Loading...
HomeMy WebLinkAboutMINUTES - 05131997 - C46 TO: BOARD OF SUPERVISORS FROM: PHIL BATCHELOR,COUNTY ADMINISTRATOR DATE: SUBJECT: APPROVING AND AUTHORIZING THE ISSUANCE OF A CHANGE ORDER TO THE CONTRACT FOR BID PACKAGE NO.3-CONSTRUCTION OF NEW HOSPITAL,2500 ALHAMBRA AVENUE,MARTINEZ(WH580B) SPECIFIC REQUEST(S)OR RECOM1v1ENDATION(S)&BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE the issuance of Change Order No. 98 to the Contract dated February 7, 1995 issued to Centex Golden Construction Co. for the Construction of a New Hospital at 2500 Alhambra Avenue, Martinez, and AUTHORIZE the County Administrator or his designee to execute the Change Order. II. FINANCIAL IMPACT Change Order No. 98 totals$126,407.00. Funds in the capital account established for the project are sufficient to cover the amount encumbered by this contract,from bond proceeds specified to the project. Bond financing for the total project cost was secured in May, 1992 in accordance with the Board of Supervisors'direction. CONTINUED ON ATTACHMENT: X YES SIGNATURE: Z A r7,, RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON 17 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN UNANIMOUS(ABSENT ) AND ENTERED ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. AYES: NOES: ABSENT: ABSTAIN: ATTESTED PHIL BATCHELOR,CLARK OF THE�ARD OF SUPERVISORS AND COUNTY ADMINISTRATOR CONTACT: D.Bell,CAO 4 CC: Auditor/Controller BY ,DEPUTY GSD(Accounting) O=Brien-Kreitzberg(via CAO) Contractor(Via CAO) Page 1 of 2 Board Order to Approve Issuance of a Change Order for Merrithew Memorial Hospital Replacement Project Bid Package No. 3 III. REASONS FOR RECOMMENDATIONS Change Order No. 98 will provide for the following: Proposed Change Order No. 399-U9,U10 Med Gas Outlets,Electrical Outlets $30,477.00 To enhance the function and consistency of the medical gas headwalls, the Owner decided that a pre-manufactured medical gas headwall should replace the individual headwall utilities. During an Owner review, the nursing staff requested a modification to the organization of the medical gas outlets within the pre-manufactured units. Proposed Change Order No.460-Change Patient Room Sinks $25,656.00 The architectural plan located the patient room sinks on an angled wall directly adjacent to the room entrance door. During mockup review, it was discovered that a patient bed would hit the sink when moved in or out of the room. The sinks were changed to a smaller model (Eljer 051- 1384)to allow clearance between the bed and the edge of sink. Proposed Change Order No.478-Changed Connections for Piping System $37,892.00 Mechanical drawings depicted thermal/vibration flex connections for piping systems entering the hospital below grade. Based on review of the anticipated structural movement, the Engineer has determined that seismic flex connections are required on the oxygen, domestic cold water and fuel oil systems. Proposed Change Order No. 538-Cooling Tower for Future Lab Building Use $32,382.00 In order to leverage existing utility services, the Owner has requested that the new lab building utilize the existing hospital's central plant for chilled water and electrical service. The concept and potential impacts were determined to be acceptable during the Lab value engineering session held in early March 1997. In order to minimize time impacts, the Contractor was authorized to purchase and install an additional cooling tower. The new guaranteed maximum cost will exceed the total estimated cost stated in the construction contract agreement approved by the Board on February 7, 1995. The new guaranteed maximum cost will total$47,145,498.00. i Page 2 of 2