HomeMy WebLinkAboutMINUTES - 04281998 - C70 TO: BOARD OF SUPERVISORS 250-9702/B.4.1 FROM: BARTON J. GILBERT,DIRECTOR OF GENERAL SERVICES DATE: April 28, 1998 • Contra SUBJECT: DISPATCH CENTER REMODELING,40 GLACIER..DRIVE, t Costa MARTINEZ,FOR SHERIFF-CORONER(WH354C,D) County SPECIFIC REQUESTS OR RECOMMENOATION(S)&BACKGROUND AND JUSTIFICATION 1. RFCOMMENDATION DETERMINE that there is a need to continue the emergency action taken by the Board on January 27, 1998 pursuant to Public Contract Code Sections 20134 and 22050,to remodel.40 Glacier Drive, Martinez for the Sheriff Dispatch Center. H. FINANCIAI,IMPACT Funding for this project has been budgeted. III. BACKGROUND A. On April 8, 1997 the Board accepted a report from the County Administrator and the Sheriff-Coroner regarding the Emergency Communications Center at 40 Glacier Drive,>Martinez and directed the Director of General Services to proceed with preparation of plans and specifications for remodeling the facility. B. On November 4, 1997 the Board accepted completion of the contract for improvements in unfinished, vacant space at 1960 Muir Road,Martinez. The improvements were made to accommodate the Sheriff Dispatch operation, which had to be moved out of 40 Glacier Drive, temporarily, before the remodeling of 40 Glacier Drive could begin. The improvements at 1960 Muir Road were accomplished and the Dispatch operation was relocated on an accelerated schedule to meet funding deadlines. Mkf- CONTINUED ON ATTACHMENT: YES SIGNATURE: k RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS UNANIMOUS(ASSENT AYES: NOES. ASSENT: ABSTAIN: I HERESY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN MEDIA CONTACT: BARTON J.GILBERT(313-7100) AND ENTERED ON THE MINUTES OF TME BOARD OF SUPERVISORS jON THE DATE SHOWN. �t ATTESTED ` " -�E�R CLERK THq�� OF PHIL BA CC: General chit Services inn Department SUPERVISORS AND COUNTY ADMINISTRATOR Architectural Division File:250-9702/A.5 rn.AIQQA County Administrator's Office County Counsel(Via A.D.) BYDEPUTY Sheriff-Coroner(Via A.D.) H:11997t250970217L00258B.WF`D GB:Is Page 1 of 2 M382 (IM8) REMODELING, 40 GLACIER DRIVE, MARTINEZ FOR 250-97021B.4.1 SHERIFF DISPATCH(WH354C,D) April 14, 1998 C. In December,the Sheriff determined that the temporary Dispatch Center does not have enough work stations to properly handle a countywide emergency. Consequently, on January 27, 1998 (Agenda Item C-57), the Board 1) found that an emergency exists, 2) delegated authority to the General Services Director to proceed in the most expeditious manner to remodel the 40 Glacier Drive Dispatch Center, 3) directed the General Services Director to make reports to enable the Board to review,the emergency actions and to determine that there is a need to continue the action, and 4) declared that the project, as an emergency, is exempt from the provisions of the California Environmental Quality Act. D. The condition that the Board found to be an emergency on January 27 continues to exist. That is, the temporary facility at 1960 Muir Road is serving as the Dispatch Center while the remodeling of the permanent facility at 40 Glacier Drive is in progress on an urgent basis.Therefore, it is necessary to continue the emergency action previously taken by the Board so that the remodeling can be completed in the shortest time possible. E. Lease Management Division negotiated a lease for temporary space at 827 Arnold Drive, Suites 80 and 230,in Martinez,to house the administrative personnel who are displaced by the remodeling of 40 Glacier Drive. The administrative personnel vacated 40 Glacier Drive and occupied the Arnold Drive Suites on March 18, 1998. F. On February 1.8, the proposed contractor submitted a proposal, work ;plan and schedule for construction,based on progress prints of the construction documents. A contract,effective February 4, 1998,was issued to the Contractor,RGM and Associates,Inc.,on March 5, 1998 with an effective date of February 4, 1998 and a payment limit of$658,796.00. On March 6, 1998, the completed construction drawings were issued to the contractor with a request for confirmation of the payment limit. On March 17, a formal notice to proceed was issued to confirm the contract starting date of February 4, 1998. The contractor started demolition work on March 23, 1998. G. A consulting services agreement with Harding Lawson Associates was issued with an effective date of March 10, 1998 and a payment limit of $5,800.00. The agreement covers geotechnical engineering services,including recommendations for foundation design and construction,and on-site testing of existing and imported soils. H. A consulting services agreement with Signet Testing Labs was issued with an effective date of March 10, 1998 and a payment limit of$72,726.00. The agreement covers construction materials testing and special inspections in accordance with the requirements for essential services buildings in Title 24 of the California Code of Regulations. I. As of April 15, 1998 the contractor completed the interior demolition and ung for new interior partitions; accomplished approximately 30% of the electrical work; completed about 10% of the mechanical work; started installation of a steel structural frame that replaces part of the seismic resistance system of the original structure; and started earthwork for the locker room addition. HAI 997\2 509702\7 L40258 B.W P D RH:GC:ls Page 2 of 2