HomeMy WebLinkAboutMINUTES - 05061997 - C114 TO' BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: MAY 6, 1997 SUBJECT: Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310" Land Creep, Bay Point Project No.: 4500-6G5094 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on June 4, 1996, pursuant to Public Contract Code Sections 22035 and 22050, to repair the "Hill 310" Land Creep, Bay Point. II. Financial Impact: Total cost of repairs cannot be fully determined at this time, but staff is developing an estimate for completion of the repair. 111. Reasons for Recommendations and Background: A. On February 26, 1996, Public Works and Building Inspection were notified that cracks were occurring in Beaulieu Court. The County hired a geotechnical firm to identify the cause of the slide, and recommend and direct remedial actions to mitigate land movement. B. On March 19, 1996, the Board of Supervisors concurred in the County Administrator's proclamation of a local emergency. C. On June 4, 1996, the Board of Supervisors declared an emergency and authorized the Public Works Director to proceed in the most expeditious manner to repair the area subject to creep. Continued on Attachment: X SIGNATUR "&��A _RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE —OTHER SIGNATURE(S): ACTION OF BOARD ON -7y)._� (o) )qcl`7 APPROVED AS RECOMMENDED_OTHER_ VOCE OF SUPERVISORS ✓✓ UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: JPM:tt g\const\B 0\H 310-6.t5 Orig.Div: Public Works(Construction) I hereby=*that ft Is a true and correctof Contact: Joseph P.Murphy(313-2320) an action taken and entered on the minutes W tlro cc: CAO Board of 8 M�Cl.' AuditorlController AI TESTEDCounty Counself'HILB thGMEDA ofSuperr Design Div. Construction Div.-R.Bruno (Original to file) -� Maintenance Div. Contractor 11�4 Determine the Need to Continue the Emergency Action Regarding the Repair of"Hill 310"Land Creep May 6, 1997 Page Two III. Reasons for Recommendations and Background (cont'd): D. Repair status: A landscape consultant was hired to prepare a planting and irrigation plan for the earth buttress. The planting is scheduled to take place in September and October-1997. The plans and specifications,are completed for reconstruction of Beaulieu Drive, Beaulieu Place, and Sandy Cove Lane. This work is scheduled to occur in June and July-1997, after completion of the drainage gallery and utility replacements. An architectural consultant was hired to coordinate the structural repair work on several residences affected by the ground movement. The repair work is scheduled to take place in August and September-1997. Repair of the damaged water main is almost complete as is the construction of the drainage gallery. Estimated date of completion is May 5, 1997 IV. Consequences of Negative Action: This project is part of a series of sequential construction projects that will stabilize the landslide and restore the streets and sidewalks of the affected neighborhood. A negative action would stop this process.