TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA
COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: June 17, 1997
SUBJECT: Approve Plans and Specifications and Advertise for bids for the Livorna Road Bridge
Water Main Relocation Project.
Project No. 7520-6138562-95, CP # 95 -64.
Specific Request(s) or Recommendation(s) & Background A Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Project and
ADVERTISE for bids to be received on Tuesday, July 22, 1997 at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
22037 of the Public Contract Code.
II. FINANCIAL IMPACT:
The estimated contract cost of the project is $90,000, funded by Flood Control Zone 3B Funds.
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The water line relocation is needed to eliminate an existing conflict with the planned San Ramon
Creek Improvement Project.
The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the
project.
Continued on Attachment: x SIGNATUR
_RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JUN 17 1997 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
PD:jlg
g:\design\bo\bojun 17.wpd
Orig.Div: Public Works(Design Division) I hereby that MIs Is a true and cortect copy of
Contact: Paul Detiens(313-2394) BBoa d of Supervisors on Ne date shown loofas of the
cc: County Administrator
Attn: E.Kuevor ATTESTED:
PHIL BATCH iG larl .:,?tb6 oa cardd
Auditor-Controller of Supervlsora and County Administrator
PW Accounting
Construction _
Design-Environmental Deputy
Community Development
96
•P.-r proN;s Plans and Specifications and Advertise for bids for the Livorna Road Bridge Water Main
Relocation Project
June 17, 1997
Page 2
The general prevailing rates of wages, which shall be the minimum rates paid on this project,
have been filed with the Clerk of the Board and copies will be made available to any interested
party upon request.
The Board reviewed and approved the San Ramon Creek Flood Control projects on June 16,
1987 and Addendums 1-4 on the following dates: (January 12, 1993, May 2, 1995, October 17,
1995 and December 12, 1995).
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, it will not be constructed.