Loading...
HomeMy WebLinkAboutMINUTES - 05201997 - C4 : 0. 4 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: May 20, 1997 SUBJECT: Approve Alhambra Valley Road Storm Damage at Pinole Creek Project, in the EI Sobrante Area. Project No.: 0672-6R6254-97, CDD-CP#97-23 SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE project, and DETERMINE that the project is a California Environmental Quality Act Class 1c Categorical Exemption, and DIRECT the Public Works Director to prepare contract plans and specifications for construction. DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk. DIRECT the Public Works Director to arrange for payment of the $25.00 handling fee to the County Clerk. II. Financiallmpact: The estimated project cost is $130,000, funded by FHWA (88.5%) and Road Funds (11.5%). III. Reasons for Recommendations and Background: The project includes stabilizing the banks with ungrouped rock slope protection, construction of the roadway shoulder wide enough to accommodate a future 8 ft. trail, and minor drainage improvements. It is needed to repair a slide in the roadway embankment that threatens to undermine the roadway. Continued on Attachment: X SIGNATURE: ftyayu�_ _RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE _OTHER SIGNATURE(S): ACTION OF BOARD ON 7'✓►a-yam 2 a� /Y`/7 APPROVED AS RECOMMENDED OTHER _ VOTE OF SUPERVISORS UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: CB:jlg c\BO:bo:alstorm.t5 I trefy Md this is a true and correctoopy Contact: Christopher Bailey, (313-2339) on action taken and entered on the mmutsa of tlt� Of Supervlsonl on the data shown. Orig. Div: Public Works (Design Division) DOW oo cc: County Admin. 401=pNaaarc r a.ci®rko tnenoard Attn: E. Kuevor 618upernlsas countyndmmiaram, Community Development PW Accounting M Orotic Design-J. Frattini J. Bueren,Transp. Eng. Approve Alhambra Valley Road Storm Damage at Pinole Creek Project, in the EI Sobrante Area Page 2 May 20, 1997 IV. CONSEQUENCES OF NEGATIVE ACTION: Delay in approving the project will result in a delay of design and construction and may jeopardize funding. CALIFORNIA ENVIRONMENTAL QUALITY ACT Notice of Exemption Contra Costa County Community Development Department 651 Pine Street, 4th Floor - North Wing, McBrien Administration Building Martinez, CA 94553-0095 Telephone: (510) 313-2284 Contact Person: Joseph J. Olsen - Public Works Dept. Project Description, Common Name (if any) and Location: Alhambra Valley Road Storm Damage @ Pinole Creek, County File #CP 97-23: The purpose of the proposed project is to repair a slide in the roadway embankment that threatens to undermine the roadway. To stabilize the bank and minimize erosion, material will be excavated and replaced with ungrouted rock slope protection which will be filled with soil and seeded upon completion of the project. The roadway shoulder will be replaced and widened on.the north side to accommodate an 8 foot wide path. Associated ancillary features (e.g. drainage downdrains and AC dike) will also be,included in the repair. A minor amount of guard rail will be reinstalled upon completion of the project Project location: The slide is located on the northern roadway embankment of Pinole Creek on Alhambra Valley Road, just west of Castro Ranch Road. This project is exempt from CEQA as a: Ministerial Project(Sec. 15268) _ Other Statutory Exemption, Section_ Declared Emergency(Sec. 15269(a)) _ General Rule of Applicability(Section 15061(b)(3) _ Emergency Project(Sec. 15269(b) or(c)) ✓ Categorical Exemption, Class 1 c for the following reason(s): The proposed project will restore the structural integrity to the roadway. The repairs will not involve an expansion of use beyond that previously existing nor result in the removal of any scenic resources. Date: By: Community Development Department Representative AFFIDAVIT OF FILING AND POSTING I declare that on I received and posted this notice as required by California Public Resources Code Section 21152(c). Said notice will remain posted for 30 days from the filing date. Signature Title Applicant: County Public Works Department 255 Glacier Drive Martinez, CA 94553 Attn: Janet Frattini County Clerk Fee$25 Due h:\noe°s\alpinole.noe (Rev.2/97) CONTRA PUBLIC WORKS DEPARTMENT COSTA INITIAL STUDY COUNTY OF ENVIRONMENTAL SIGNIFICANCE PROJECT # 0672-6R6254-97 CP# 97-23 PROJECT NAME: Alhambra Valley Road Storm Damage @ Pinole Creek PREPARED BY: Janet Frattini DATE: March 25, 1997 APPROVED BY: I btdaAk) DATE: QoAk J* 0 qc( RECOMMENDATIONS: (✓) 'Categorical Exemption (Class 1c ) ( ) Negative Declaration ( ) Environment Impact Report Required ( ) Conditional Negative Declaration The project will not have a significant effect on the environment. The recommendation is based on the following: The proposed project will restore the structural integrity to the roadway. The repairs will not involve an expansion of use beyond that previously existing nor result in the removal of any scenic resources. What changes to the project would mitigate the identified impacts. N/A USGS Quad Sheet Briones Base Map Sheet # H-8 Parcel # N/A GENERAL CONSIDERATIONS: 1. Location: The slide is located on the northern roadway embankment of Pinole Creek on Alhambra Valley Road, just west of Castro Ranch Road (Figures 1 & 2). 2. Project Description: The purpose of the proposed project is to repair a slide in the roadway embankment that threatens to undermine the roadway. To stabilize the bank and minimize erosion, material will be excavated and replaced with ungrouted rock slope protection which will be filled with soil and seeded upon completion of the project. Some small willow trees may be removed within the project area, however, they do not represent a scenic resource. The roadway shoulder will be replaced and widened on the north side to accommodate an 8 foot wide path. Associated ancillary features (e.g. drainage downdrains and AC dike) will also be included in the repair. A minor amount of guard rail will be reinstalled upon completion of the project (Figurej. 3 3. Does it appear that any feature of the project will generate significant public concern? [] yes [✓] no [] maybe (Nature of concern): 4. Will the project require approval or permits by other than a County agency? [✓] yes a no Agency Name(s) EBMUD (Encroachment permit) and DFG 1601 (Streambed Alteration Agreement). 5. Is the project within the Sphere of Influence of any city? No. h:\slides\alpinole.ini (Form Revised 2/97) O CD C13 L-Lj Io -7 ty- U-1 CO- r-D- (p C PROJECT VICINITY FIGURE 2 roc et p on cosu :Benicia at 3 i.d 6 2. 2.5 Clyde 1.9 Martin 7 9 4,2 jjerCUfeS 42 3.6 Pinole ,a 7 + s 12,r k 2 J, 1 3 n. 3 2 Pachtca oncor 6 5 tj S Hill, 2.7 51 2 a Ll G. Cerrito 2 4 1.6 K4, ---------------- Lafayette 1 WaInut'Creek Than 17 1.7 1.5 'A' Y� Beroc village I.2 A 13 2 Orind 3, Rh,, Valley ni , R<< os Do 1--3 ALHAMBRA VALLEY ROAD 1 22 7L+ 11:8 Alamo o"t -}'tea,8 .3 (Pinole Creek) Mer M 1.2 AT CASTRO RANCH RD e 4 1 3. PPiedmont6 D r e an 2A 2. CONTP --,I0ak-l9n -9 2-- ti c—o' EL • p Alameda I's 1.3 10.4 Leandro,. p '47 IiAffEAMA NOT TO SCALE if —A FIGURE 3 PROJECT LIMITS AU t AQ�-i1' ' PL-t, MS 4t7? {� Cep Id W111( Al . NS v. 125P/soi� ,' 1 1l \ MI p iTGN �z2o5ip� / h �LAid N PUBLIC WORKS DEPARTMENT CONTRA COSTA COUNTY DATE: March 25, 1997 TO: James W. Cutler, Assistant Director of Comprehensive Planning FROM: Joseph J. Olsen, Associate Engineer Design Division (Contact Person: Janet Frattini ) SUBJECT: MANDATORY REFERRAL FOR GENERAL PLAN CONFORMANCE We have reviewed the attached project, CP# 97-23, Alhambra Valley Road Storm Damage at Pinole Creek to determine if mandatory referral for General Plan Conformance, as required by Section 65402 of the Government Code, is necessary. I recommend the project needs no further mandatory referral clearance from County staff subject to the following actions: (✓) This project has been determined to be exempt from 65402 review. ( ) This project has been determined to be exempt from 65402 review in accordance with the Board of Supervisors Resolution 81/522 because the project involves a road alignment project of a minor nature. ( ) Community Development staff makes the following attached recommendation which should be incorporated into the staff report on this matter. The project needs mandatory referral and we request Community Development staff to process this project in the following manner: ( ) 65402 review is required. Community Development staff should carry this matter before the appropriate Planning Commission. The map of the project site and description is attached. ( ) 65402 review must be withheld until completion of an Environmental Impact Report on this project. ( ) Other procedures. Approved By: Community Development hAmr4gpc\a1pino1e.gpc (Form Revised 1-8-97) Community Contra Harvey E. BDirector of Community Development Development Costa Department y-� County Administration Building County 651 Pine Street — 4th Floor, North Wing Martinez, California 94553-0095 Phone: 335-1235 April 15, 1997 County File #CP 97-23 Attention: Public Works Department Janet Frattini - Design Division Dear Applicant: The Contra Costa County Community Development Department has completed an initial study of the environmental significance of the project represented by your pending application bearing County File Number CP 97-23, ALHAMBRA VALLEY ROAD STORM DAMAGE AT PINOLE CREEK. In conformance with Contra Costa County Guidelines for implementing the California Environmental Quality Act of 1970 (CEQA), it has been determined that your project will no have a significant effect on the environment. Your project falls within the following category: (x) AN ENVIRONMENTAL IMPACT REPORT (EIR) IS NOT REQUIRED. (✓) The project is categorically exempt (Class 1 c ). ( ) The CEQA requirements are accommodated by the EIR previously prepared for ( ) A statement that an EIR is not required (Negative Declaration of Environmental Significance has been filed by the Community Development Department (unless appealed). ( ) Other: General Rule of Applicability (Section 15061 (b)(3). ( ) AN ENVIRONMENTAL IMPACT REPORT (EIR) IS REQUIRED. ( ) The complexity of your project requires your submission of additional special reports or information (as outlined on the attached sheet) (which will be outlined in a forthcoming letter). ( ) A consultant will be hired to prepare the environmental impact report. This procedure is explained on the attached sheet. Preparation of the EIR cannot be started until the fee and additional information requested is received by the Community Development Department. If you have questions concerning this determination or desire additional information relative to environmental impact report regulations, please call (510) 335-1210. Sincerely yours Harvey E. Bragdon Director of Community Development :gms shl\t