HomeMy WebLinkAboutMINUTES - 07151997 - C41 0.41 TO: BOARD OF SUPERVISORS FROM: PHIL BATCHELOR,COUNTY ADMINISTRATOR DATE: g 1 SJ I cl 9, SUBJECT: APPROVING AND AUTHORIZING THE ISSUANCE OF A CHANGE ORDER TO THE CONTRACT FOR BID PACKAGE NO.3-CONSTRUCTION OF NEW HOSPITAL,2500 ALHAMBRA AVENUE,MARTINEZ(WH580B) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE the issuance of Change Order No. 111 to the Contract dated February 7, 1995 issued to Centex Golden Construction Co. for the Construction of a New Hospital at 2500 Alhambra Avenue, Martinez, and AUTHORIZE the County Administrator or his designee to execute the Change Order. II. FINANCIAL IMPACT Change Order No. 111 totals$157,883.00. Funds in the capital account established for the project are sufficient to cover the amount encumbered by this contract, from bond proceeds specified to the project. Bond financing for the total project cost was secured in May, 1992 in accordance with the Board of Supervisors' direction. CONTINUED ON ATTACHMENT: X YES SIGNATURE: Z --1 " RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDAtfON OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN 7UNANIMOUS(ABSENT ) AND ENTERED ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. AYES: NOES: ABSENT: ABSTAIN: p ATTESTED PHIL B CH OR,CLFAK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR CONTACT: D.Bell,CAO i CC: Auditor/Controller BY DEPUTY GSD(Accounting) O'Brien-Kreitzberg(via CAO) Contractor(Via CAO) Page 1 of 2 Board Order to Approve Issuance of a Change Order for Merrithew Memorial Hospital Replacement Project Bid Package No. 3 III. REASONS FOR RECOMMENDATIONS Change Order No. 111 will provide for the following: Proposed Change Order No..323 The contract specifications mandated that all fuel oil piping, including interior piping, should be routed through double containment piping. Upon further investigation,it was determined that no code or enforcement'agency required the double containment of interior fuel oil piping. Based on this, the double containment requirement, for the interior fuel oil piping, was rescinded. A significant credit was obtained for the deleted scope of work. ($25,000.00) Proposed Change Order No. 501 The contract drawings and specifications depicted field fabricated column covers. The contractor proposed, and the architect concurred, that the use of prefabricated Glass Reinforced Concrete (GFRC) would produce a more aesthetic and consistent finish. The use of GFRC also reduces the associated labor costs,for which the Owner took a credit. ($ 5,200.00) Proposed Change Order No.539 The contract documents depict numerous electrical and mechanical utilities running through the exit stairways. Exit stairways are prohibited from having any utilities,which do not directly serve the stair, within the rated envelope. The solutions included increasing the rating on the stair soffits, which enclose the utilities,and adding rated ceilings. $ 29,741.00 Proposed Change Order No. 558.2 In order to leverage existing utility services, the Owner has requested that the new lab building utilize the existing hospital's central plant for chilled water service. In order to minimize time impacts, the Contractor was authorized to purchase the chilled water piping. This piping will be installed concurrently with other contract site utilities. $158,342.00 The new guaranteed maximum cost will exceed the total estimated cost stated in the construction contract agreement approved by the Board on February 7, 1995. The new guaranteed maximum cost will total$47,783,810.00. Page 2 of 2