Gioia, Uilkema, Gerber, DeSaulnier and Canciamilla
NOES: None
ABSENT: done
CERTIFICATION AND VERIFICATION
I hereby certify that this is a true and correct copy of an
action taken and entered on the minutes of the Board of
Contact: Mike Carison (925)313-2321 Supervisors on the date shown.
Orig. Dept.:Public works(Const.)
cc: Record and Return
Auditor ATTESTED: ta. 25 1999.
Public works- Accounting PHIL BATCHELOR Clerk of the Board of Supervisors and
- construction, R. Bruno
- 'traffic, S. Kersevan County Administr or
Contractor
RB/k# By i Deputy
G:\CrpData\ConstlB0\'999\05-May\MCLR-25.doc
RESOLUTION NO. 99/ 274
Recording Requested By:
Contra Costa County Public Works Dept. CONTRA CO$TA Co Recorder Office
Construction Division STEPHEN L. WEIR Clerk-Recorder
255 Glacier Drive 'DOC— 29b-0147965-00
Martinez, CA 9455
W, JUN 02, 38 13;24:20
Return to FItE 10.00
Ttl Pd $0.00 Nbr-0000637106
WHEN RECORDED, RETURN TO CLERI, lrclR011-1
BOARD OF SUPERVISORS
BOARD OF SUPERVISORS, CONTRA COSTA COUNTY, CALIFORNIA
In the Matter of Accepting and Giving RESOLUTION OF ACCEPTANCE
Notice of Completion of Contract for } and NOTICE OF COMPLETION
Marsh Creek Levee Repair } (C.C. 3 3086, 3093)
Pr iect No.7521&D9L79-97) RESOLUTION NO. 99L2
The Board of Supervisors of Contra Costa County RESOLVES that:
The County of Contra Costa on July 29, 1998 contracted with Cordon N. Ball, Inc., to excavate and
replace rock slope protection and place a horizontal layer of rock for drainage,with United States Fidelity
and Guaranty Company as surety, for work to be performed on the grounds of the County; and
The Public Works Director reports that said work has been inspected and complies with the approved
plans, special provisions and standard specifications and recommends Its acceptance as complete as
of April 28, 1999,
Therefore, said work is ACCEPTED as completed on said date, and the Clerk shall file with the County
Recorder a copy of this Resolution and Notice as a Notice of Completion for said contract.
PASSED BY THE BOARD on May 25, 1999 by the fallowing vote:
AYES: Supervisors Gioia, UiLkema,, Gerber, DeSaul.ni.er and Canciami.11a
NOES: None
ABSENT: IrTone
CERTIFICATION AND VERIFICATION
I hereby certify that this is a true and correct copy of an
action taken and entered on the minutes of the Board of
Contact: Mike Carlson (925)313-2321 Supervisors on the dans shown.
Org. Dept.:public works(Const.)
cc: Record and Return
Auditor ATTESTED: Yjay 25. 1 q9q
Public works- Accounting PHIL BATCHELOR,Clerk of the Board of Supervisors and
Construction,R.Bruno County Administrator
o- Traffic,S.Kersevan
Contractor
R$N By Deputy
G:tarpCata;Const\80i1999\05-MayWCLR-2 s.doe
RESOLUTION NO. 991.2 �
TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE FLOOD CONTROL
DISTRICT
iFROM. J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: May 25, 1999
SUBJECT: Approve plans and specifications and Advertise for bids for the Pine Creek Storm Damage
Repairs Project in the Walnut Creek area.
Project No,: 7520-6139P48-99, CDD-CP# 97-63 and 99-21
Specific Request(s) or Recommendation(s) & Background & Justification
1. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for Pine Creek Storm Damage Repairs Project and
ADVERTISE for bids to be received on Tuesday, June 29, 1999, at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
22037,
Continued on Attachment: X SIGNATURE: ��
RECOMMENDATION of COUNTY ADMINISTRATOR �
RECOMMENDATION OF BOARD COMMITTEE ✓
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON May 25, 1999 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
UNANIMOUS {ASSENT )
AYES: NOES:
ABSENT: ABSTAIN: I hereby certify that this is a true and correct
AK:s
copy of an action taken and entered on the Gminutes of the Board of Supervisors on the
:1GrpData\Design\Board t'�rcfersiBt7 1999\ p
Pine Creek Storm Damage Repairs 5-25.aoc date Shown.
trig.Div: Public works(Design Division)
Contact: Kevin Emigh(313-2233)
cc: E. Kuevor,CAO
Auditor-Controller
Community Development ATTESTED: 2 Y , 1999
PW Accounting PHIL BATCHELOR, Clerk of the Board of
Construction Supervisors and County Administrator
By
J L04j4AA
Deputy ,
SUBJECT. Approve Plans and Specifications and Advertise for bids for the Pine Creek Storm
Damage Repairs Project in the Walnut Creek area.
Project No. 7520-6B9P48-99, CDD-CP # 97-63 and 99-21
DATE:
PAGE: 2
11. FINANCIAL IMPACT:
The estimated contract cost of the project is $72,5010, funded by FEMA (75%), State (25%).
Ill, REASONS FOR RECOMMENDATION/1=3ACKGROUND:
The project is needed in order to stabilize the creek bank.
The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the
project.
The general prevailing rates of wages, which shall be the minimum rates paid on this project, have
been filed with the Clerk of the Board and copies will be made available to any interested party
upon request.
The Board reviewed and approved the project on August 13, 1997/March 19, 1999 and found, on
the basis of the initial study and all comments received, that there is no substantial evidence that
the project will have a significant effect on the environment and adopted the Negative Declaration
in compliance with the California Environmental Quality Act. A Notice of Determination was fled
with the County Clerk on August 13, 1997/March 19, 1999 that the project will not have a
significant effect on the environment.
IV, CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, it will not be constructed.
PROOF OF PUBLICATION
Contra cost
ion Cotrict
(2015.5 C.C.P,) Mood control and Water $�,[i
255 Ganservattdn District
lacier Cnve; Martinez,
STATE OF CAI IFORN:A California 94553-4897 I )
County of Contra Costa CONOTICE TO
NTRACTORS UN ^�
I am a citizen of the Ignited States and a resident of the JUN 30
$l
Count aforesaid; i ant over the age of eighteen The Chief Enghear a re-
County Y g 9 Years, calve espied par at the PubL—OMRA
������O�SUPEf�V'S�Rw
Pub-
and not a Nart to or interested in the above-entitled !ic works Df,;, 25 Department D.C..
Rich BulEart 255 lornia OS
matter. Drivek Martinez, California
9455.'-4897, until 2 o'clock
I am the Principal Legal Clerk of the Contra Costa Times, p.m. on June 29, 1999, at
a newspaper of general circulation, printed and published which
aptme they will
!read be pion
at 2640 Shadelands Drive in the City of Walnut Creek, PI,E CREEK STORM bAM-
County of Contra Costa, 94598. AGE REPAIRS.
General work description:
And which newspaper has been adjudged a newspaper of Channel l xcchydavatiioningengnd
genera, circulation by the Superior Court of the County of
Contra Costa, State of California, under the date of rock slope protection. e
OctCber 22, 1934. Case Number 19764. Engineer's cost estimate:
$1 3,500 I
The notice, of which the annexed is a printed copy (set in A pre-bld meating will be:
type not smaller than nonpareil), has been published in held on Monday, June 14,
1999,.at 10:00 a.m. at the
each regular and entire issue of said newspaper and not Public Warks Department to
in any supplement thereof on the following dates, to-wit: cover the County's Bidder
Outreach Program.Prospec-
tive bidders attendance Is
kine 7 recommended but not man-
al! in the year of 1399 includ-
Ingnpans and p clilfoations,
I certifytoil declare) under nay be viewed and%or ob-
penalty of perjury that the ta!ned at the Public Works
foregoing is true and correct. department,C.C.Rich Build-
Ing,255 Glacier Drive.Marti-
nez
da all'ornia 94da�-$897
Executed at Walnut Creek, California. y (7:cd i
a.m.-�v 2 Noon and 1:00 p.m.
On this 7 day of June, 1999 5:00 p.m.)(closed Fridays).f
Tc obtain plans and specill i
r canons a service charge is
Si nature s' required in the amount of
g r' $10.83 ,sales tax Included).
PLANS AND SPECIFICA-
Contra Costa Times MAILNS FORyORDERED
FORANADDITIONAL
P O Box 4147 SHIPPING AND HANDUNCi. The bid opening date may
Walnut Creev, CA 94596 FEE OF$3,00. Checks shah be extended by addendum
be made oa issued by the Public Works
(510)) 935-2525 County of Contra ICasta'and Department no later'than
be mailed to the above ad- June 25,1999,In whioh case
Proof of Publication of: dress.The Agency does not any bids submitted .or the
y orlglna3 hid opening will be
guarantee the arrival of the ret.rnad unopened and
(attached is a copy of the legal advertisement that pians and s ec!iieatlons in p
lime for bidding. Plans and sealed bid proposals for the
published) extended bid open!np shall
specifications will not be sent be submitted on or before Ju-
overnight mail. ly 13,1999 at 2:00 p.m.,and
This contract is subject to I will be opened,read and re-
state contract nondiscrimina-i corded at he same place
on and compliance require- specified above. All propos-:
an pursuant to Govern-I ala received late w!A be re-
meet Code,Section 12290. turned unopanal.
The Contractor shalt pos- The Bald Board reserves I
sass a Class A or Class 0-12 the right to reject any and all
Contractor's License at the bids or any portion of an Y bid c
time the Contract is awarded, and/or waive any irregularity
Bids must cover the entire In any bid received.
project, and neither partial For questions repardin❑❑the
nor contingent bids will be project contact Ai!Ison
considered. Knap Design Division, at
The successful bidder shall i(925)3'13-2177.
furnish a payment bond and
a erformance bond. By order of the Board of Su-
The Board has ascertained ervlsors as the governing
the general prevaliing rate of Cody of the Contra Costa
wages applicable to this County Flood Ocntrol and
work. The prevailing rate off Water Conservation District
ppes r diem wagsis on lie with° Phil Batchelor I
t'he Clerk Ott
Board of Su- Clerk of the Board of Supervl-
perv!sors,and Is Inco,p� ted sors and County Adm!nlstra-l
herein by reference t r to, for;
the same as If set forth In full 8y:Ann Cerveiil/263
herein. For any clasallcation Deputy
not included in the list, the Dated:June 7,1999
minimum wagge shall be the 4
prevalling rsia for Contra Legal CCT 8002
Costa County. Pu lien June 7,1999
TO:`-, BOARD OF SUPERVISORS �a
Fifth, J. MICHAEL WALFORD, PUBLIC WORDS DIRECTOR
DATE: MAY 25, 1999
SUBJECT: APPROVAL OF PAYMENT LIMIT INCREASE FOR LANDSCAPE MAINTENANCE
SERVICES BY THOMPSON LANDSCAPE MAINTENANCE IN COUNTY SERVICE AREA
M-8, DISCOVERY BAY AREA. PROJECT NO. 7478-2282-SAS 6X5009.
SPECIFIC REQUEST(s)OR RECOMMENDATION(s)&BACKCrROUND AND JUSTIFICATION
I. Recommended Action:
AUTHORIZE the Purchasing Agent to execute an amendment to increase the payment limit of the
agreement between Contra Costa County,County Service Area M-8 and Thompson Landscape Maintenance
from $136,560 to a new payment limit of$162,960.
IIa Financial Impact:
There will not be any financial impact to the General Fund. The funding source for this service is derived
from revenues generated by County Service Area M-8, Discovery Bay.
Continued on Attachment.X SIGNA'T'URE: �
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ONMy"
21, T77 APPROVED X
AS RECOMMENDED__X_OTHER
I hereby certify that this is a true and correct copy of an
action taken and entered on the minutes of the Board of
Supervisors on the date shown.
VOTE OF SUPERVISORS
UNANIMOUS(ABSENT �
AYES: NOES: ATTESTED: May 25, 1999
sE:PE:kw ABSENT- ABSTAIN: PHIL BATCHELOR, Clerk of the Board of Supervisors and
\\PWS:\SHARDATA1OrpData\SpDist\CONTRACTaoard6:ders\ County Administrator
Thompsorincrease.doc ;
€2rEg.F5?v: PuEs6ic Woks(Spatia!Districts) }
Contact: Paula Edmonds(313-2389) i 3
cc: County Administrator njAssessor ByDeputy
Auditor-Controller
Community Development
County Counsel
Skip Eppe.ly,Special Districts
SUBJECT. APPROVAL OF PAYMENT LIMIT INCREASE FOR LANDSCAPE MAINTENANCE
SERVICES BY THOMPSON LANDSCAPE MAINTENANCE IN COUNTY SERVICE AREA
M-8, DISCOVERY BAY AREA. PROJECT NO. 7478-2282-SAS 5X5009.
DATE: MAY 25, 1999
PAGE 2
III. Reasons for Recommendations and Background:
The scope of services in the original agreement with Thompson Landscape Maintenance is being increased.
In addition to the current services provided, Thompson Landscape Maintenance will provide landscape
maintenance along an approximate one mile strip of Highway 4 from Discovery Bay Boulevard to Cherry
Hills Drive. The increased payment limit reflects this increase in service.
IV. Consequences_of Negative Action:
Landscape maintenance will be negatively impacted without implementation of this payment limit increase.