Loading...
HomeMy WebLinkAboutMINUTES - 05131997 - D6 Contra •: Costa_, TO: BOARD OF SUPERVISORS c; iS ' County FROM: HARVEY E. BRAGDON . 'Py•, ;� DIRECTOR OF COMMUNITY DEVELOPMENT °SrA`couK�•� DATE: April 19, 1997 SUBJECT: MAY 13, 1997 HEARING ON THE SAN RAMON VALLEY REGIONAL PLANNING COMMISSION'S RECOMMENDATION ON THE ALAMO ORCHARDS & OAK TREE PLAZA PROJECT IN THE ALAMO AREA, AND AN APPEAL FILED BY DUNCAN FREW, ET AL, OF THE COMMISSION'S APPROVAL OF A VESTING TENTATIVE MAP APPLICATION, SUBDIVISION 8051 FOR THE SAME PROJECT (File #GP 95-0002, #RZ963045, & DP963030, SD968051) SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS Adopt a motion approving Option A (Approving Project per Planning Commission recommendation) . OPTIONS Option A - Approve Planning Commission Recommendation and Deny Appeal Adopt a motion to: 1. Approve the recommendation of the San Ramon Valley Regional Planning Commission as pertains to an approximate 3: 6 acre site in the Alamo area as follows: a. Adopt the Negative Declaration prepared on this project as adequate for purposes of compliance with the California Environmental Quality Act. b. Approve the General Plan. Amendment (File #GP 95-0002) to delete a Congregate Care designation and replace it with a Single Family Residential - High Density, Commercial, CONTINUED ON ATTACHMENT: X YES SIGNATURE w . RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S) : ACTION OF BOARD ON May 13, 1997 APPROVED AS RECOMMENDED X OTHER X VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A UNANIMOUS (ABSENT TRUE AND CORRECT COPY OF AN AYES: I, III, V & IV NOES: II ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. Contact: Bob Drake (335-1214) Orig: Community Development Department ATTESTED May 13, 1997 cc: Alamo Orchards, LLC PHIL BATCHELOR, CLERK OF Merle Hall Company THE BOARD OF SUPERVISORS Charles & Elsee Lindemann AND COUNTY ADMINISTRATOR Public Works Department Local Agency Formation Commission BY , DEPUTY County Counsel Alamo Orchards & Oak Tree Plaza County File#GP 95-0002, #RZ963045, #DP963030 and Parks and Recreation, and related text changes to Policy 3-138 of the Land Use Element as indicated in Resolution No. 13-1997 . Direct staff to include the approved General Plan Amendment in the next consolidated General Plan Amendment adoption. E C. Approve the rezoning of this site from Single Family Residential, R-20 to Planned Unit District, P-1; and approve a preliminary development plan to allow single family residential, retail commercial and park uses, subject to conditions (File #RZ963045) based on findings contained in Planning Commission Resolution No. 16-1997; waive reading; and set date for adoption. z d. Approve the final development plan allowing up to 16 single family residential units, retail commercial development, and a park site (File #DP963030) based on findings contained in Planning Commission Resolution No. 16-1997 . 2 . Sustain the Planning Commission's approval' of Subdivision 8051 for up to 20 lots (16 single family residential, 3 commercial, and 1 open space) . 3 . Deny the appeal of Duncan Frew, et al. 4. Direct staff to post a Notice of Determination with the County Clerk. Option B - Disapprove the project (Grant the Appeal of Duncan Frew, et al Adopt a motion declaring the Board's intent to: 1. Grant the appeal of Duncan Frew, et al. 2 . Disapprove the proposed General Plan Amendment, rezoning, preliminary and final development plan, and subdivision applications. 3 . Continue the matter to an appropriate date. 4 . Direct staff to prepare appropriate findings for Board adoption consideration. FISCAL IMPACT None. The applicant has paid application fees to process this project and is obligated to pay supplemental fees should staff time and material costs exceed 120% of the initial fee payment. BACKGROUND/REASONS FOR RECOMMENDATIONS The project involves a site that is located at the northern end of the Alamo business district and within a transitional area between commercial uses to the south and west, and single family residential uses to the north and south. Due to the transitional location of the site, appropriate development of the site has been a longstanding concern within the community. The site contains a number of older houses including a Victorian residence from the 1890's which the applicant is required to contribute to it's relocation if a suitable site can be found. Existing General Plan Designation -2- Alamo Orchards & Oak Tree Plaza County File #GP 95-0002 #RZ963045, DP963030 In 1987, a previous developer of the site (Merle Hall Company) had persuaded the County to amend the general plan to redesignate most of the site to the Congregate Care designation. Before providing for the Congregate Care designation, the County had certified as adequate an Environmental Impact Report for a 100 + bedroom congregate care facility on this site. It should be noted that a congregate care facility could not be established on the site until the County approved a P-1 rezoning, preliminary and final development plan applications. Proposed Project More recently, the current applicant has proposed a different land use configuration that retains single family residential use for much of the site. The applicant has actually proposed a project consisting of three different land uses: single family residential, retail commercial; and park use. The single family residential consists of two different product types: three residential lots along Jackson Way in the size range of 8 , 000 - 9 , 150 square feet with single story residences, and 10 other residential lots in the size range of 3 , 895 to 6, 263 with two story residences. The commercial component consists of three attached commercial structures fronting on Danville Boulevard. Finally, the project is proposing to dedicate to the County a pocket park at the corner of Jackson Way and Danville Boulevard. Commission Review This project was considered by the San Ramon Valley Regional Planning Commission at three separate meetings earlier this year. The Commission heard testimony in support and in opposition to the project. However, after concluding the hearing the Commission unanimously voted to support the project. The Commission felt that the proposed uses would provide for compatibility with adjacent uses. Subdivision Review Concurrent and consistent with the review of the other applications, the Commission also approved a subdivision application (Subdivision 8051) for the project with conditions including the requirement that the subdivision approval is contingent on conforming general plan, rezoning, preliminary and final development actions by the Board of Supervisors. Because the Ordinance authorizes the Commission to approve subdivision applications and no appeal was filed on that aspect of the Commission's action, the subdivision decision has become final. Should the Board modify the project in its review of the set of entitlement actions before the Board, then the applicant might be barred from acting on the tentative map until an application to modify the subdivision approval and brought back to hearing to make it consistent with the Board decision. The major points of deliberation by the Commission were as follows: • Reduction from Recommended Widening of Danville Boulevard - The Commission reduced the extent of road widening along the Danville Boulevard frontage from the full widening providing for two north-bound lanes recommended by staff. • Retention of Requirement to Pay Fair-Share Contribution for Possible Traffic Signal - The Commission retained a recommendation by staff to require the applicant to contribute for a possible traffic signal at the corner of Orchard Court/Danville Boulevard/entrance to Alamo Plaza. The determination of whether or not a traffic signal will be -3- Alamo Orchards & Oak Tree Plaza County File #GP 95-0002 #RZ963045, #DP963030 installed at that intersection will be made part of a separate review by the County. If the County determines that there will not be a traffic signal at that intersection, then the applicant's contribution will be returned. • Exceptions Granted to Code Streetlight/Sidewalk Requirements for Residential Frontages - Due to the semi-rural character of this portion of Alamo, the Commission authorized exceptions to code requirements which would normally require streetlight and sidewalk improvements along the proposed residential sections of County-maintained streets (Jackson Way and Orchard Court) . • Requirement to Deed Park Site to the County - For a time, there was a question as to whether the applicant or the County should maintain a 10, 000 square foot park proposed for the corner of Jackson Way and Danville Boulevard. However, the issues were sorted out, and it was agreed by all that the applicant should be required to improve the park and deed it to the County; and that the County would accept maintenance and liability responsibilities for it. • Withdrawal of Take-Out Food Land Use Permit Application - When the applications were initially filed, they included a land use permit application to allow take-out food establishment. This proved to be a concern to some nearby residents. Because the applicant did not have any immediate tenants identified for this type of use, he elected to withdraw that application from the project. In the future, should he change his mind, then he would be free to re-apply, and another noticed public hearing would be held on that application. With the exception of the take-out food land use permit application, all of the above items pertain to the approval of the subdivision project. The land use permit application has been withdrawn. Therefore, none of these matters is before the Board of Supervisors. Annexation Required to Central Sanitary District It should be noted that the site presently lies within the sphere of influence of the Central Contra Costa Sanitary District, but outside the District's service area. Therefore, before any development may occur, the project will have to obtain authorization from the Local Agency Formation Commission to annex into the District. APPEAL OF PROJECT APPROVAL FILED BY NEIGHBORS In a letter dated April 15, 1997 , an appeal of the Planning Commission's project approval was filed by Duncan W. Frew and others with the Community Development Department on Monday, April 21, 1997. The appellants feel that the project is not consistent with the rural character of Alamo. The April 15 appeal letter was followed by a letter dated April 22 , 1997 from Mr. Frew expressing similar concerns about the project. DISCUSSION Mr. Frew and others opposed to the project expressed their concerns to the Planning Commission. Notwithstanding those objections, the Commission felt that the proposed project would provide for a better land use fit than the congregate care facility that is presently designated for this site on the general plan. Mr. Frew resides at one of the residences to the north of the project. It should be noted that recommended restrictions would limit -4- Alamo Orchards & Oak Tree Plaza County File #GP 95-0002 #RZ963045. DP963030 residential development fronting on Jackson Way to single-story design, and require protection of existing mature trees along the frontage of the property. The appeal contains no new information that was not presented to the Commission. Accordingly, staff recommends that the Commission's approval be sustained and that the Frew appeal be denied in accord with Option A actions. Alternatively, if the Board finds merit in the Frew appeal, then the Board could grant the appeal and deny the project. Option B actions could be used to implement such a decision. C: \wpdoc\RZ963045.bo RD\ -5- ADDENDUM TO ITEM D.6 May 13, 1997 Agenda This is the time noticed by the Clerk of the Board of Supervisors for hearing on the recommendation of the San Ramon Valley Regional Planning Commission on the request by Alamo Orchards, LLC (Applicant) and Brent Tucker (Owner) [formerly Merle Hall] and Charles & Elsie Lindemann (Owners), for approval to amend the General Plan Land Use (County File #GP 95-0002) designation; and on a request to rezone from R-20 to Planned Unit (P-1) (County File #RZ 96- 3045); and on a request to approve a Preliminary and Final Development Plan (County File #DP 96-3030); and on a request for a Vesting Tentative map (County File #SD 96-8051); and an appeal by Duncan W. Frew, et al. (Appellants) from the decision of the San Ramon Valley Regional Planning Commission on the Vesting Tentative Map application, Subdivision 8051 for the same project in the Alamo area. Dennis Barry, Community Development Department, and Mitch Avalon, Public Works Department, presented staff reports this matter. The hearing was opened, and the following people presented testimony: Brent Tucker, Owner-Applicant, Tucker Associates, Inc., 2723 Crow Canyon Road, San Ramon; Brian Thiessen, Esq., 3201 Danville Blvd., Ste 295, Alamo; Duncan Frew, Appellant, 3 Garden Estates Court, Alamo; Michael Carroll, 5803 Tehama Avenue, Richmond; Nancy Kaplan, Alamo Parkside Recreation, 184 Canyon Vista, Danville; Sylvia Hema, 1431 Jackson Way, Alamo; Linda Chew, 6 Garden Estates Court, Alamo; Linda Gates, 2440 Tassajara Lane, Danville; David Larkin, 1439 Via Don Jose, Alamo; Lynn Jansen, P.O. Box 417, Diablo; Dale Bridges, 3212 Danville Blvd., Alamo; Michael McHugh, 23 Diamond Drive, Danville; Deborah Poropat, 1386 Danville Blvd., Alamo; John Henderson, 2445 Southview Drive, Alamo; George Westfall, 151 South Jackson, Alamo; Cheryl Locey, 15 Woodhaven, Alamo; David Bloxham, 2 N. Jackson Way, Alamo; Donna Hatfield, 1411 Jackson Way, Alamo; Brad Baer, 99 N. Jackson Way, Alamo; Charles Lindemann, Owner, 25 Orchard Court, Alamo; Eric and Denise Hall, 37 Orchard Court, Alamo; Ronald Poropat, 1386 Danville Blvd., Alamo; Charlotte Maltbie, Alamo Merchants and Professional Association, 3200A Danville Blvd., Alamo; Dennis Harvey, 70 Linda Court, Danville; 1 Continued Addendum, Item D.6 - May 13, 1997 Brent Page, 61 Orchard Court, Alamo; Chuck Schoenberger, 1528 St. Alphonsus Way, Alamo; Joan Wetherell, 81 N. Jackson Way, Alamo; Pat Larkin, 1439 Via Don Jose, Alamo; Andrew Young, 1491 Laurenita Avenue, Alamo; Bruce Kittess, 1600 Cervato Circle, Alamo; Victoria Lipson, 4 Garden Estates, Alamo; Patricia Willy, 900 Ina Drive, Alamo; Julie Millias, 14 Linden Court, Alamo; Brent Tucker, Owner-Applicant, Tucker Associates, Inc., 2723 Crow Canyon Road, San Ramon; Lynn Jansen, P.O. Box 417, Diablo; Brian Thiessen, Esq., 3201 Danville Blvd., Ste 295, Alamo; All persons desiring to speak having been heard, the public hearing was closed and the Board discussed the issues. Supervisor Gerber moved approval of Option A, including the supplemental findings, and further moved that the Conditions of Approval prohibit any on-site dry cleaning business, and that any dry cleaning establishments would be limited to drop-off or pick-up only. Supervisor Gerber also moved that the Conditions of Approval prohibit any restaurant or take-out food business in the development project. Supervisor Rogers seconded the motion. Supervisor Canciamilla noted that he was in agreement with the proposed project, and advised that residents' concerns regarding area traffic issues would be revisited. Supervisor Uilkema stated that she would uphold the County General Plan as it presently stands and would not be supporting the motion. After further discussion, the Board took the following action: IT IS BY THE BOARD ORDERED that the hearing is CLOSED; Option A is APPROVED; the Negative Declaration is ADOPTED as adequate; Resolution No. 97\240, determining to amend the County General Plan (County File #0002-95) is ADOPTED, to be included in the next Consolidated General Plan Amendment; Rezoning application and Preliminary Plan (County File #RZ 3045-96) with the Findings and Conditions (See attached Exhibit I ) are APPROVED; Ordinance 97-14 is INTRODUCED, giving effect to the rezoning, reading is WAIVED, and June 3, 1997, is SET for adoption of same; the Final Development Plan is APPROVED, (County File #DP 3030-96); the approval of Subdivision 8051 is SUSTAINED; the Appeal of Duncan Frew, et al. is DENIED; and staff is DIRECTED to post a Notice of Determination with the County Clerk. 2 r s.. 4D. THE BOARD OFSUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on May 13. 19 7 by the following vote: AYES: Supervisors Rogers, Gerber, DeSaulnier, Canciamilla NOES: Supervisor Uilkema ABSENT: None ABSTAIN: None RESOLUTION NO. 97/240 SUBJECT: In the Matter of the Tucker [Alamo Orchard]) General Plan Amendment ) County File #GP95-0002 ) The Board of Supervisors of Contra Costa County RESOLVES that: There is filed with this Board and its Clerk a copy of Resolution No. 13-1997 adopted by the San Ramon Valley Regional Planning Commission which discusses the Tucker (Alamo Orchard) General Plan Amendment (County File #GP95-0002). On Tuesday, May 13, 1997, the Board held a public hearing on said General Plan Amendment discussed by the San Ramon Valley Regional Planning Commission, Resolution No. 13-1997. Notice of said hearing was duly given in the matter required by law. The Board at the hearing, called for testimony of all persons interested in this matter. Numerous speakers testified both for and against the project. The Board closed the public hearing and APPROVED the General Plan Amendment and directed staff to include the Tucker (Alamo Orchard) General Plan Amendment into one of the consolidated General Plan Amendments for 1997 as allowed by State Planning Law. Contact: Jim Cutler (510) 335-1236 1 WSW eergty that tlds b a true and correctof tCf an 006" taken and entered on the minutes he Board of Supervisors on the date shown. AMS M._Mav 13 , 1997 cc: Community Development Department (CDD) PHIL BATCHELOFV Clerk of the board Public Works Department OfSupervisore rVntyAdminlstrator CAO By Deputy County Counsel j Aaw\alamogpa.res RESOLUTION 97/240 Tucker Associates Inc. General Plan Amendment Contra Costa County File#GP-950002 Map 1 SL SL WIGDDNA ' SH ilio PR CO, � '� i i 11 c Ii oF CO % CO 1 /i q. 1 PS III I I t1 I I NZ 41 SL CO � � 1 co 1" ML=300" I r I I LEGEND SL Single Family Residential-Low Density SH Single Family Residential-High Density ML Multiple Family Residential-Low Density CO Commercial OF Office PS Public/Semi-Public PR Parks and Recreation Amendment Area I hereby certify that this amendment to the I hereby certify that this amendment to the Contra Costa County General Plan was ap- Contra Costa County General Plan was adopted proved by the Board of Supervisors on by the Board of Supervisors on May 13, 1997. May 13, 1997. /f Phil Batchelor, Clerk of the Board of Supervi- "� -� sorsand County 'nistrator Harvey E. Bragdon Director of Community Development By: Deputy FINDINGS AND CONDITIONS OF APPROVAL FOR REZONING AND PRELIMINARY DEVELOPMENT PLAN APPROVAL FOR FILE #RZ963045 (Alamo Orchards & Oak Tree Plaza) (Alamo Orchards, LLC - Applicant; Merle Hall Company and Charles & Elsie Lindemann - Owners) Per May 13, 1997 Board of Supervisors Approval FINDINGS A. Rezoning Findings 1. The change proposed will substantially comply with the general plan. 2. The uses authorized or proposed in the land use district are compatible within the district and to uses authorized in adjacent districts. 3. Community need has been demonstrated for the use proposed, but this does not require demonstration of future financial success. (Reference §26-2.1806 of the Ordinance Code) B. Planned Unit District Findings 1. The applicant intends to start construction within two and one-half years from the effective date of the zoning change and plan approval; 2. The proposed planned unit development is consistent with the county general plan; 3. In the case of residential development, it will constitute a residential environment of sustained desirability and stability, and will be in harmony with the character of the surrounding neighborhood and community, 4. In the case of commercial development, it is needed at the proposed location to provide adequate commercial facilities of the type proposed, and that traffic congestions will not likely be created by the proposed center, or will be obviated by presently projected improvemetns and by demonstrable provisions in the plan for proper entrances and exits, and by internal provisions for traffic and parking, and that the development will be an attractive and efficient center which will fit harmoniously into and will have no adverse effects upon the adjacent or surrounding development; Prohibited Uses -Prohibited uses within the project include: Rezoning and Preliminary Development Plan File#RZ963045 Alamo Orchards&Oak Tree Plaza a. Commercial uses with criteria under conventional zoning restrictions (e.g., within 500 feet of residential and park uses)which this site cannot meet, or otherwise determined inappropriate for a site in proximity to residential and park uses. b. Uses that may be normally allowable within commercial areas, but due to limitations associated with the approved project design should not even be considered for this site. 5. The development of a harmonious integrated plan justifies exceptions from the normal application of this code. (Ref. §84-66.1406 of the County Code) C. Growth Management Element Performance Standards Findings 1. Traffic - The proposed development will not result in an increase of 100 or more peak period trips as documented in a traffic study dated December 20, 1996 by TJKM Traffic Consultants, therefore the applicant is not required to prepare a traffic report pursuant to the 1988 Measure C requirements. On the other hand, the commercial and residential development within the project will both be required to contribute fees to the County for local (Alamo Area of Benefit) and for regional (Southern Contra Costa) transportation improvements in accord with ordinance requirements prior to finalization of the building permit. 2. Water- The East Bay Municipal Utility District has indicated that the site lies within the District's service area and that the District is capable of serving the project. 3. Sanitary Sewer- The site lies within the sphere of influence of the Central Contra Costa Sanitary District but outside the District's service area. Annexation of the site to the District will be required before construction may commence. The District has conducted a limited analysis for the sewer system located downstream of the proposed project. The existing main sewer is adequate for the additional wastewater which will be generated by this project, but District facilities farther downstream do not have adquate flow carrying capacity under the District's current design criteria for ultimate conditions. Improvements to correct the decificiencies are in the District's Capital Improvement Plan. Improvements to the District's existing facilities that are requried as a result of new development will be funded from applicable District fees and charges. The developer will be required to pay these fees and charges at the time of connection to the sewer system. RZ-2 Rezoning&Preliminary Development Plan Approval File#DP963045 Alamo Orchards&Oak Tree Plaza 4. Fire Protection - The site lies within one mile of the San Ramon Valley Fire Protection District Station at #1101 Stone Valley Road. 5. Public Protection - The Growth Management Element standard is 155 square feet of Sheriff facility station area per 1,000 population. The project will generate a population of approximately fifty(3 persons per household X 16 units), which is far below the standard of the Growth Management Element standard. The Sheriff s Office had no comments on this application. 6. Parks and Recreation - The applicant is proposing a public open space park site of 10,000 square feet. The applicant would also be required to make landscape and irrigation improvements to the park. Because of the dedication, the applicant will have no obligation for payment of in-lieu park dedication fees. 7. Flood Control and Drainage - This project will be required to collect and convey all runoff to an adequate natural or manmade drainage facility. To reduce the impact of additional storm water run-off from this development on San Ramon Creek, one cubic yard of channel excavation material will be removed from an inadequate portion of San Ramon Creek for each 50 square feet of new impervious surface area created by the development, or the applicant will have to contribute an in-lieu fee for such purpose. No portion of this site lies within an area subject to a 100-year floodplain hazard as indicated on the Federal Emergency Management Agency map. (Ref. the Growth Management Element, Chapter 4, of the General Plan) D. Variance Findings for Application of the Planned Unit (P-1) District Zoning to a Property less than 15 acres in size. 1. The variance authorized does not constitute a grant of special privilege inconsistent with the limitations on other properties in the vicinity and the respective land use district in which the subject property is located. 2. That because of special circumstances applicable to the subject property because of its size, shape, topography, location or surroundings, the strict application of the respective zoning regulations is found to deprive the subject property of rights enjoyed by other properties in the vicinity and within the identical land use district. 3. The variance authorized substantially meets the intent and purpose of the respective land use district in which the subject property is located. RZ-3 Rezoning and Preliminary Development Plan File#RZ963045 Alamo Orchards&Oak Tree Plaza (Reference §26-2.2006 of the Ordinance Code) RZ-4 Rezoning&Preliminary Development Plan Approval File#DP963045 Alamo Orchards&Oak Tree Plaza CONDITIONS OF APPROVAL 1. Allowed Land Use - Development and land use shall be as generally depicted on the Vesting Tentative Map application dated 10/6/95 as modified by a revised site plan dated 1/29/97 prepared by George Swallow and Associates. Retail business and professional office uses shall be allowed in the area shown for commercial development. Single family residential use shall be allowed in the area of the proposed single family residential lots. Open space/recreation shall be allowed in the area shown for open space use at the comer of Jackson Way and Danville Boulevard. Prohibited Land Uses - The following land uses shall be prohibited within any portion of the project: churches, hospitals, hotels, motels, convalescent homes, adult entertainment business, sale of firearms, cabaret and retail liquor stores. Residential Lots Fronting on Jackson Way - Sizes for residential lots (after deducting for right-of-way dedication) shall be a minimum of 7500 square feet in area. Residential Lots Frontingon n Proposed Private (Orchard Lane) Road - A maximum of 13 residential lots shall be allowed. Sizes for residential lots fronting on the proposed private road (Orchard Lane) shall be a minimum of 4,950 square feet (inclusive of road right-of-way area). 2. Approval of Variance to Minimum Area for Applying P-1 Zoning - A variance is approved to allow the application of the Planned Unit (P-1) District zoning to this property totalling 3.6 acres. 3. Specified Date for Determining ompliance with Policies, Ordinances and Fees - Development authorized under this rezoning and preliminary development plan shall be in substantial compliance with the ordinances (including any applicable fees) and policies in effect as of the date that the proposed rezoning becomes effective. 4. Credit for Fees Charged on a Per Residence Basis - The applicant shall be given credit for fees assessed on a per residence basis (traffic, park dedication, etc.) for RZ-5 Rezoning and Preliminary Development Plan File#RZ963045 Alamo Orchards&Oak Tree Plaza the six residences that existed at the site at time of rezoning application submittal or at time of commencement of processing development applications at this site. 5. Phasing of Development - Prior to issuance of a certificate of occupancy on any of the commercial structures on Lots 17 - 19, a certificate of occupancy for a residence shall have been issued on at least one each of the two sets of lots listed below: Lots 1 - 13 (Orchard Court/Lane); and Lots 14 - 16 (Jackson Way). j:\groups\cdadpool\bob\rz963045.coa RD\ rev.5-14/97-rd RZ-6 FINDINGS AND CONDITIONS OF APPROVAL FOR VESTING TENTATIVE MAP SUBDIVISION 8051, ALAMO ORCHARDS & OAK TREE PLAZA (County File #SD968051) (Alamo Orchard, LLC - Applicant; Merle Hall Company and Lindemann - Owners) per Board of Supervisors May 13, 1997 Approval FINDINGS The proposed subdivision, together with the provisions for its design and improvement, is consistent with the applicable general plan required by law. (Ref. §94-2.806 of the Ordinance Code) CONDITIONS OF APPROVAL General 1. Approved Development Exhibits This approval is generally based on the following exhibits received by the Community Development Department listed as follows: A. Vesting Tentative Map dated 10/5/96, Exhibits I -III. B. Alamo Orchards& Oak Tree Plaza Final Development Plan dated 9/20/96. C. As modified by a revised site plan prepared by George Swallow& Associates dated 1/29/97 entitled "Scheme B", Compromise Proposal to Public Works; except as further modified by the below listed conditions in this permit. D. A Traffic Study of the Proposed Alamo Orchards and Oak Tree Plaza Development, dated 12/20/96, prepared by TJKM Transportation Consultants. E. Tree Report, Oak Plaza/Alamo Orchards, dated June 1996, prepared by Hortscience, Inc., (James R. Clark, Certified Arborist). 2. Subdivision Size and Composition- This approval allows for a maximum of 19 lots and an open space lot. Sixteen lots shall be for single family residential purposes; three lots shall be for retail shopping. Alamo Orchards&Oak Tree Plaza Subdivision 8051 3. Contingent Approval - Approval of this vesting tentative map is contingent on adoption of conforming general plan, rezoning/preliminary development plan and final development plan actions by the Board of Supervisors. 4. Indemnification of Count by Applicant -Pursuant to Government Code Section 66474.9, the applicant (including the subdivider or any agent thereof) shall defend, indemnify, and hold harmless the Contra Cosa County Planning Agency and its agents, officers, and employees from any claim, action, or proceeding against the Agency (the County) or its agents, officers, or employees to attack, set aside, void, or annul, the Agency's approval concerning this subdivision map application, which action is brought within the time period provided for in Section 66499.37. The County will promptly notify the subdivider of any such claim, action, or proceeding and cooperate fully in the defense. Conditions to be Satisfied Prior to Filing a Final Map or Issuance of Grading or Building Permits 5. Geotechnical Report - At least 45 days prior to issuance of a grading permit, or installation of improvements or utilities, applicant shall submit two copies of a preliminary geology, soil, and foundation report meeting the requirements of Subdivision Ordinance Section 94-4.420 prepared and signed by a registered soil engineer and engineering geologist for review and approval of the Zoning Administrator following opportunity for comment by the Planning Geologist. Improvement, grading, and building plans shall carry out the recommendations of the approved report. This report shall include evaluation of the potential for liquefaction, seismic settlement and other types of seismically-induced ground failure by recognized methods appropriate to soil conditions discovered during subsurface investigation. 6. Urban Service Bounda ,yry Reorganization/Annexation to Central Sanitary District -Prior to filing a Final Map, evidence shall be sumitted to the Community Development Department that an urban service boundary reorganization has been consummated with the Local Agency Formation Commission. The reorganization shall minimally provide for annexation of the site to the Central Contra Costa Sanitary District. 7. Submittal of Revised Site Plan for the ShoppingCenter- The applicant shall submit two copies of a revised site plan of the shopping center for the review and approval of the Zoning Administrator. The primary objective of the review shall be to providefor compliance with the minimum 4-foot on-site frontage planter requirement of the Off- Street Parking Ordinance while maintaining other design standards incorporated into plans provided to-date. The revised plan shall provide for the following: SUB-2 Conditions to be Satisfied Prior to Filing a Final Map or Issuance of Grading or Building Permits A. Identify Required Road Dedication and Improvements - Identification of the required Danville Boulevard and Orchard Court right-of-way dedication and frontage improvements. B. Elimination of Variance to On-Site Frontage Planter Requirement - The revised site plan shall provide for a minimum 4-foot wide on-site planter area along the frontages of Danville Boulevard and Orchard Court. No portion of the required planter area shall be used for parking overhang area. C. Compliance with Off-Street Parking Ordinance Standards - The revised plan shall comply with the standards of the Off-Street Parking Ordinance except those variances specifically listed in the Final Development Plan Permit. D. Retention of Existing;Design Elements -In other respects, the revised site plan shall generally conform with the 1/29/97 site plan. Existing design elements shall be retained including maintenance of minimum structure setback from residential lots and maintenance of width of the proposed esplanade. Outdoor seating area shall be separated from(Residential)Lot 16. The tree proposed to be retained, shall be preserved. It is the expectation that satisfaction of the above changes may have to be accomplished by reduction in the floor area of the proposed commercial structures. E. Refuse Disposal - The revised site plan shall provide for a refuse storage area(s) that are placed within the footprint of the building and be enclosed and roofed over, while accommodating requirements to ventilate. The enclosures shall be designed to conform to the exterior of the building. F. Cross-Easements for Common Facilities - The site plan shall provide for mutual cross-easements for common facilities including but not limited to access, parking, refuse disposal. These easements shall be reflected on the final map. Alternatively, if the applicant provides staff with a letter indicating that they intend to develop the commercial lots as one lot, not three, then the requirement for cross-easements shall be waived. G. Bicycle Rack- The revised plan shall provide for a bicycle rack. 8. Submittal of a Final Landscape/Hardscape Plan for Shopping Center/Open Space Area- Following approval by the Zoning Administrator of a revised site plan for the Shopping Center per COA#7, the applicant shall submit four copies of a final landscape/irrigation, development and hardscape plan of the shopping center and open space area (Lot A) SUB-3 Alamo Orchards&Oak Tree Plaza Subdivision 8051 prepared by a landscape architect for the review and approval of the Zoning Administrator. Upon submittal, a set of plans shall be referred to the Special Districts Coordinator of the Public Works Department for opportunity to review and comment. The plan shall provide for the following: A. Minimum Plant Sizes - All proposed trees shall be a minimum of 15-gallons in size; all shrubs shall be a minimum of 5-gallons in size. B. Compliance with Water Conservation and Sight Obstruction Ordinance Requirements - The plan shall contain sufficient information to demonstrate compliance with the reporting requirements and standards of the Water Conservation Landscaping in New Developments Ordinance (Chapter 82-26) and Sight Obstructions at Intersections Ordinance (Chapter 82-18). The latter ordinance applies to intersections with public roads. The Landscape Architect shall certify on the face of the plan compliance with standards and reporting requirements of the Water Conservation ordinance. C. Masonry Wall - The plan shall provide for a masonry wall or tilt-up concrete wall along the common boundary with the residential lots, but for placement inside the commercial and open space properties. Minimally, the section of the wall adjoining the east side of Lot A shall provide for a decorative design. Cross- sections of the proposed wall shall be provided with design specifications. D. Consideration of Other Park Amenities -Development of the park site shall include consideration of benches, tables, fountains and other amenities typically found in passive parks. E. Plant Improvements within County Right-of--Way - The proposed plan shall also provide for landscape improvements along the undeveloped frontage area within the County right-of-way. F. Prior Review by Local Community Groups of Lot A Component -Prior to submittal to the Zoning Administrator, the applicant shall provide evidence that the following local community groups have had an opportunity to review and comment on the proposed landscape plans for Lot A: Alamo Improvement Association, County Service Area R7-A(Alamo Parks and Recreation Committee), and the Association for the Preservation of Danville Boulevard. 9. Disposition of Existing Older Victorian Residence Mumbur House) - The applicant shall fully cooperate in the moving of the older existing Victorian residence (Humburg House) from the site to another location. SUB-4 Conditions to be Satisfied Prior to Filing a Final Map or Issuance of Grading or Building Permits A. The applicant's responsibility shall extend six months from the date of approval of this permit, and the applicant shall be required to provide evidence for the review and approval of the Zoning Administrator that the applicant has contributed 25% of the cost (but not to exceed $6000). B. This obligation of the applicant shall be null and void if any of the following are not evidenced in a form that satisfies the Zoning Administrator within the six- month period: 1) A relocation site is made available by a third party(ies), 2) The balance of funding of the relocation costs is demonstrated from a third party(ies). C. Until the six-month period expires, the applicant shall diligently attempt to avoid any significant damage to the house. 10. Open Space/Pocket Park(Lot A) -Dedication of Land and Voidance of Any In-Lieu Fee Obli ag tion- The following shall be submitted for the review and approval of the Zoning Administrator. The applicant shall grant deed to the County the proposed park(Lot A) at time of filing of the first final map. The applicant shall submit a formal request to the Special Districts Coordinator of the Public Works Department (313-2253) for the County Service Area R-7A to maintain the facilities. Pursuant to Article 920-6 of the County Code, the dedication of land fulfils the project's park dedication requirement and the applicant shall have no obligation to pay an in-lieu park fee. Tree Protection 11. Tree Protection and Project Improvement Plans -No trees shall be removed or otherwise altered except as authorized by this approval. The applicant shall retain the services of a consulting arborist for all stages of development of this project. Any plan affecting trees shall be reviewed by a Consulting Arborist with regard to tree impacts. These include, but are not limited to, improvement plans, utility and drainage plans, grading plans, landscape and irrigation plans, and demolition plans. These plans shall include the following information: A. Identification of information on Existing Trees on Project Plano - The location, species, tree dripline, and trunk circumference of all trees identified in the Hortscience Tree Report whose tree trunks lie within 15 m (50 feet) of proposed SUB-5 Alamo Orchards&Oak Tree Plaza Subdivision 8051 grading or other proposed improvements or development activity (e.g., stockpiling of construction materials, fill, etc.), and the corresponding tree number code assigned by the Hortscience Tree Report. All affected plans shall plot the vertical and horizontal elevations of all trees to be preserved for the project. The site plan shall also specifically indicate whether individual trees are proposed to be (1) removed, (2) altered or (3)preserved without alteration. B. Review of Project Plans by Consulting Arborist - Evidence shall be submitted to the responsible County agency that any plan affecting trees has been reviewed by the Consulting Arborist with regard to tree impacts. Tree Preservation Notes shall be included on all plans. C. Determination of Tree Preservation Zones - Following location of tree trunks and development of the final site plan, the applicant shall provide evidence to the Zoning Administrator that the consulting arborist has identified a Tree Protection Zone for trees to be preserved in which no soil disturbance is permitted. As a general guideline, the Tree Protection Zone shall be defined by the dripline or a circle with a radius of 10 feet from the tree trunk (whichever is greater). D. No underground services including utilities, sub-drains, water or sewer shall be placed in the Tree Protection Zone. E. Any herbicides placed under paving materials must be safe for use around trees and labeled for that use. F. The entry drive into Lot 7 shall be designed to minimize disturbance near trees #846 and #847. Design shall avoid excavation for sub-base by placing on existing grade and raising the driveway in the area around the trees. 12. Preconstruction Tree Protection Treatments -Perform the recommended pre-construction measures in accord with the recommendations on pages 10-11 of the Hortscience Report. Upon completion of these measures, the consulting arborist shall notify the Zoning Administrator in writing that the measures have been completed. 13. Comprehensive Management Plan for Impacted Trees - The applicant shall provide for a comprehensive management plan for impacted trees prepared by the consulting arborist 'An alteration to a protected tree involves any proposed trenching,grading,filling,paving,structural development or change in ground elevation within the dripline of a tree. SUB-6 Conditions to be Satisfied Prior to Filing a Final Map for the review and approval of the Zoning Administrator. The plan shall follow the recommendations contained on Pages 11 & 12 of the Hortscience report. Conditions to be Satisfied Prior to Filing a Final Map 14. Submittal of Alternative Street Names - At least 30 days prior to filing the Final Map, proposed street names for the proposed private road shall be submitted for review by the Community Development Department, Graphics Section(Phone#335-1270). Alternate street names should be submitted. The Final Map cannot be certified by the Community Development Department without the approved street names. 11 15. Police Service District/Crime Prevention - The owner of the property shall participate in the provision of funding to maintain and augment police services by voting to approve a special tax for the parcels created by this subdivision approval. The tax shall be the per parcel annual amount (with appropriate future CPI adjustment)then established at the time of voting by the Board of Supervisors. The election to provide for the tax shall be completed prior to the filing of the Final Map. The property owner shall be responsible for paying the cost of holding the election, payable at the time that the election is requested by the owner. 16. Disclosure Statement About Availability of Geotechnical Report - Applicant shall submit two copies a proposed statement intended to be recorded to run with the deeds to property for the review and approval of the Zoning Administrator. The proposed statement shall acknowledge the approved geotechnical report by title, author(firm), and date, calling attention to approved recommendations, and noting that the report is available from the seller. The approved statement shall be recorded to run with the deeds to property with the recording of the final map. 17. School Disclosure Statement -Prior to filing a final map, the applicant shall submit a draft disclosure statement for the review and approval of the Zoning Administrator. The notice shall indicate that the nearby elementary and middle school is at or near capacity and that elementary and middle school children in the Alamo Orchards project may be required to enroll in a school outside the neighborhood. A copy of the approved notice shall be provided to prospective buyers. The Zoning Administrator may waive or modify this requirement based on information from the San Ramon Valley Unified School District that the Rancho Romero Elementary School and/or Stone Valley Middle School has adequate capacity to accommodate students generated from this project. 18. Sound Attenuation Report - The applicant shall submit two copies of a report prepared by a qualified acoustic engineer documenting (ultimate) noise conditions affecting the site from projected traffic on Interstate 680 and Danville Boulevard for the review and SUB-7 Alamo Orchards&Oak Tree Plaza Subdivision 8051 approval of the Zoning Administrator following an opportunity for comment by a structural engineer of the Building Inspection Department. (Projected traffic levels may be obtained from the Community Development Department, Transportation Planning Division(335-1241). The report shall make recommendations to provide that new residences and commercial structures shall be designed to comply with the Sound Transmission Control Standards of the Uniform Building Code for the State of Californial989, as amended to date. The report shall provide recommendations to assure that interior noise levels do not exceed a Community Noise Equivalent Level (CNEL) of 45 DNL. The recommendations of the approved report shall be integrated into the design of the habitable structures. 19. Provide Copies of Final Map to the Community Development Department -Prior to seeking authorization of Final Map approval from the Community Development Director or authorized deputy, the applicant shall submit two prints of the proposed final map to the Community Development Department. 20. Payment of Any Due Supplemental Application Processing Fees - This application was subject to an initial application fee of$14, 469 (includes rezoning, development plan, subdivision and land use permit application fees, but not general plan fee)which was paid with the application submittal, plus time and material costs if the application review expenses exceed 120% of the initial fee. The initial fee encompassed fees for related applications including rezoning, and final development plan. Any additional fee due must be paid within 60 days of the permit effective date or prior to filing a final map, whichever occurs first. The fees include costs through permit issuance plus five working days for file preparation. The applicant may obtain current costs by contacting the project planner. If the applicant owes additional fees, a bill will be sent to the applicant shortly after permit issuance. 21. Review of Rear and Side Building Elevations for Orchard Lane Residences - The applicant shall submit two copies of proposed building elevations for the sides and rear of proposed residences on Lots 1- 13 (Orchard Lane/Court) for the review and approval of the Zoning Administrator. These elevations shall provide for similar materials, detailing and massing variety as are shown on the front elevations. The approved elevations shall be made a requirement of residential design at time of issuance of building permits. 22. Fencing Plan for Residential Lots - The applicant shall submit a fencing plan for the side and rear property lines of proposed residential lots for the review and approval of the Zoning Administrator. The plans shall be accompanied by a section of the proposed fencing with design specifications. The approved fencing shall be incorporated into the construction plans for each residence and installed prior to occupancy of the respective residence. The approved fence plan shall become a requirement of the Final Development SUB-8 Conditions to be Satisfied Prior to Filing a Final Map Plan. Fencing that is exposed to public view shall be of a substantial and decorative design. 23. Orchard Court Residential Area Monument Signage - The proposed monument signs at the Orchard Court entrance to the proposed residential area within the public right-of-way shall not be allowed unless specifically authorized by the Public Works Department following application for encroachment permit. Energy Conservation and Provision for Electric Vehicles 24. Prior to filing a final map, the applicant shall provide evidence for the review and approval of the Zoning Administrator that the following standards will be satisfied: A. Florescent Light Fixtures - Include fluorescent fixtures. In addition to the requirements for fluorescent lighting in kitchens and bath as prescribed by the Energy Standards, all fixed lighting in non-living space (i.e., closets, garages, utility rooms, or storerooms) shall accept fluorescent bulbs. This use would not be included in the Title 24 compliance package for the home; it would be included as an additional conservation measure. All homes should initially be outfitted with fluorescent bulbs where appropriate. This shall be a condition of final map approval and verified before issuance of the occupancy permit. B. Energy Conservation - The developer(s) shall comply with the California Energy Commission energy budget limits by utilizing the most current CEC prescriptive packages available. The developer(s)will indicate what package (or performance standard) they are utilizing during the Building Department plan checking process. C. Energy Conservation Brochures for Homeowners -Provide all new homeowners with a copy of Home Energy Manual (California Energy Commission 1992a), as currently required by the Energy Standards. The manual provides useful information to homeowners on a wide variety of energy-conserving features, designs, appliances, and practices. This pamphlet should be provided in the home as any other home/appliance warranty documentation. Compliance should be verified by the County before issuance of an occupancy permit. D. Separate Electrical Circuit for Charging Electrical Vehicles - The developers shall provide, within the garage area of all new homes, a separate electrical circuit for charging of electrical-powered vehicles. Public Works Conditions SUB-9 Alamo Orchards&Oak Tree Plaza Subdivision 8051 General: 25. Improvement plans prepared by a registered civil engineer shall be submitted to the Public Works Department, Engineering Services Division, along with review and inspection fees, and security for all improvements required by the Ordinance Code or the conditions of approval for this project. Road Improvements (Frontage): General 26. A sketch plan shall be submitted for review to the Public Works Department, Engineer- ing Services Division, showing all required frontage improvements along Danville Boulevard, Orchard Court and Jackson Way prior to starting work on the improvement plans. The sketch alignment plan shall be to scale and show on/off-site transitions, as necessary, curb lines, lane striping details, cross-sections and trees proposed to be preserved. The sketch plan shall extend a minimum of 30.0 meters (100-feet±) beyond the limits of the proposed work. The sketch alignment plan shall also include adequate information to show that adequate sight distance has been provided. The design speed for Danville Boulevard shall be 80.5 km/h (50-mph±). The design speed for Orchard Court and Jackson Way shall be 48.0 km/h (30-mph±). 27. Applicant shall provide standard driveway depressions at the driveways serving the commercial site. The driveways shall be 3.0 meters (10-feet±) in depth (as measured from the face of curb) and a minimum of 8.5 meters (28-feet±) in width. 28. Applicant shall install safety related improvements including intersection controls (excluding the proposed signal at the intersection of Danville Boulevard/Orchard Court), traffic signs and striping, as necessary, subject to the review and approval of the Public Works Department, Transportation Engineering Division. Danville Boulevard 29. Applicant shall construct curb, 1.5 meter (5-foot ±) separated (at least 2-feet from the curb) sidewalk (width measured from curb face), necessary longitudinal and transverse drainage, street lighting, border landscaping and irrigation, and pavement widening along the frontage of Danville Boulevard. 30. Applicant shall narrow the Danville Boulevard roadway at the north side of Orchard Court to one northbound lane and an 8-foot shoulder, with face of curb constructed SUB-10 Public Works Conditions of Approval 19.5 meters (64-foot ±) from the face of curb on the west side of Danville Boulevard. The additional peninsula area will be landscaped by the applicant. Construct a right turn lane into the commercial driveway with face of curb located 22.3 meters (73-feet ±) from the face of curb on the west side of Danville Bouevard. Narrow the Danville Bouelvard roadway to a 18.9 meter (62-foot ±) width between the commercial driveway and Jackson Way. A transition shall be provided from the north side of the driveway entrance to the curb north of the driveway, subject to the review of Public Works. 31. Applicant shall construct a 6.1 meter (20-foot±) radius curb return at the southeast corner of the Danville Boulevard/Jackson Way intersection and at the northeast corner of the Danville Boulevard/Orchard Court intersection. Orchard Court 32. Applicant shall construct curb, 1.5 meter (5-foot±) sidewalk (width.measured from curb face), necessary longitudinal and transverse drainage, street lighting, border landscaping and irrigation along the frontage of Lot 19, pavement widening and necessary off-site transitions along the frontage of Orchard Court. Sidewalk shall be constructed along the commercial frontage on the north side of Orchard Court. 33. Applicant shall construct the face of curb on the north side of Orchard Court, between Danville Boulevard and the easterly end of lot 19, 11.0 meters (36-feet±) from the existing curb on the south side of Orchard Court. On the south side, the curb along the frontage of lots 11-13 shall be constructed 3.0 meters (10-feet±) from the ultimate right of way line. If the existing curb on the south side of Orchard Court immediately west of the project is located less than 3.0 meters (10-feet±) from the ultimate right of way line, the new curb along the frontage of Lots 11-13 shall be located along a line that is consistent with the existing curb line to the west. Between the easterly end of lot 19 and the end of the project frontage on the north side of Orchard Court, the curb shall be constructed 9.8 meters (32-feet±) from the newly extended curb line along the south side. A transition shall be provided along the north side curb from the easterly end of lot 19 to the westerly curb return at Orchard Lane, subject to the review of Public Works. Jackson Way 34. Applicant shall construct curb, 1.5 meter (5-foot±) sidewalk (width measured from curb face), necessary longitudinal and transverse drainage, street lighting, pavement widening and necessary off-site transitions along the frontage of Jackson Way. The sidewalk design may be a combination of monolithic and separated sidewalk or an SUB-11 Alamo Orchards&Oak Tree Plaza Subdivision 8051 entirely separated sidewalk to account for the existing trees that are to remain in Lot A and along the frontages of Lots 14-16. The Jackson Way sidewalk shall meander. No sidewalk or streetlights shall be required along the residential frontage of this property. 35. The garage doors for each of the Jackson Way residences shall be located at least 20- feet from the face of curb or the back of sidewalk whichever is greater, at the driveways. The garage doors shall be equipped with vertical rise garage door openers. At time of review of improvement plans, the applicant shall provide evidence to the Public Works Department and for the review and approval of the Zoning Administrator in the Community Development Department demonstrating how this setback standard can be met. Improvement plans shall be accompanied by residential site plans conforming to the plans in the Final Development Plan. 36. Applicant shall construct the face of curb 9.8 meters (32-feet±) from the existing curb on the north side of Jackson Way from the end of the curb return at Danville Boulevard, east approximately 15.2 meters (50-feet±). The curb shall then transition to a width of 8.5 meters (28-feet±), as measured from the existing curb on the north side, in the vicinity of the existing oak tree, which is proposed to be saved, located approximately 33.5 meters (110-feet±) from the end of the curb return at Danville Boulevard. The 8.5 meters (28-feet±) width, as measured from the existing curb on the north side, shall be maintained for the remainder of the project frontage. The transition shall be subject to the review of Public Works. Specific Off-Site Road Improvements: 37. Applicant shall contribute $27,500, or provide other security acceptable to the Public Works Department, to a Road Improvement Fee Trust (Fund No. 819200-0800) designated for road improvements and signal construction at the intersection of Danville Boulevard/Orchard Court. If the signal is not constructed within 5 years of the issuance of occupancy of the commercial property, the contribution made to the Road Improvement Trust shall be returned to the applicant. Access to Adjoining Property: Proof of Access/Acquisition 38. Applicant shall furnish necessary rights of way, rights of entry, permits and/or easements for the construction of off-site, temporary or permanent, public and private road and drainage improvements. SUB-12 Public Works Conditions of Approval 39. Applicant shall furnish proof to Public Works that legal access to the property is available from Danville Boulevard, Orchard Court and Jackson Way. Site Access 40. Driveway access to lots 17-19 (commercial site) shall be subject to the review of Public Works and the review and approval of the Zoning Administrator. Private Road (Orchard Lane): 41. Applicant shall construct Orchard Lane to County private road standards with a 9.8 meter (32-foot±) paved width and curb within an 11.0 meter (36-foot±) easement. 42. Applicant shall construct a street-type connection at Orchard Court with 6.1 meter (20- foot±) radius curb returns. 43. Applicant shall construct a paved turnaround at the end of the proposed private road. Road Dedications: 44. Applicant shall convey to the County, by Offer of Dedication, the right of way necessary for the ultimate width of 27.7 meters (91-feet±), from Orchard Court to the northern end of the Danville Boulevard driveway entrance, transitioning northward to a width of 24.7 meters (81-feet±), along the remainder of the frontage of Danville Boulevard up to Jackson Way. 45. Applicant shall convey to the County, by Offer of Dedication, the right of way necessary for the ultimate width of 16.5 meters (54-feet±) along the Orchard Court frontage of lot 19. 46. Applicant shall convey to the County, by Offer of Dedication, the right of way necessary for the ultimate width of 15.9 meters (52-feet±) along the Orchard Court frontages of lots 1, 10, and 11-13. 47. Applicant shall convey to the County, by Offer of Dedication, the right of way necessary to establish the ultimate right of way line on the south side of Jackson Way 0.3 meters (1-foot±) behind the face of curb along the south side of Jackson Way. Public Utility/Sidewalk Easement: SUB-13 Alamo Orchards&Oak Tree Plaza Subdivision 8051 48. Applicant shall provide a 2.7 meter (9-foot±) public utility easement behind the right of way line along the entire frontage of Jackson Way. Improvement plans shall provide for information on nearby existing trees as specified in Condition #11 and be accompanied by: A. Two copies of the June 1996 Tree Report prepared by Hortscience, Inc. referenced in Condition LE. identifying trees within the project to be saved; B. Two copies of an updated report from a licensed arborist on the proposed Jackson Way frontage improvement plans indicating measures to assure avoidance of damage by construction activity of the trees which are in the vicinity of the proposed improvements. C. The recommended tree protection measures of the arborist shall be integrated into the improvement plans, and shall be stampted by the arborist as evidence that all applicable measures have been integrated into the improvement plans. 49. Applicant shall provide a 0.9 meter (3-foot±) public utility and sidewalk easement behind the right of way line along the entire frontage of Danville Boulevard, or, provide a public utility and sidewalk easement behind the right of way line that extends to a distance of 0.9 meters (3-feet±) behind the sidewalk, whichever distance is greater. Street Lighting: 50. Applicant shall apply for annexation to County Service Area L-100 for maintenance of public street lighting prior to filing the first Final Map. Annexation does not imply a requirement to install street lights. 51. Street lights shall be installed along the frontage of Danville Boulevard and along the commercial frontage of Orchard Court. The final number and location of the lights shall be determined by the Public Works Department. 52. Street lights shall be installed along the park frontage of Jackson Way and along the commercial frontage of Orchard Court. The final number and location of the lights shall be determined by the Public Works Department. Pedestrian Facilities: SUB-14 Public Works Conditions of Approval 53. All public pedestrian facilities and access ways shall be designed in accordance with Title 24 (Handicap access) and the Americans with Disabilities Act. This shall include all sidewalks, paths, trails, driveway depressions, as well as handicap ramps. Parking: 54. "No Parking" signs shall be installed along Danville Boulevard, subject to the review and approval of the Public Works Department. 55. "No Parking" signs shall be installed along the south side of Jackson Way, from Danville Boulevard east to the end of the project frontage, subject to the review and approval of the Public Works Department. 56. "No Parking" signs shall be installed along the north side of Jackson Way, between Danville Boulevard and Garden Estates Court, subject to the review and approval of the Public Works Department. 57. "No Parking" signs shall be installed along Orchard Court, from Danville Boulevard to the east side of the commercial driveway access, subject to the review and approval of Public Works. Utilities/Undergrounding: 58. All utility distribution facilities shall be installed underground, including existing overhead distribution facilities, if any, along the frontage of Danville Boulevard, Orchard Court and Jackson Way. Maintenance of Facilities: 59. Applicant shall develop and enter into a maintenance agreement that will insure that the proposed private road (Orchard Lane) will be maintained, and that each parcel in this subdivision that will use the proposed private road will share in its maintenance. Drainage Improvements: 60. Division 914 of the Ordinance Code requires that all storm waters entering or originating within the subject property shall be conveyed, without diversion and within an adequate storm drainage facility, to a natural watercourse having definable bed and banks, or to an existing adequate public storm drainage facility which conveys the storm waters to a natural watercourse. SUB-15 Alamo Orchards&Oak Tree Plaza Subdivision 8051 61. Applicant shall verify the adequacy of any downstream public drainage facility that will receive run-off from this project. 62. Storm drainage facilities required by Division 914 shall be designed and constructed in accordance with specifications outlined in Division 914 and in compliance with design standards of the Public Works Department. 63. Storm drainage originating on the property and conveyed in a concentrated manner shall be prevented from draining across the sidewalk(s) and driveway(s). 64. The applicant shall install within a dedicated drainage easement any portion of the drainage system which conveys run-off from public streets. 65. To reduce the impact of additional storm water run-off from this development on San Ramon Creek, 0.76 m3 (one cubic yard) of channel excavation material will be removed from an inadequate portion of San Ramon Creek for each 4.6 m2(50 square feet) of new impervious surface area created by the development. All excavated material shall be disposed of off-site by the developer at his cost. The site selection, land rights, and construction staking will be by the Flood Control District. 66. Upon written request, the applicant may make a cash payment in lieu of actual excavation and removal of material from the creek. The cash payment will be calculated at the rate of $1.08 per m2($0.10 per square foot) of new impervious surface area created by the development. The added impervious surface area created by the development will be based on the Flood Control District's standard impervious surface area ordinance. The Flood Control District will use these funds to work on the creek annually. National Pollution Discharge Elimination System: 67. Applicant shall comply with all rules, regulations and procedures of the National Pollutant Discharge Elimination Systems. 68. Applicant shall obtain a General Construction Activity Storm Water Permit. A Notice of Intent for this permit shall be submitted to the State Water Resources Control Board and a copy of the Notice provided to Building Inspection prior to the issuance of a Grading Permit. A storm water pollution prevention plan(SWPPP)and monitoring program may be required with this permit. 69. Prior to filing the first Final Map, applicant shall develop a comprehensive storm water quality plan for the reduction or elimination of storm water pollutants as a result of this project. This plan and project design shall incorporate some or all of the following long- SUB-16 Public Works Conditions of Approval term BMP's in accordance with the Contra Costa Clean Water Program for the site's storm water drainage. - Shallow roadside swales. Curb may be eliminated along Orchard Lane, subject to the review of Public Works. - Use of pavers for driveways and household walkways. This will reduce the amount of directly connected impervious surface area. - Filtering inlets. - Stencil all storm drain inlets with"No Dumping Drains To Delta" using thermoplastic tape. - Street sweeping. Street sweeping shall occur at least once a year between September 1 and October 15. Verification shall be submitted to the Contra Costa Clean Water Program. - Annual public education. - Other alternatives as approved by the Public Works Department. 70. Development and implementation of BMP's for this project may require the modification of the project site plan and/or the provision of additional road right of way beyond that which is required by these conditions of approval and/or the elimination of lots. 71. Applicant shall submit a storm water quality maintenance plan. This plan shall demonstrate a secure and perpetual funding source and maintenance entity that shall be responsible for maintenance of clean water/private drainage facilities. 72. The storm water quality plan and maintenance plan shall be subject to the review of Public Works and the review and approval of the Zoning Administrator. Fees: 73. Applicant shall comply with the requirements of the Bridge/Thoroughfare Fee Ordinance for the Alamo Area of Benefit as adopted by the Board of Supervisors. The applicant shall pay the Alamo Area of Benefit fee in effect at the time of Building Permit issuance, unless the applicant's vesting rights under the vesting tentative map are in effect in which case the applicant shall pay the fee in effect at time of the effective date of the adoption of County File#RZ963045. 74. Applicant shall comply with the adopted Ordinance requirements for the Southern Contra Costa Fee Areas (Southern Contra Costa Regional Fund only) as outlined in the SCC JEPA. 75. Applicant shall be required to comply with the drainage fee requirements for Drainage Area 13 as adopted by the Board of Supervisors. SUB-17 Alamo Orchards&Oak Tree Plaza Subdivision 8051 Metric Units: 76. The County Public Works Department is requiring that all first check submittals and accompanying calculations including subdivision grading plans, improvement plans, hydrology and hydraulic maps, final maps, parcel maps, right of way plat maps and descriptions will be in metric units. Exceptions may be permitted by the Public Works Department, Engineering Services Division, based upon evidence of substantial hardship. Construction Period Restrictions 77. Contractor and/or developer shall comply with the following construction, noise, dust and litter control requirements: A. Limitation on Noise Generating Construction Activit X-Noise generating construction activities, including such things as power generators playing loud music or radios, shall be limited to the hours of 8:00 A.M. to 5 P.M., Monday through Friday, and shall be prohibited on state and federal holidays. The restrictions on allowed working days may be modified on prior written approval by the Zoning Administrator. B. Limitations on Contractors and Subcontractors - The project sponsor shall require their contractors and subcontractors to fit all internal combustion engines with mufflers which are in good condition and shall locate stationary noise-generating equipment such as air compressors and concrete pumpers as far away from existing residences as possible. C. Notification of Neighbors and CDD Prior to Commencement of Grading Activity- At least one week prior to commencement of grading, the applicant shall post the site and mail to the owners of property within 300 feet of the exterior boundary of the project site notice that construction work will commence. The notice shall include a list of contact persons with name, title, phone number and area of responsibility. The person responsible for maintaining the list shall be included. The list shall be kept current at all times and shall consist of persons with authority to indicate and implement corrective action in their area of responsibility. The names of individuals responsible for noise and litter control, tree protection, construction traffic and vehicles, erosion control, and the 24-hour emergency number, shall be expressly identified in the notice. The notice shall be re-issued with each phase of major grading and construction activity. SUB-18 Setting of Vesting Date A copy of the notice shall be concurrently transmitted to the Community Development Department. The notice shall be accompanied by a list of the names and addresses of the property owners noticed, and a map identifying the area noticed. D. Litter Control - The applicant shall be responsible for making a good-faith effort at keeping the construction site in a litter-free state as reasonably possible. E. Avoid Interference with Neighborhood Traffic - The applicant shall make a good- faith effort to avoid interference with existing neighborhood traffic flows. Prior to issuance of building permits, the proposed roads serving this development shall be constructed to provide access to each lot. This shall include provision for an on- site area in which to park earth moving equipment. F. Transporting of heavy equipment and trucks shall be limited to week days between the hours of 9:00 AM and 4:00 PM. G. The site shall be maintained in an orderly fashion. Following the cessation of construction activity, all construction debris shall be removed from the site. 78. Discovery of Archaeological Materials - Should archaeological or other historical materials be uncovered during grading, trenching or other on-site excavation(s), earthwork within 30 yards of these materials shall be stopped until a professional archaeologist who is certified by the Society of Professional Archaeology(SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitiga- tion(s), if deemed necessary. 79. Tree Protection During Construction -Development shall be in accord with the Tree Protection Measures During Construction identified on page 11 of the Hortscience report. Setting of Vesting Date for Purposes of Determining Substantial Compliance with Ordinances (including Fees), Policies, and Regulations, and Fee Credit for Existing Residences 80. Setting of Vesting Date - Approval of Rezoning File#RZ953045 is conditioned to require that the Vesting Date for purposes of this Vesting Tentative Map and determining substantial compliance with ordinances (including fees), policies, and regulations has been set at the date that the new zoning on the property went into effect. 81. Credit for Fees Charged on a Per Residence Basis- The applicant shall be given credit for fees assessed on a per residence basis (traffic, park dedication, etc.) for the six residences SUB-19 Alamo Orchards&Oak Tree Plaza Setting of Vesting Date Subdivision 8051 that existed at the site at time of rezoning application submittal or at time of commencement of processing development applications at this site. SUB-20 AdvisoryNotes Advisory Notes PLEASE NOTE ADVISORY NOTES ARE ATTACHED TO THE CONDITIONS OF APPROVAL BUT ARE NOT A PART OF THE CONDITIONS OF APPROVAL. ADVIOSRY NOTES ARE PROVIDED FOR THE PURPOSE OF INFORMING APPLICANTS OF OTHER LEGAL REQUIREMENTS THAT MUST BE SATISFIED IN ORDER FOR DEVELOPMENT TO PROCEED. A. Fish & Game Requirements - This project may be subject to the requirements of the Department of Fish and Game. It is the applicant's responsibility to notify the Department of Fish and Game, P.O. Box 47, Yountville, California 94599, of any proposed construction within this development that may affect any fish and wildlife resources, per the Fish and Game Code. B. Army Corps of Engineers RequirementsThis project may be subject to the requirements of the U.S. Army Corps of Engineers. It is the applicant's responsibility to notify the appropriate district of the Corps of Engineers to determine if a permit is required, and if it can be obtained. C. Comply with the requirements of the Central Sanitary District. D. Comply with the requirements of the San Ramon Valley Fire Protection District. E. Comply with the requirements of the Health Services Department, Environmental Health Division. Existing septic tanks and old wells shall be destructed under Environmental Health permits and inspections (646-2521). F. Comply with the requirements of the Building Inspection Department. Building permits are required prior to the construction of most structures. G. Vesting-This project is subject to the development fees in effect under County Ordinance as of the date that adoption of Rezoning File #RZ963045 becomes effective pursuant to the approval of that rezoning. For purposes of the vesting tentative map, that date shall serve as the vesting date for development within this project. The following fees are in addition to any other development fees which may be specified in the conditions of approval. The fees include but are not limited to the following: Child Care $400 per residence. An estimate of the fee charges for each approved lot may be obtained by contacting the Building Inspection Department at 335-1192. SUB-21 Alamo Orchards&Oak Tree Plaza Subdivision 8051 H. Expiration of Vested Rights: Pursuant to Section 66452.6(g) of the Subdivision Map act, the rights conferred by the vesting tentative map as provided by Chapter 4.5 of the Subdivision Map act shall last for an initial period of two (2) years following the recording date of the final/parcel map. These rights pertain to development fees and regulations. Where several final maps are recorded on various phases of a project covered by a single vesting tentative map, the initial time period shall begin for each phase when the final map for that phase is recorded. At any time prior to the expiration of the initial time period, the subdivider may apply for a one- year extension. The application shall be accompanied by the applicable filing fee. If the extension is denied by an advisory agency, the subdivider may appeal that denial to the Board of Supervisors by filing a letter of appeal with the appropriate filing fee with the Clerk of the Board within 15 calendar days. The initial time period may also be subject to automatic extension pursuant to other provisions of Section 66452.6(g) relating to processing of related development applications by the County. At the expiration of the vesting time period, remaining development (i.e., new building permits) within the subdivision shall be subject to development fees and regulations in effect at that time. I. Police Services District Election Fee and Annual Per Parcel Fee - The applicant is advised that the tax for the police services district is currently set by the Board of Supervisors at $200 per parcel annually(with appropriate future Consumer Price Index(CPI) adjustments). The annual fee is subject to modification by the Board of Supervisors in the future. The current fee for holding the election is$800 and is also subject to modification in the future. The applicable tax and fee amounts will be those established by the Board at the time of voting. The applicant is advised that the election process takes from 3 to 4 months and must be completed prior to the acceptance of the Final Map. J. Dust Control - Comply with the dust control requirements of the Ordinance Code which is administered by the Building Inspection Department, Grading Division(335-1119). K. School District Fees - At time of issuance of building permits, the applicant shall pay any applicable fees to the San Ramon Valley Unified School District. l:\groups\cdadpoo1\bob\sd96805 Lcoa RD\ rev 5/13/97-rd SUB-22 FINDINGS AND CONDITIONS OF APPROVAL FOR FINAL DEVELOPMENT PLAN FILE #DP963030 (Alamo Orchards & Oak Tree Plaza) (Alamo Orchards, LLC - Applicant; Hall & Lindemann - Owners) Per May 13, 1997 Board of Supervisors Approval FINDINGS A. Planned Unit District 1. The applicant intends to start construction within two and one-half years from the effective date of the zoning change and plan approval, 2. The proposed planned unit development is consistent with the county general plan; 3. In the case of residential development, it will constitute a residential environment of sustained desirability and stability, and will be in harmony with the character of the surrounding neighborhood and community; 4. In the case of commercial development, it is needed at the proposed location to provide adequate commercial facilities of the type proposed, and that traffic congestions will not likely be created by the proposed center, or will be obviated by presently projected improvments and by demonstrable provisions in the plan for proper entrances and exits, and by internal provisions for traffic and parking, and that the development will be an attractive and efficient center which will fit harmoniously into and will have no adverse effects upon the adjacent or surrounding development; 5. The development of a harmonious integrated plan justifies exceptions from the normal application of this code. (Ref. §84-66.1406 of the County Code) B. Variances to Parking Design Standards 1. The variance authorized does not constitute a grant of special privilege inconsistent with the limitations on other properties in the vicinity and the respective land use district in which the subject property is located. 2. That because of special circumstances applicable to the subject property because of its size, shape, topography, location or surroundings, the strict application of the respective zoning regulations is found to deprive the subject property of rights enjoyed by other properties in the vicinity and within the identical land use district. Final Development Plan File#DP963030 Alamo Orchards&Oak Tree Plaza 3. The variance authorized substantially meets the intent and purpose of the respective land use district in which the subject property is located. (Ref. §26-2.2006 of the County Code) CONDITIONS OF APPROVAL General 1. This Final Development Plan is approved as generally shown on the following plans and related documents: A. Alamo Orchards & Oak Tree Plaza Final Development Plan booklet, dated 9/20/96. B. As modified by a revised site plan prepared by George Swallow and Associates dated 1/29/97 entitled"Scheme" B, Compromise Proposal to Public Works, except that this design shall be modified to conform to conditions contained in the approval of Vesting Tentative Map 8051 affecting the same property. C. Tree Report, Oak Plaza/Alamo Orchards, dated June 1996, prepared by Flortscience, Inc. (James R. Clark, Certified Arborist) 2. This project is approved for 16 residential lots, three retail commercial lots, and an open space pocket park. 3. Phasing of Development - Prior to issuance of a certificate of occupancy on any of the commercial structures on Lots 17 - 19, a certificate of occupancy for a residence shall have been issued on at least one each of the two sets of lots listed below: Lots 1 - 13 (Orchard Court/Lane); and Lots 14 - 16 (Jackson Way). DP-2 Final Development Plan File#DP963030 Alamo Orchards&Oak Tree Plaza Development Requirements for Retail Shopping Area 4. Consistency with Plans Approved at Time of Final Map -Development shall be in accord with the revised site plan and final landscape plans approved by the Zoning Administrator prior to approval of the final map. 5. Siszn Restrictions and Sign Review Program - This site shall be subject to the restrictions of the S-2, Sign Control Combining District (Chapter 88-9). Prior to issuance of the first building permit for the commercial lots, the applicant shall submit a sign control program for the review and approval of the Zoning Administrator, and pay the required processing fee. A. The project shall be limited to one free-standing sign whose content shall be limited to identifying the generic name of the shopping center and street address, unless the entire three lots is occupied by a single tenant in which case that tenant's name may appear on the sign. In other instances, tenant identification shall be limited to wall mounted signs or signs hung over the esplanade. B. The proposed monument sign at the intersection of Danville Boulevard and Orchard Court is denied. 6. Review of Development Plans -Prior to issuance of a building permit for any of the proposed commercial structures, the applicant shall submit the construction plans for the review and approval of the Zoning Administrator. The plans shall be accompanied by a color palette and sample exterior materials. The roofs and exterior walls of the buildings shall be free of such objects as air conditioning or utility equipment, television aerials, etc. , or screened from view. Colors of roofs and exterior materials shall not be reflective from a distance. A. The plans shall provide refuse disposal areas to serve all tenants. These areas shall be enclosed and roofed while providing necessary openings for ventilation. The exterior of the refuse disposal areas shall match the design of the main commercial building. B. The plans shall incorporate any recommendations in the approved acoustic report required at time of filing the final map. Any applicable recommendations shall be noted on the construction plans and otherwise integrated into the design of the structure. 7. Installation of Landscape Improvements for Commercial Complex and Park-Prior to issuance of the first commercial building permit, the applicant shall DP-3 Final Development Plan File#DP963030 Alamo Orchards&Oak Tree Plaza • provide two copies of a detailed cost estimate prepared by a licensed landscape architect or licensed landscape contractor of the landscape, irrigation, and development plans for the commercial and park areas that have been approved by the Zoning Administrator. The estimate shall be subject to review and approval of the Zoning Administrator following opportunity to comment by the Special Districts Coordinator of the Public Works Department (335-2253). • provide a bond or other security acceptable to the Zoning Administrator in the amount of the approved estimate. The security shall assure that (1) the approved improvements are timely installed and (2) assure the replacement of any approved plants and/or irrigation improvements that fail or are failing in the year following the initial acceptance of the improvements by the Zoning Administrator as complete. The security shall be retained by the County at least 12 months following the initial acceptance of the improvements. The security shall be accompanied by the appropriate processing fee (check with the Community Development Department staff person for filing fee amount.) At least two weeks prior to seeking the certificate of occupancy of the first commercial building permit, the applicant's landscape contractor or landscape architect shall notify in writing the Zoning Administrator and Special Districts Coordinator that the improvements in the approved landscape plan (including irrigation, masonry wall and other development improvements) have been completed in accord with the approved plans. Until the Zoning Administrator verifies substantial completion of the approved improvements, the certificate of occupancy shall not be issued. 8. Maintenance of Approved Landscaping - Owners of the commercial complex shall be responsible for maintaining the approved landscaping and irrigation for the commercial complex, and frontage area within the public right-of-way in good condition at all times. 9. Variances to the Standards of the Off-Street Parking Ordinance - Variances to the requirements of the Off-Street Parking Ordinance are approved as follows: A. All spaces - A two-foot overhang is allowed provided that it does not encroach on the required on-site minimum four-foot planter strip. (The ordinance does not allow overhang of parking spaces.) B. 15 spaces - 8 foot x 17 foot (compact) parking spaces. 10. Lighting -Exterior lighting shall be designed so as to avoid off-site glare. Prior to issuance of building permits allowing for exterior lighting, construction plans shall be DP-4 Final Development Plan File#DP963030 Alamo Orchards&Oak Tree Plaza submitted for the review and approval of the Zoning Administrator to demonstrate how this objective shall be maintained. Allowed, Restricted and Prohibited Uses within the Project 11. Permitted Uses -Except as otherwise listed below, permitted uses within the Retail portion of this site shall allow for carrying on of a retail business as defined in Section 82- 4.216 of the County Code provided all the sales, demonstrations, displays, services and other activities of the retail business are conducted within an enclosed building, except that off-street parking and loading shall be permitted. 12. Restricted Uses -Prior to the establishment of any of the below listed uses, the following shall apply: A. Dry Cleaning - The applicant shall provide evidence that from the Health Services Department, Environmental Health Division, Hazardous Materials Section that the proposed use complies with the hazardous materials laws; and from the Bay Area Air Quality Management District, that the operation will comply with the laws administered by the District concerning air quality. Further, any dry cleaning operation shall be limitied to drop-off and pick-up of goods; on-site processing is prohibited. B. Loading Activity - Loading activity serving the commercial tenants shall be conducted on the commercial site, not on the public street or park, and not within 15 feet of a residential property. 13. Uses Requiring Approval of an Application for Modification to the Final Development Plan - Prior to establishment, the following activities shall require approval of an application to modify the final development plan: A. Other retail businesses where the sales, demonstrations, displays, services and other activities, or some of them are conducted other than in an enclosed building. B. Animal hospital or commercial dog kennel. C. Commercial radio and television receiving and transmitting facilities other than broadcasting studios and business offices. DP-5 Final Development Plan File#DP963030 Alamo Orchards&Oak Tree Plaza D. Religious institutions, parochial and private schools including nursery schools. E. Community clubs and activities of a quasi-public, social, fraternal or recreational character. F. Eleemosynary and philanthropic institutions. 14. Uses Requiring Approval of a Land Use Permit - Prior to establishment, the following activities will be required to apply for and obtain a land use permit pursuant to the referenced Chapter of the Zoning Code as indicated below: A. Use or storage of a significant amount of hazardous materials in accord with the applicable hazardous materials ordinance. 15. Prohibited Land Uses - The following land uses shall be prohibited within any portion of the project: churches, hospitals, hotels, motels, convalescent homes, adult entertainment business, sale of firearms, cabaret, restaurant, take-out food operation, and retail liquor stores. Residential Lots (Lots 1 - 16) 16. Construction plans of all lots shall all provide for the following: A. Automatic sectional garage doors. B. Landscape/irrigation fencing plans for the frontyard areas certified for compliance by a suitable professional for compliance with the Water Conservation Landscaping in New Developments Ordinance. The landscaping and fencing shall be installed prior to issuance of certificate of occupancy of the residential unit. C. Construction plans on lots containing existing trees to be protected shall referred to a consulting licensed arborist at the applicant's expense to advise as to appropriate protective measures in accord with the recommendations in the 6/96 Hortscience Tree Report. D. The plans shall incorporate any recommendations in the approved acoustic report required at time of filing the final map. Any applicable recommendations shall be DP-6 Final Development Plan File#DP963030 Alamo Orchards&Oak Tree Plaza noted on the construction plans and otherwise integrated into the design of the structure. 17. The guide for development including dimensional and use requirements shall be the Single Family Residential District, R-6, except as follows: A. Lots 1 - 13 (Orchard Court/Lane) 1) Development shall be limited to two stories. 2) The structure setback at face of garage shall be at least 16 feet from edge of sidewalk or edge of street whichever is nearer for Lots 1 - 10 (Orchard Lane), and shall be at least 20 feet for Lots 11 - 13 (Orchard Court). The balance of the structure shall be setback at least 20 feet from edge of sidewalk or edge of fronting street whichever is nearer, except Lots 4 and 7, which may be placed within 5 feet of the edge of fronting street. 3) The rearyard setback shall be at least 15 feet. 4) Development shall be in accord with the side and rear elevations approved at time of filing the final map. B. Lots 14 - 16 (Jackson Way) 1) Development shall be limited to one story. 2) Frontyard structure setback at the garage measured from edge of sidewalk shall be at least 20 feet; otherwise it shall be at least 15 feet. 3) The rearyard setback shall be at least 13 feet. 4) The minimum sideyard setback shall be at least five feet with an aggregate sideyard setback of at least 15 feet. All dimensional requirements are subject to further review and approval by the Zoning Administrator prior to issuance of a building permit. Any modification of these requirements shall be as determined by the Zoning Administrator. 1:\groups\cdadpool\bob\dp963030.coa RD\ rev.5/13/97-rd DP-7