HomeMy WebLinkAboutMINUTES - 03111997 - C49 TO: BOARD OF SUPERVISORS FROM: PHIL BATCHELOR,COUNTY ADMINISTRATOR DATE: SUBJECT: APPROVING AND AUTHORIZING THE ISSUANCE OF A CHANGE ORDER TO THE CONTRACT FOR BID PACKAGE NO.3-CONSTRUCTION OF NEW HOSPITAL,2500 ALHAMBRA AVENUE,MARTINEZ(WH580B) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE the issuance of Change Order No.89 and 90 to the Contract dated February 7, 1995 issued to Centex Golden Construction Co. for the Construction of a New Hospital at 2500 Alhambra Avenue, Martinez, and AUTHORIZE the County Administrator or his designee to execute the Change Order. II. FINANCIAL IMPACT Change Order No. 89 totals$82,590 and Change Order No. 90 totals$240,880. Funds in the capital account established for the project are sufficient to cover the,amount encumbered by this contract, from bond proceeds specified to the project. Bond financing for the total project cost was secured in May, 1992 in accordance with the Board of Supervisors' direction. CONTINUED ON ATTACHMENT: X YES SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): / ACTION OF BOARD ON �J _//�99 APPROVED AS RECOMMENDED ✓ OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN UNANIMOUS(ABSENT ) AND ENTERED,ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. AYES: NOES: ABSENT: ABSTAIN- ATTESTED PHIL BATCHELOR,CLERK OF HE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR CONTACT: D.Bell,CAO CC: Auditor/Controller BY DEPUTY GSD(Accounting) O'Brien-Kreitzberg(via CAO) Contractor(Via CAO) Page 1 of 2 Board Order to Approve Issuance of a Change Order for Merrithew Memorial Hospital Replacement Project Bid Package No.3 III. REASONS FOR RECOMMENDATIONS Change Order No. 89 will provide for the following: Proposed Change Order No.276-Fire Marshal Submittal Review Issues $82,590.00 As part of the OSHPD Fire Marshal submittal review, a variety of changes were issued which affected the location and number of smoke detectors and strobe lights. This change also resulted in revised.details for the construction of fire rated partitions. Change Order No.90 will provide for the following: Proposed Change Order No 257-(Owner Change Request No 11-Radiology Equipment Utility Changes $80,582.00 Due to recent General Electric radiology equipment changes, a variety of electrical circuit and conduit changes resulted. These changes responded to revised power demands and conduit routing. Proposed Change Order No.282-Revisions to the Psych Unit Balconies $41,794.00 Following the issuance of the 4th floor Psych Unit changes, conflict with structural framing and window units on the two outdoor balconies were identified as shop drawings were prepared by the contractor. As a result, revised structural calculations and framing details were issued correcting this problem. Proposed Change Order No.405-Owner-Change Request No.52-Imaging Department Film Processing and Remote Diagnosis Stations $47,782.00 The revised County-purchased radiology equipment included digital images which can be displayed at remote diagnosis stations and printed without film negatives. This new technology resulted in additional signal cable conduit to the film processors and remote diagnostic stations. Proposed Change Order No.422-Owner Change Request No 53-Upgraded Nurse Call S ste $70,722.00 Since the award of the hospital project, the nurse call system manufacturer issued a new, upgraded system known as Responder IV. This system provides greater flexibility which can better accommodate the nurse staffing changes developing as part of evolving managed care requirements. The new guaranteed maximum cost will exceed the total estimated cost stated in the construction contract agreement approved by the Board on February 7, 1995. The new guaranteed maximum cost will total$46,857.336.00. Page 2 of 2