HomeMy WebLinkAboutMINUTES - 04201999 - C9 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: April 20, 1999 SUBJECT: Approve the Joint Exercise of Powers Agreement between Contra Costa County and the City of Brentwood for the construction of a right turn lane on Lone Tree Way at Fairview Avenue, Brentwood area, Project No.: 0662-6R4006 SPECRC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION 1, Recommended Action: APPROVE the Joint Exercise of Powers Agreement between Contra Costa County and the City of Brentwood for the construction of a right turn lane on Lone Tree Way at Fairview Avenue. AUTHORIZE the Chair of the Board of Supervisors to execute the Joint Exercise of Powers Agreement. Continued on Attachment: X SIGNATUPi. RECOMMENDATION of BOARD COMM TEE —APPROVE —OTHER SIGNATURES : ACTION OF BOARD ON Prli a APPROVED AS RECOMMENDED x OTHER MOTE OF SUPERVISORS X UNANii OUS (ABSENT -- AYES: NOES. ASSENT; ABSTAIN: I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED:_April 20, 1999 Y:ei PHIL BATCHELOR, Clerk of the Board of G:1GrSupervisors and County Administrator �#�atalTra:�sim�g119991bobr99te1Bt7i3rerttwoodJ i;�'A.doc Orig. Dive Public works(TE) (IContact: Joe Yee(925)313-2258 � , c: M.Shiu,Assistant Public works Director By Deputy Public works Accounting a Approve the Joint Exercise of Powers Agreement between Contra Cash County and the City of Brentwood for the construction of a right turn lane on Lone Tree Way at Faiview Avenue. April 20, 1999 Fuge 2 IL Financiallmoact: There is no impact to the General Fund. The project is funded entirely with Federal FEES and City of Brentwood funds. III. Reasons for Recommendations and Background: The County applied for and received Federal HES funds to construct a right turn lane on Lone Tree Way at Fairview Avenue. However, on November 28, 1998, the City of Brentwood annexed this segment of Lane Tree Way. The City has requested that the County continue with design and construction of this project and agreed to pay for cost not reimbursable from Federal funds. IV. Consequences of Negative Action: If the agreement is not approved, the implementation of the project will be delayed and Federal funds may be jeopardized. JOINT EXERCISE OF POWERS AGREEMENT BETWEEN CONTRA COSTA COUNTY AND THE CITY OF BRENTWOOD FOR THE CONSTRUCTION OF A RICHT TURN LANE ON LONE TREE WAY AT FAIRVIEW AVENUE (County Project No.: 0662-684006) This AGREEMENT is entered into on the 20th day of April ' 1999, between the City of Brentwood, a municipal corporation of the State of California, hereinafter CITY, and the County of Contra Costa, a political subdivision of the State of California, hereinafter COUNTY, pursuant to Government Code section 6500, and following. The parties to this AGREEMENT mutually agree and promise as follows: 1. Purpose _and Scope of Work. The purpose of this AGREEMENT is to provide for the construction of a right turn lane on Lone Tree Way at Fairview Avenue (hereinafter PROJECT). The work to be performed consists of widening the existing roadway with asphalt concrete, providing necessary pavement stripes and markings, and other items of work necessary to complete PROJECT. 2. Responsibilities of CITY and COUNTY. A. CITY shall be responsible for the following: (1) Review and approve the plans, specifications, and cost estimate for the PROJECT. (2) Inspect and approve the PROJECT before PROJECT acceptance by the COUNTY. S. COUNTY shall be responsible for the following: (1) Act as lead agency. (2) Prepare design plans and specifications for the PROJECT. (3) Advertise and award the contract for the PROJECT. (4) Perform construction engineering, contract administration, and inspection of the PROJECT. ( ) Approve and accept the PROJECT when complete. (6) Prepare and deliver to the CITY a report of final PROJECT costs within 120 days of completion and acceptance of PROJECT. 1 Financial Reso nsibility. A. CITY and COUNTY acknowledge and agree that all cots for the PROJECT not reimbursable from Federal hazard Elimination Safety (HES) funds, incurred after the CITY's annexation of lone Tree Way on November 28, 1998, will be paid for by CITY as shown in attached Exhibit "A," which is incorporated here. The term COSTS, as used in this section, shall include, without limitation, design costs, construction contract costs, and construction engineeringAnspection costs. If it is found during construction that a cost overrun exceeding 20 percent of the estimate will occur, CITY shall endeavor to agree upon an alternative course of action. If after 30 days an alternative course of action is not agreed upon between CITY and COUNTY, this AGREEMENT shall be deemed terminated. CITY°S maximum cost .share shall be limited to $20,000 plus any CITY approved change orders. This amount represents the costs not reimbursable with HES funds as shown on attached Exhibit "A." CITY shall deposit $20,000 with the COUNTY, prior to the start of any work on the PROJECT. & Within one hundred twenty (120) days of the last contract payment of the PROJECT, COUNTY shall deliver a report of PROJECT expenditures to CITY with a bill for the additional amount owed to COUNTY due to any approved change orders. payment for the amount owed to COUNTY, if any, shall be made no later than forty- five (45) days after the date of billing by COUNTY. If CITY,S costs are less than the deposit paid, the excess shall be refunded to CITY within ninety (90) days of the last contract payment of the PROJECT. 4,, Change Orders. All contract change orders shall be approved in writing by CITY prior to execution by COUNTY, Any modifications to the plans as a result of a change order shall be performed by COUNTY. 5. Insurance and bold harmless. A. The contract documents for PROJECT shall include provisions requiring the successful bidder to; (1) secure and maintain in full force and effect during construction of PROJECT worker's compensation and public liability and property damage insurance in forms and limits of liability satisfactory to CITY and COUNTY, naming CITY and COUNTY, their governing bodies, officers, and employees as additional insureds, and (2) promise to hold harmless and indemnify CITY, its governing body, officers, and employees from liability to the same extent 2 as premised to COUNTY, (3) The aforementioned policy shall contain a provision that the insurance afforded thereby to the additional insureds shall be primary insurance to the Bail limits of the policy and that, if any of the additional insureds has other insurance or self- insurance against a loss covered by such policy, such insurance or self-insurance shall be excess insurance only. Before beginning construction of PROJECT, the contractor shall submit to CITY and COUNTY a certificate of insurance evidencing the required coverage and requiring the carrier to give at least thirty (30) days written notice to CITY and COUNTY of any cancellation, nonrenewal, or material modification of the policy. COUNTY shall be responsible for ensuring that this requirement has been met before allowing construction work to proceed. B. Neither COUNTY, nor any officer or employee thereof, shall be responsible for any damage or liability occurring by reason of anything done or emitted to be done by CITY or in connection with any work delegated to CI . under this AGREEMENT, and CITY shall defend, indemnify, save, and hold harmless COUNTY, its governing body, officers and employees, from the same, except as provided otherwise in section 7 below. C. Neither CITY, nor any officer or employee thereof, shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by COUNTY or in connection with any work delegated to COUNTY under this AGREEMENT, and COUNTY shall defend, indemnify, save, and held harmless CITY, its governing body, officers and employees, from the same, except as provided otherwise in section 7 below. D. Nothing in this AGREEMENT is intended or shall be construed to effect the legal liability of either party to third parties by imposing any standard of care greater than that imposed by law. 6. Acceptance. COUNTY shall accept PROJECT work when it has determined that the work has been properly completed and CITY has approved the work completed. 7. Maintenance. After PROJECT work is accepted by COUNTY, CITY shall own PROJECT and assume total responsibility for maintenance of the PROJECT and shall defend, indemnify, save, and hold harmless the COUNTY, its governing body, officers and employees, against all claims, suits, actions, or liability that arises relating to the use, operation, or maintenance of said PROJECT. 6. Restrictions. Pursuant to Government Code Section 6609, the powers of the parties under this AGREEMENT shall be subject to the restrictions on such powers 3 applicable to COUNTY. 9, Accountability. As required by Government Cade section 6505, both parties to this AGREEMENT shall provide a report providing strict accountability of all funds received and disbursed for PROJECT, which shall occur commensurate with final payment as set forth in Section 3B. 10. Agreement Modification. This AGREEMENT shall be subject to modification only with the written consent of the legislative bodies of both parties. Neither party shall unreasonably withhold its consent to the implementation and accomplishment of the overall purpose for which this AGREEMENT is drawn. This AGREEMENT supersedes all other AGREEMENTS between CITY and COUNTY, either written or oral, concerning the widening of Lone Tree Way at Fairview Avenue. 11, Agreement Expiration. T his AGREEMENT shall expire upon delivery of the report of receipts and disbursements and payment of all funds specified herein, except for the provisions of sections 5B, 5C and 7, which shall survive expiration of this AGREEMENT. CONTRA COSTA COUNTY CITY of Brentwood By By #rm , Board of Supervisors Mayor, Cljntrn Kidd ATTEST: Phil Batchelor, Clea of the Board of Supervi ors an ,!Coun rinistrator By putt' Recommend for Approval: Recommend for Approval: J. Michael Walford John Ste nson Public Works Director Cl n neer 1-5 By Form Approved: Approved Victor J. Westman Paul Anderson County.Counsel CITY Attorney By By Deputy r k\ WS?iSHAHDATA\Gr,'}Ora: TrarsEngtYEE\SrenwoodJE€ A.QoC 4 EXHIBIT A Engineenng Preliminary Cost Estimate Contra Costa County Department of Public Works Project Name: Lone Tree Way Right Turn Lane at Fairview Avenue(County Project No.:0662-684006) Project Location. On Lone Tree Way at Fairview Avenue in the Brentwood area. Project Description: Widen roadway to provide a right turn lane from Lone Tree Way onto Fairview Ave. Project Length: About 125m along Lone Tree Way and 30m along Fairview Ave. Date of Estimate: 8118198 Prepared by: A.Docto No, Description Quantity I Units Unit Cost i Total F ' Construction Area Signs i LS $1,500 $1,500 2 Traffic Control System i LS ! $110,000 $10,0003 E 3 (Relocate Roadside Sign 2 EAi $150 $3001 4 ;Relocate Mailbox 2 '; EA $1501 $300 5 Relocate Roadside Delineators 1 j LS $500y $500 fi Re'_ocate Traffic Signal and other Component1 LS $42,450' $42,450 7 Clearing and Grubbing, 3 1 LS $5,400 $5,0001 8 Roadway Excavation 240 M3 $20 $4,800 ' 9 ;Roadway Embankment FM 127 M3 $20 $2,540 10 ;Roadside Ditch Excavation 1 LS $1,01}01 $1,000 11 Minor Structure(Convert Drainage Inlet to Manhole) 3 i EA $1,3003 $3,900 12 Relocate Drainage Inlet(Type C&460mm Pipe) € 3 EA $1,750 $5,250 E 13 Asphalt Concrete l 194 TONNE $45 $8,730; 3 14 Aggregate Base 277 TONNE f $20 $5,540' 115 Aggregate Subbase 468 TONNE 3 $18f $8,424 16 'Shoulder Backing 38 ; TONNE $23 $874 17 Thermoplastic Traffic Striping 242 I M $36 $726 l8 Thermoplastic Pavement Markings-Type IV(R) 5 M2 $30 $150° 19 Roadside Traffic Sign(One Post) 2 EA 5250 ---- T 500 LABOR COSTS: Design Engineering(15%) $15,373 SUBTOTAL $102,484 Constriction Engineering( 5%; $15,373 OTHER COSTS $33,745 Environmental $3,000 SUBTOTAL $136,229 CONTINGENCY $11,786 TOTAL $148,015 Total LABOR COSTS $33,745 °CONTINGENCY is 10%of(SUBTOTAL plus Construction Engineering) Estimated cost to City of Brentwood is County's overhead cast for labor charges Total Estimated Labor Cast Design Eng. $15,373 Constrtaction Eng. $15,373 Environmental $3,000 T etal Est.Labor $33,745 Overhead Cost Total Est. Labor/1.68 $20,066.43