HomeMy WebLinkAboutMINUTES - 06041996 - C65 TO: BOARD OF SUPERVISORS FROM: PHIL BATCHELOR,COUNTY ADMINISTRATOR DATE: SUBJECT: APPROVING AND AUTHORIZING THE ISSUANCE OF A CHANGE ORDER TO THE CONTRACT FOR BID PACKAGE NO.3-CONSTRUCTION OF NEW HOSPITAL,2500 ALHAMBRA AVENUE,MARTINEZ(WH580B) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE Change Order No. 36 to the Contract dated February 7, 1995 issued to Centex Golden Construction Co. for the Construction of a New Hospital, Associated Site and Hardscape and Landscape at 2500 Alhambra Avenue, Martinez, and AUTHORIZE the County Administrator or his designee to execute the Change Order. IL FINANCIAL IMPACT Funds in the capital account established for the project are sufficient to cover the amount encumbered by this contract,from bond proceeds specified to the project. Bond financing for the total project cost was secured in May, 1992 in accordance with the Board of Supervisors' direction. 1 CONTINUED ON ATTACHMENT: YES SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON JUN ® 4 1996 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN —UNANIMOUS(ABSENT ) AND ENTERED ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. AYES: NOES: ABSENT: ABSTAIN: ATTESTED JUN 0 4 1996 PHIL BATCHELOR,CLERK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR CONTACT: D.Bell,CAO CC: Auditor/Controller BY DEPUTY GSD(Accounting) O'Brien-Kreitzberg(via CAO) Contractor(Via CAO) Page 1 of 2 Board Order to Approve Change Order No.36 for Merrithew Memorial Hospital Replacement Project Bid Package No.3 III. REASONS FOR RECOMMENDATIONS On February 7, 1995,the County awarded the contract to the lowest responsive and responsible bidder,Centex Golden Construction Co. Since the last Board Order,the following Change Orders have been approved: No.28 through 35. Change Order No.36 in the amount of$270,502.00 provides for: (1) Revisions to the electrical drawings and specifications due to changes made after contract award. (2) Revision of the glass and curtain wall system due to changes made after contract award. (3) Revision of the HVAC return air duct insulation as required by mechanical changes made after contract award. (4) Installation of conduits from the administration building to the existing telecommunications room to provide for future installation of cables for secondary monitoring. The contract for this work is to be awarded to an MBE/WBE contractor. (5)Adding a coiling fire door assembly at room 3331 and additional fire signal circuits to rooms 1212A, 1212B, 1304A,2317,3546 and 3514. (6)Advance purchase of air handling unit for 4th,5th floor remodel in order to guarantee delivery date. The new guaranteed maximum cost will exceed the total estimated cost stated in the construction contract agreement approved Iby the Board on February 7, 1995. The new guaranteed maximum cost will be$41,260,176.00,an increase of$1,776,176.00 from the original award. Change Order No. 1 through No.27 $1,335,365.00 Change Order No.28 $ 18,885.00 Change Order No.29 14,745.00 Change Order No.30 24,875.00 Change Order No.31 23,874.00 Change Order No.32 22,454.00 Change Order No.33 22,884.00 Change Order No.34 24,969.00 Change Order No.35 17,623.00 Change Order No.36 270.502.00 440.811.00 $1,776,176.00 Page 2 of 2 I