Loading...
HomeMy WebLinkAboutMINUTES - 05201997 - C11 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: MAY 20, 1996 SUBJECT: ACCEPT THE STATUS AND EXPENSE REPORT THROUGH THE SECOND QUARTER OF FISCAL YEAR 1996-97, CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT, SAN RAMON AREA. Specific Request(s)or Recommendations)&Background&Justification I. Recommended Action: ACCEPT the Canyon Lakes Geologic Hazard Abatement District (GHAD) Status and Expense Report for the second quarter of Fiscal Year 1996-97. II. Financial Impact: There is no impact to the County General Fund. III. Reasons for Recommendations and Background: During the second quarter, the District constructed several slope stabilization and drainage devices throughout the Canyon Lakes GHAD. As to the status of the budget, the construction costs through the second quarter of $53,365.00 are approximately 31% of the annual construction budget, and total expenses through this quarter ($104,257.00) are approximately 32% of the total annual budget. IV. Consequences of Negative Action: The quarterly report will not be accepted as required by original formationof HAD. Id Continued on attachment: Yes SIGNATURE: - a RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: a APPROVED AS RECOMMENDED__OTHER VOCE OF SUPERVISORS �/ UNANIMOUS (ABSENT ?77— ) AYES: NOES: ABSENT: ABSTAIN: SE:cs f hereby certify that this Is a true and correct copy of g:\EngSve\SpDist\BO\GHAD 20.11:5 an action ta's: and en•,)red the minutes of the Orig.Div.: PW(Administration-Special Districts) Board of Super✓cors on t�3 ..hewn. Contact: Skip Epperly,(510)313-2253 ATTESTED:* " '? • 9`» cc: Auditor-Controller PHIL BATCHELOR,Cferk of the board Accounting of Supervisors and County Adminlstrator D.Nystrom,Nystrom Engineering CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT CONSTRUCTION COSTS FY '96/'97 - 2nd Quarter Totals Budget Expenses Line Item ('96!'97) (July-Dec.) Slope Stabilization 1. Emergency Response 5,000.00 0.00 2. Corrective Grading 40,000.00 32,470.06 3. Retaining/Pin Walls 30,000.00 0.00 4. Slope Erosion Protection 5,000.00 0.00 5. Revegetation 5,000.00 0.00 6. Monitoring Devices 7,000.00 0.00 Surface Drainage 7. B-58 Construction 5,000.00 0.00 8. B-58 R and M 7,000.00 6,587.05 9. Storm Drain Construction 5,000.00 0.00 10. Storm Drains R and M 5,000.00 0.00 11. Erosion/Runoff Control 5,000.00 3,051.60 12. Riparian Features Rand M 20,000.00 0.00 Subsurface Drainage 13. Subdrain Construction 5,000.00 0.00 14. Subdrains R and M 5,000.00 1,415.06 15. Horiz. Drain Drilling 10,000.00 0.00 16. Horiz. Drains R and M 5,000.00 9,841.65 17. Other Construction Projects 5,000.00 0.00 TOTAL $ 169,000.00 $ 53,365.42 32% CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT 2ND QUARTER FINANCE REPORT FY '96 - '97 July 1-Dec.31,1996 March 21,1997 EXPENSES BUDGET YEAR TO DATE FY 7/96-6197 7/1/96-12/31/96 A. BALANCE OF RESERVE BROUGHT FORWARD $759,000.00 B. PROJECTED INCOME 1. Annual Revenue Via Assessments: $300,000.00 742 Single Family Detatched 469 Townhouses 2,576 Condominiums/Rentals 100,000 Sq.Ft.Commercial 2. Estimated Interest Earnings $30.000.00 TOTAL INCOME $330,000.00 C. PROJECTED EXPENSES 1. Construction Costs a. Repair,Maintenance&Improvements(as per approved $169,000.00 $53,365.42 Repair,Maintenance&Improvement Program) b. Construction Supervision District Staff $34,750.00 $15,877.50 C. District Administration District Staff $4,700.00 $1,275.00 2. Soils and Geotechnical Costs a. District Staff $9,375.00 $1,752.00 b. Outside Consulting $15,000.00 $255.00 3. Civil Engineering Costs $10,000.00 $706.00 4. Groundwater&Settlement Monitoring Programs $20,000.00 $10,612.22 5. Accounting Costs a. District Staff $22,750.00 $11,177.50 6. Legal Costs a. District Staff $8,050.00 $0.00 b. Outside Consulting $10,000.00 $1,341.07 7. Miscellaneous Administrative Costs (HOA,FEMA,PR,etc.) a. District Staff $2,700.00 $0.00 8. County Staff Service Costs $10,000.00 $0.00 9. Assessment District Engineering $10,000-00 $7,895.0 TOTAL EXPENSES $326,325.00 $104,256.71 D. ADDITIONAL CONTRIBUTION TO RESERVE $3.675.00 TOTAL BUDGET $330,000.00 ' DISTRICT STAFF SUMMARY BUDGET EXPENSES General Manager $19,375.00 $9,250.00 District Geologist $18,125.00 $3,419.50 Construction Administrator $30,525.00 $13,892.50 District Coordinator $14,300.00 $3.520.00 $82,325.00 $30,082.00