HomeMy WebLinkAboutMINUTES - 05121998 - C87 »:
TO: BOARD OF SUPERVISORS
FROM: TRANSPORTATION COMMITTEE
DATE: :May 4, 1998
SUBJECT: Modification of the Freeway Agreement for Interstate 80 in the Crockett and Hercules area.
SPECIFIC REQUEST(S)OR RECOMMENDATIM(S)&BACKGROUND AND JUSTIFICATION
1. Recommended Action:
APPROVE and AUTHORIZE the Chair to execute the Freeway Agreement with the State of
California dated September 27, 1955 for the portion of State Highway Route 80 between
California Street and the Contra Costa/Solano County line.
Continued on Attachment: X SIGNATURE:
RECOMMENDATION OF BOARD COMMITTEE )
—APPROVE _ OTHER f
f
v + A
SIGNATURES): Joe Canciamilla Donna Gig
ACTION OF BOARD oN I9'�-7,`' R VED AS RECOMMENDED�OTHER
VOTE OF SUPERVISORS i hereby certify that this is a true and correct
UNANIMOUS(ABSENT ) copy of an action taken and entered on the
AYES: NOES: minutes of the Board of Supervisors on the
ABSENT: ABSTAIN: date shown.
LT:eh ATTESTED:
g:ltranseng\bobr98te1845FreewayAgr.doc PHIL BATCHECOA, Clerk of the Board
of Supervisors and County Administrator
or'Ig.Div: Public Works(TE) r /--",
r "
Contact: Lowell Tunison,Tei.313-2382 By n $ e ky 12 a fir'° ,> Deputy
M.Shlu,Public Works -
PW Accounting
S.Chang,Caltrans
Modification of the Freeway Agreement for Interstate 80 in the Crockett and Hercules area.
May 4, 1998
Page 2
Ili. Reasons for Recommendations and Background:
Caltrans is replacing the 1929 Span of the Carquinez Bridge as a part of Regional Measure One
(RMI). The new span will be constructed westerly of the existing 1929 span. When the State built
the adjacent 1959 Span it entered into an agreement with the County dated September 27,1955.
The Bridge Relocation Project will require the relocation of the existing on and off ramps for the
community of Crockett as well as modifications of local streets. This requires the modification of
the original freeway agreement to allow Caltrans to work within County rights of way to accomplish
the Project. The County will agree to assume maintenance of the improvements constructed on
the local roads when the project is complete.
Caltrans, when it made the decision to immediately replace the 1929 span rather than retrofit it
for seismic integrity, embarked on an environmental process that has involved significant
community involvement. This process resulted in the replacement of the Crockett Interchange;
upgrade of the Wanda Way access; establishment of a community based liaison and information
office; and construction of the Cummings Skyway extension, as well as the identification of
numerous other mitigation measures that will occur with the Bridge construction.
If. Financlai trnnact:
All costs for the construction of the Bridge Relocation Project are from regional Measure One
which is bridge toll based. The cost of the Cummings Skyway Extension is split between County
and RM1 with the County's share derived from development mitigation.
IV. Consequences of Necgative Action:
Non-approval of the freeway agreement will delay construction of the Bridge Replacement Project
and will jeopardize the award of the Cummings Skyway Extension Project.
......... ......... ......... .__
...... ...._...... ......... ......... ......... ......... ......... _
.... ......... ......... ..............
.. .......................................................
04-CC-80-KP 18.2(PINI 11.3)to KP 22.7 (PM 14.1)
In the County of Contra Costa Between California
Street and the Contra Costa-Solano County Line.
F"E'WAY AGREEMENT
THIS AGREEMENT, made and entered into on this day of
, 19 ,by and between the STATE OF CALIFORNIA, acting by and through
the Department of Transportation(herein referred to as"STATE"), and the County of Contra
Costa(herein referred to as"COUNTY') ,
,
WITNESSETH;
WHEREAS,the highway described above has been declared to be a freeway by
Resolutions of the California Transportation Commission on October 30, 1947, December 16,
1953, and October 19, 1955; and
WHEREAS, STATE and COUNTY have entered into a Freeway Agreement dated
September 27, 1955, relating to that portion of State Highway Routes 80 and 4(formerly known
as Routes 14 and 106)between the north Town Limits of Hercules and the Carquinez Bridge;and
WHEREAS, the City of Hercules subsequently annexed certain areas including portions of
such freeway covered by said Freeway Agreement with the COUNTY dated September 27, 1955;
and
WHEREAS, a revised plan map for such freeway has been prepared showing the
proposed plan of the STATE as it affects roads of the COUNTY; and
WHEREAS, it is the mutual desire of the parties hereto to enter into a new Freeway
Agreement in accordance with the revised plan of said freeway
NOW, THEREFORE, IT IS AGREED.
1. This Agreement supersedes that portion of said Freeway Agreement dated September
27, 1955 between California Street and the Carquinez.Bridge.
2. COUNTY agrees and consents to the closing of COUNTY roads, relocation of
COUNTY roads, construction of frontage roads and other local roads, and other construction
affecting COUNTY roads, all as shown on said plan map attached hereto marked Exhibit A and
made a part hereof by this reference.
3. STATE shall, in the construction of the freeway and at STATE's expense, make such
changes affecting COUNTY roads in accordance with the plan map attached hereto marked
Exhibit A, except that at Cummings Skyway, the construction cost shall be borne by both
COUNTY and STATE as provided for in the Cooperative Agreement dated March 30, 1998 with
COUNTY specifying construction participation.
4. STATE agrees to acquire all necessary right of way as may be required for
construction, reconstruction, or alteration of COUNTY roads, frontage roads, and other local
1
roads, and COUNTY hereby authorizes STATE to acquire on its behalf all such necessary right of
way, except that the cost of right of way required to construct Cummings Skyway shall be borne
by COUNTY.
S. It is understood between the parties that the right of way may be acquired in sections
or units, and that both as to the acquisition of right of way and the construction of the freeway
projects, the obligations of STATE hereunder shall be carried out at such time and for such unit
or units of the projects as funds are budgeted and made lawfully available for such expenditures.
6. COUNTY will accept control and maintenance over each of the relocated or
reconstructed COUNTY roads, frontage roads, and other STATE constructed local roads on
receipt of written notice to COUNTY from STATE that the work thereon has been completed,
except for any portion which is adopted by STATE as a part of the freeway proper. COUNTY
will accept title to the portions of such roads lying outside the freeway limits upon relinquishment
by STATE.
7. This Agreement may be modified at any time by the mutual consent'of the parties
hereto, as may become necessary for the best accomplishment,through STATE and COUNTY
cooperation, of the whole freeway project for the benefit of the people of the STATE and
COUNTY.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed
by their respective duly authorized officers.
STATE OF CALIFORNIA THE COUNTY OF CONTRA COSTA
Department of Transportation by
't
JAMES W. VAN LOBEN SELS
Director of Transportation
by
ROBERT L.BUCKLEY
Project Planning and Design Engineer
APPROVE AS TO FORM: APPRONE AS TO FORM:
Attorney (State) Attorney (County)
r15��
�
C
1L
w
d
an,
d?
l.l..
0
N
+-
is ifi4ii4i!/.:}r>'
_... ............. . 4.::..............
W
*� c
O Y w►
�r0 0
11M
C ..r
Y
a.
o �>
A 0 ,.
�p p,
6
as .0 4 .>
i3
.0
B CL
? c 'o a
0OD -
!�
Q 3!S s1Nn� a 09777 7
z
0
OD
a�
---
.......... --------LU----6
100,
40, CD
AIV
LL. Ix
A'S pae
R
iJ7
d
.r
Q W
.� 0 41
h-
FF—
w V CJ'? Z
— 2 w 0 =
.... w Z 0 0 cl WW
(D u 4% w cc z
z 0 CD z Z
w W <t v c,y p Vim'? chi. 0 LC H a
x cr-
- w 4 a. Q Q 4 W D ;� N
tx ac H w O t� w U? 0
LL. LL. 11
ui t7 U H N ' ' ...
U. LL {J #... z4go ua
005 UJ-
, w E� LC U
0 „Q �
U) W 0 U. 0 �W
OD W
c.7 �
z
!fid-