SUBJECT: Award of Contract for Drainage Area 57 Detention
Basin Primary Spillway, Martinez area
Project No. 7538-6D8463-94
Bidder Total Amount Bond Amounts
Hess Concrete Const. Co. , Inc. $213,425. 00 Payment:
4484 Hess Dr. $106,712 . 50
American Canyon, CA 94589 Performance:
$213, 425. 00
Cimarron Construction
Oakdale, CA
W.R. Forde Associates
Greenbrae, CA
Pfister Excavating, Inc.
Napa, CA
The above-captioned project and the plans and specifications
therefor having been previously approved, and bids having been duly
invited and received by the Chief Engineer on May 20, 1997 ; and
The Contract Compliance Officer having reported that the lowest
monetary bidder, William G. McCullough Co. ("McCullough") , has attained
MBE participation of 11.7% and WBE participation of 0.2%, which does
not meet the M/WBE goals for this project (14% and 6%) , the Contract
Compliance Officer having determined that McCullough has failed to
document an adequate good faith effort to comply with said goals and
the M/WBE requirements, as provided in the project specifications, and
the Contract Compliance Officer recommending rejection of said bid; and
McCullough having been notified in writing of the Contract
Compliance Officer' s determination, having appealed it to the County
Administrator, as provided in the project specifications, and the
County Administrator having denied McCullough's appeal; and
The bidder listed first above, Hess Concrete Construction Co. ,
Inc. ("Hess") , having submitted the lowest responsive and responsible
bid, which is $16, 025. 00 less than the next lowest bid; and
The Contract Compliance Officer having reported that Hess has
attained MBE participation of 14. 6% and WBE participation of 9. 5%,
which exceeds the M/WBE goals for this project; and
The Chief Engineer recommending that the bid submitted by Hess is
the lowest responsive and responsible bid, and this Board concurring
and so finding;
NOW, THEREFORE, the Board finds, determines and orders as follows:
The Board DETERMINES that the lowest monetary bidder, McCullough,
has failed to meet the MBE and WBE goals for this project and has
failed to document an adequate good faith effort to comply with said
goals and the M/WBE requirements for this project, and the Board
FURTHER DETERMINES that said bid is non-responsive and REJECTS said bid
on that basis; and
ewe
AWARD OF CONTRACT FOR THE DA 57 DETENTION June 10, 1997
BASIN PRIMARY SPILLWAY, MARTINEZ AREA
The Board DENIES the appeal filed by McCullough; and
The Board FURTHER DETERMINES that Hess, as the lowest responsive
and responsible bidder, has exceeded the M/WBE goals for this project
and has complied with the M/WBE requirements for this project, and the
Board WAIVES any irregularities in such compliance; and
The Board ORDERS that the contract for the furnishing of labor and
materials for said work is awarded to Hess at the listed amount and at
the unit prices submitted in said bid, and that said contractor shall
present two good and sufficient surety bonds as indicated above, and
that the Chief Engineer shall prepare the contract therefor; and
The Board FURTHER ORDERS that after the contractor has signed the
contract and returned it, together with the bonds as noted above and
any required certificates of insurance or other required documents, and
the Chief Engineer has reviewed and found them to be sufficient, the
Chief Engineer is authorized to sign the contract for this Board; and
The Board FURTHER ORDERS that, in accordance with the project
specifications and/or upon signature of the contract by the Chief
Engineer, any bid bonds posted by the bidders are to be exonerated and
any checks or cash submitted for security shall be returned; and
The Board FURTHER ORDERS that the Chief Engineer is authorized to
sign any escrow agreements prepared for this project to permit the
substitution of securities for moneys withheld by the District to
ensure performance under the contact, pursuant to Section 22300 of the
Public Contract Code; and
Pursuant to Public Contract Code Section 4114, the Board DELEGATES
its functions under Public Contract Code Sections 4107 and 4110 to the
Chief Engineer or his designee; and
Pursuant to Labor Code Section 6705, the Board FURTHER DELEGATES
to the Chief Engineer or to any registered civil or structural engineer
employed by the District or County the authority to accept detailed
plans showing the design of shoring, bracing, sloping or other
provisions to be made for worker protection during trench excavation
covered by that section; and
The Board DECLARES that, should the award of the contract to Hess
be invalidated for any reason, the Board would not in any event have
awarded the contract to any other bidder, but instead would have
exercised its discretion to reject all of the bids received. Nothing
herein shall prevent the Board from reawarding the contract to another
bidder in cases where the successful bidder establishes a mistake,
refuses to sign the contract or fails to furnish required bonds or
insurance (see Public Contract Code Sections 5100-5107) .
Contact: Joseph P. Murphy, (510) 313-2321
Orig. Dept: Public Works Department I fweby am*that this Is a Otte andof
Construction Division at action taken and entered on the mwimcoq l:
0oard of Supervlsom on the date shown.
0 --
cc: Public Works Department PHILBATCM o , tiro the board
Of Supervisors and County Administrator
- Construction Division
- Accounting
County Counsel
Auditor-Controller
Hess Concrete Const. Co. , Inc. (Via Const. Div. )
Wm. G. McCullough Co. (Via Const. Div. )
Surety (Via Const. Div. )
S.B.E.
703 Market St.
San Francisco, CA 94103-1000