HomeMy WebLinkAboutMINUTES - 04141998 - C151 To: BOARD OF SUPERVISORS 250-9702/B.4.1 FROM: BARTON J. GILBERT, DIRECTOR OF GENERAL SERVICES DATE: April 14, 1998 Contra SUBJECT: DISPATCH CENTER REMODELING, 40 GLACIER DRIVE, Costa MARTINEZ,FOR.SHERIFF-CORONER(WH354C,D) County ty SPECIFIC REQUESTS OR RECOMMENDATtON(S)8 BACKGROUND AND JUSTIFICATION I. REC EhMATION DETERMINE that there is a need to continue the emergency action taken by the Board on January 27, 1998 pursuant to Public Contract Code Sections 20134 and 22050,to remodel 40 Glacier Drive, Martinez for the Sheriff Dispatch Center. II. FINANCIAL IMPACT Funding for this project has been budgeted. III. BACKGROUND A. On April 8, 1997 the Board accepted a report from the County Administrator and the Sheriff-Coroner regarding the Emergency Communications Center at 40 Glacier Drive,,Martinez and directed the Director of General Services to proceed with preparation of plans and specifications for remodeling the facility. B. On November 4, 1997 the Board accepted completion of the contract for improvements in unfinished, vacant space at 1960 Muir Road,Martinez. The improvements were made to accommodate the Sheriff Dispatch operation, which had to be moved out of 40 Glacier Drive, temporarily, before the remodeling of 40 Glacier Drive could begin. The improvements at 1960 Muir Road were accomplished and the Dispatch operation was relocated on an accelerated schedule to meet funding deadlines. CONTINUED ON ATTACHMENT:__X,_YES SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS UNANIMOUS(ABSENT } AYES: t, r ', NOES: ABSENT: 2- ABSTAIN: i HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN MEDIA CONTACT: BARTON J.GILBERT(313-7100) AND ENTERED ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. ATTESTED APR 14 in CC: General Services Department PHIL BATCHELOR,CLERK OF THE BOARD OF Architectural Division SUPERVISORS AND COUNTY ADMINISTRATOR File:250-97027A.5 County Administrator's Office l , County Counsel(Via A.D.) BY '1,4111,(, D 4 _ L_� � ,DEPUTY Sheriff-Coroner(Via A.D.) y t v H:119971250970217L00250B.WPD GB:ls Page 1 of 2 M382 (10188) REMODELING, 40 GLACIER DRIVE, MARTINEZ FOR 250-9702/B.4.1 SHERIFF DISPATCH(WH354C,D) April l4, 1998 C. In December,the Sheriff determined that the temporary Dispatch Center does not have enough work stations to properly handle a countywide emergency. Consequently, on January 27, 1998 (Agenda Item C-57), the Board 1) found that an emergency exists, 2) delegatedauthority to the General Services Director to proceed in the most expeditious manner to remodel the 40 Glacier Drive Dispatch Center, 3) directed the General Services Director to make reports to enable the Board to review the emergency actions and to determine that there is a need to continue the action, and 4) declared that the project, as an emergency, is exempt from the provisions of the California Environmental Quality Act. D. The condition that the Board found to be an emergency on January 27 continues to exist. That is, the temporary facility at 1960 Muir Road is serving as the Dispatch Center while the remodeling of the permanent facility at 40 Glacier Drive is in progress on an urgent basis.Therefore,it is necessary to continue the emergency action previously taken by the Board so that the remodeling can be completed in the shortest time possible. E. Lease Management Division negotiated a lease for temporary space at 827 Arnold Drive, Suites 80 and 230,in Martinez,to house the administrative personnel who are displaced by the remodeling of 40 Glacier Drive. The administrative personnel vacated 40 Glacier Drive and occupied the Arnold Drive Suites on March 18, 1998. F. On February 18, the proposed contractor submitted a proposal, work' plan and schedule for construction,based on progress prints of the construction documents. A contract,effective February 4, 1998,was issued to the Contractor,RGM and Associates,Inc.,on March 5, 1998 with an effective date of February 4, 1998 and a payment limit of$658,796.00. On March 6, 1998,the completed construction drawings were issued to the contractor with a request for confirmation of the payment limit. On March 17, a formal notice to proceed was issued to confirm the contract starting date of February 4, 1998. The contractor started demolition work on March 23, 1998. G. A consulting services agreement with Harding Lawson Associates was issued with an effective date of March 10, 1998 and a payment limit of $5,800.00. The agreement covers geotechnical engineering services,including recommendations for foundation design and construction,and on-site testing of existing and imported sails. H. A consulting services agreement with Signet Testing Labs was issued with an effective date of March 10, 1998 and a payment limit of$72,726.00. The agreement covers construction materials testing and special inspections in accordance with the requirements for essential services buildings in Title 24 of the California Code of Regulations. I. As of March 31, 1998 the contractor accomplished approximately 90%of the interior demolition; 80%of framing for new interior partitions; and 10%of the electrical work. Intermittent rain has delayed the start of earthwork and grading for the locker room addition. HAI 997\2509702\7LOO25OR W PD GBAs Page 2 of 2