Loading...
HomeMy WebLinkAboutMINUTES - 06171997 - C107 g J i - -Av TO: = BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: JUNE 17, 1997 SUBJECT: Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310" Land Creep, Bay Point Project No.: 4500-6135094 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 4, 1996, pursuant to Public Contract Code Sections 22035 and 22050, to repair the "Hill 310" Land Creep, Bay Point. II. Financial Impact: Total cost of repairs cannot be fully determined at this time, but staff is developing an estimate for completion of the repair. III. Reasons for Recommendations and Background: A. On February 26, 1996, Public Works and Building Inspection were notified that cracks were occurring in Beaulieu Court. The County hired a geotechnical firm to identify the cause of the slide, and recommend and direct remedial actions to mitigate land movement. B. On March 19, 1996, the Board of Supervisors concurred in the County Administrator's proclamation of a local emergency. C. On June 4, 1996, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the area subject to creep. Continued on Attachment: X SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE —APPROVE —OTHER SIGNATURE(S): 1 ACTION OF BOARD ON JUN 17 1997 APPROVED AS RECOMMENDED_OTHER_ VOCE OF SUPERVISORS �f UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: JPM:tt g\const\BO\H310-3.t6 Orig.Div: Public Works(Construction) t hereby cantly that this is a true and correct coq of Contact: Joseph P.Murphy(313-2320) an action taken and entered on the minutes of ft cc: CAO hoard of Supervispr�lgq�a 71199 g. Auditor/Controller ATTESTED: JJ® County Counsel PHIL BATCHELOR,Clerk of the board GMEDA ors of Supervisand County Administrator Design Div. Construction Div.-R.Bruno (Original to file) Maintenance Div. Contractor 0167 Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310"Land Creep June 17, 1997 Page Two III. Reasons for Recommendations and Background (cont'd): D. Repair status: The Drainage Gallery contract has been completed. Contracts to seal the slope fissure and reconstruct Beaulieu Place have begun. This work is estimated to last two months. The contract to landscape the earth buttress at the end of Sandy Cove Lane has been awarded and will be done concurrently with the road reconstruction. IV. Consequences of Negative Action: This project is part of a series of sequential construction projects that will stabilize the landslide and restore the streets and sidewalks of the affected neighborhood. A negative action would stop this process.